Attachment_1_-_Statement_of_Requirements_Amendment_1.pdf
PDF 172 KB Posted
- Solicitation number
- HSCG23-14-R-MPE209
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1 - Attachment 1
HSCG23-14-R-MPE209
2.8.2 Interagency coordination support for execution of the mission.
2.8.3 Public information and social media support for execution of the mission.
tion of the mission.
2.8.5 at
2.8.6
2.8.7
2.8.8 port for execution of the mission.
.1 Support execution of the mission.
into other GIS viewers via a centralized data
2.8.4 Safety system management to support execu
Oper ional execution of the mission.
Planning for execution of the mission.
Logistical support for execution of the mission.
Financial documentation and sup
2.8.9 Resource management of the mission.
2.8.10 Situational awareness and dissemination process to:
2.8.10
2.8.10.2 Provide information and communications flow to agency leadership, maritime stakeholders, and the public.
2.8.10.3 Develop and disseminate open source Geographic Information System (GIS) data layers that can be imported set updated in near real time (near real time is defined as I timeframe of <=60 seconds).
2.8.11 Simulation and exercise support.
2.8.12 Preplanning and development of Contingency Plans, draft IAPs, response data to support a more efficient initial incident respon and geographic se and development er contract ts, es shall rdance standard liver the files to nment to access, migrate, and convert this section not d users authorized per site.
of the initial IAP.
T an t2.9 he Government owns all data entered into the database. Not more th year, USCG may require that the Contractor provide files that contain d developed using the softwar ard data set formats. In acco uest, the Contractor shall de wice p all produc
e. The filesigns, drawings and outputs that USCG comply with section 3.2.5 and 3.9.1 stand industry practice and within 30 days of req U t
SCG and provide assistance that enables the Gover o database into useable formats.
3 MINIMUM SYSTEM REQUIREMENTS
the minimum requirements of
The C no late tractor’s system and software shall meet r than 120 days after the contract award date.
3.1 The system shall:
3.1.1 nclude individual site licenses for 300 USCG‐approveI
HSCG23 -MPE209
incident being run using other commercial Incident Management Systems for situations where the USCG is relying on other Unified Command members for Incident Action Planning services.
-14-R
3.2.11
3.2.12
3.2.13
3.2.14
3.2.15
3.2.16
3.2.17
3.3 U
3.3.1 d
Have capability for a minimum of 2,800 concurrent users for routine operations and a maximum of 5,600 concurrent users for surge operations. Surge operations shall not cause system degradation that negatively impacts user processing time.
Have controls to restrict access to sensitive security information (SSI).
Maintain a redundant real time backup system.
less
Have system availability 24/7/365 with 99% up time.
Have a disaster recovery capability to reestablish full operating capability in no than 1 hr with 100% data integrity.
Have the ability to integrate and update USCG provided incident response templates.
Have the ability to track and audit user actions by date/time stamp.
sers and Access Control capabilities shall:
Maintain Department of Homeland Security (DHS)/Defense Information System Agency (DISA) approved federated account/user management system. License em provides initial user registration, authentication capability by syst administrators.
3.3.2 Meet or be upgraded prior to USCG use to meet the user access and security requirements set forth in the DHS Management Directive 4900, Individual use an operation of DHS Information Systems/computers.
http://www.dhs.gov/xlibrary/assets/foia/mgmt_directive_4900_individual_use_an d_operation_of_dhs_information_systems_computers.pdf
3.3.3 Be compliant with Homeland Security Presidential Directive 12 (HSPD‐12).
3.3.4 Maintain version control capabilities with near real time track changes and abi roll back to previous versions.
lity to
3.3.5 Have the ability to define user roles, access, responsibilities, and authorities.
3.3.6 Have the ability to create user roles, access, responsibilities, and authorities based on ICS position described in the USCG Incident Management Handbook (CG‐IMH) 2014 edition. https://homeport.uscg.mil/ics.
roles and responsibilitie3.3.7 Have the ability to assign system administrator members.
s to USCG
HSCG 3-2
ey are y
ICS
14-R-MPE209
3.3.8 Have a comprehensive user management feature to control access to the system, create user accounts, manage user permissions, etc.
nt. 3.3.9 Have the ability to restrict user access based on role, unit, agency, or incide
3.3.10 Have the ability to limit users from viewing and/or editing incidents that th dent bnot assigned in order to prevent personnel from editing another inci accident.
3.3.11 Push notifications to users based on required action on a form/process based on position.
3.4 Command and Control of the mission capabilities shall:
3.4.1 Have the ability to view incident locations as a GIS layer.
3.4.2 Have the ability to click on incident location in the GIS layer and view incident specific data.
3.4.3 Provide an online mapping tool that integrates both static and near real‐time data, such as Environmental Sensitivity Index (ESI) maps, ship locations, weather, ocean a currents, and other Government provided or publicly available data layers in centralized, easy‐to‐use format.
3.4.4 Provide an online mapping tool enables a user to quickly and securely upload, draw, manipulate, export, and display spatial data in a GIS map with minimal training cialist required. Online mapping tool use does not require the expertise of a GIS spe to develop and display a basic incident specific situation map layer.
3.4.5 Have the ability to export/print GIS layer information.
3.4.6 Have the ability to include GIS layers of information from existing Government sites and/or files.
3.5 Public information and social media support for execution of the mission capabilities shall:
t‐
3.5.4 ith USCG public affairs branding standards.
3.5.1 Have the ability to for specified users to distribute photos, video, audio clips and other multi‐media materials.
ex3.5.2 Allow specified users to disseminate messages instantly: SMS Text Messages, T to‐voice phone messages, Email, Fax, Social Media Sites, Websites (one or many, public or private news releases, photos, video, and audio clips to the website at all times).
3.5.3 Have the ability for specified users, commensurate with administrator granted access levels, to collaborate on content including news release, photos, video clips, and audio clips in an area inaccessible by the public. This capability must also provide complete version control and recall.
Comply w http://www.dhs.gov/xlibrary/assets/foia/mgmt_directive_4900_individual_use_and_operation_of_dhs_information_systems_computers.pdf
HSCG23-14-R-MPE209
3.6 afS ety system management to support execution of the mission capabilities shall:
nd 3.6.1 Digitally support development of the Site Safety and Health Plan (ICS 208‐CG) a Incident Health and Safety Plan (HASP) per 29 CFR 1910.120.
3.6.2 Have the ability to map data from the ICS‐208‐CG over to the ICS‐204‐CG forms.
3.6.3 Have the ability to push alerts to specified user groups.
3.6.4 Have the ability to indicate location of mishap within the GIS map.
3.6.5 Provide secure reporting of mishap information.
3.7 Operational execution of mission capabilities shall:
3.7.1 Have the ability to send and receive images, text, and completed ICS forms between ed away from the Incident mobile devices of operations personnel who are deploy
Command Post and operations section personnel in the Incident Command Post.
3.7.2 Have the ability to receive and upload a geo‐tagged photo directly to the GIS map using the photo’s metadata from operations personnel using mobile devices.
3.8 laP nning for execution of mission capabilities shall:
3.8.1 Have ICS forms and workflow process that:
3.8.1.1 Have the ability to virtually create, modify, save, archive, output and print documents to produce an IAP using the USCG ICS forms and planning processes outlined in the CG‐IMH 2014 edition.
3.8.1.2 Include all USCG ICS forms listed in the CG‐IMH and available at https://homeport.uscg.mil/ics.
3.8.1.3 Convert new forms created by the USCG HQ Program Manager to utilize in system.
3.8.1.4 Have the ability to edit forms based on incident specific needs.
3.8.1.5 Have the ability to automatically map data from the primary entry form to secondary forms based on operational period and shifts if multiple shifts of al period.
t, at a minimum, map to CG personnel are on duty during a single operation
3.8.1.5.1 CG ICS Form 211 (Check‐in List) data mus
ICS Forms 203 (Org Assignment List), 204 (Assignment List), 205a to tically map the ICS forms.
eriods.
(Comms List), and 207 (Org Chart);
3.8.1.5.2 CG ICS Form 202 (Incident Objectives) data must map to CG ICS Form
234 (Work Analysis Matrix);
S 3.8.1.5.3 CG ICS Form 234 (Work Analysis Matrix) data must map to the CG IC
Form 215 (Operational Planning Worksheet); and rksheet) data must map 3.8.1.5.4 CG ICS Form 215 (Operational Planning Wo the CG ICS Form 204 (Assignment List).
3.8.1.6 Have the ability to define the operational period and automa ctions of the USCG ent operational p operational period into the appropriate se
3.8.1.7 Have the ability to transfer data to subsequ
| 1 GENERAL |
| 1.1 SCOPE |
| 1.2 PLACE OF PERFORMANCE |
| 1.3 PERIOD OF PERFORMANCE |
| 1.4 CONTRACTOR PERSONNEL |
| The POC shall be responsible for all Contractor work performed under this contract and resulting delivery orders. The POC shall coordinate a kick-off meeting with the USCG within 10 working days of the contract award date. |
| The POC shall be the Contractor’s primary representative. The name of the POC, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the POC, shall be provided to the USCG. The POC shall respond to a request for discussion or resolution of technical problems within 24 hours of notification. |
| 1.4.2 Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of military uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure its employees present a professional appearance while working at Government facilities. |
| 1.5 BACKGROUND |
| 1.5.1 The USCG lacks an enterprise wide information technology suite of capabilities to support information and incident management, which includes: |
| 1.5.1.1 ICS form creation and storage. |
| 1.5.1.2 IAP creation and storage. |
| 1.5.1.3 Tactical Command & Control Capabilities. |
| 1.5.1.4 Data archiving and Freedom of Information Act (FOIA) request management. |
| 1.5.2 The USCG has identified countless lessons learned, after action reports, and memos documenting the need for improved Information Management during an incident, including reports developed as a result of the Deepwater Horizon (DWH) incident in 2010, http://www.uscg.mil/foia/FOIA_Library.asp. |
| 1.5.3 The USCG has identified this enterprise wide software solution for Incident Management and IAP development as a corrective solution to resolve the DWH Lesson Learned 3.1.3.1 – Develop Authoritative, Shared Information Systems, 3.1.3.2 – Formalize Information and Communication Requirements, and 3.1.3.4 – Improve Command, Control, Communications, Computers, and Information Technology (C4IT) Capability. |
| 1.5.4 Some USCG operational units have purchased single unit licenses for Incident Management and IAP Software systems. This contract will provide an enterprise-wide standard USCG system. |
| 2 GENERAL REQUIREMENTS |
| 2.1 Provide a ready to use, software solution to support all functional areas of USCG Incident Management, IAP development, and incident preparedness activities. |
| 2.2 In coordination with the Program Manager (Commandant (CG-761)) and Sponsor (Commandant (CG-CPE)), the Contractor shall: |
| 2.2.1 Develop a configuration and implementation plan defining user roles/responsibilities and data interfaces/access. |
| 2.2.2 Develop a training plan that provides an outline or overview describing the schedule, the instructors, the user guide, core skills to be learned, key learning objectives, and how feedback will be solicited. |
| 2.3 The Contractor shall deliver the items in section 2.2 no later than 2 months after award of initial task order. |
| 2.4 The Government will reimburse the Contractor for travel expenses in support of SOW 2.2 only. |
| 2.5 Conduct initial on-site training and configuration at each unit: within 12 months of license purchase in year one of the contract and within 3 months of license purchase during the remainder of the contract. The number of users in each training course will be 10 - 20. |
| 2.6 Have no unique obstacles introduced by this product that would prohibit the Government from providing product training. |
| 2.7 Provide follow on training at USCG units upon request. This training shall be identical to initial on-site training. |
| 2.8 USCG Incident Management Activities to be supported by the software include: |
| 2.8.1 Command and Control of the mission. |
| 2.8.2 Interagency coordination support for execution of the mission. |
| 2.8.3 Public information and social media support for execution of the mission. |
| 2.8.4 Safety system management to support execution of the mission. |
| 2.8.5 Operational execution of the mission. |
| 2.8.6 Planning for execution of the mission. |
| 2.8.7 Logistical support for execution of the mission. |
| 2.8.8 Financial documentation and support for execution of the mission. |
| 2.8.9 Resource management of the mission. |
| 2.8.10 Situational awareness and dissemination process to: |
| 2.8.10.1 Support execution of the mission. |
| 2.8.10.2 Provide information and communications flow to agency leadership, maritime stakeholders, and the public. |
| 2.8.10.3 Develop and disseminate open source Geographic Information System (GIS) data layers that can be imported into other GIS viewers via a centralized data set updated in near real time (near real time is defined as I timeframe of <=60 seconds). |
| 2.8.11 Simulation and exercise support. |
| 2.8.12 Preplanning and development of Contingency Plans, draft IAPs, and geographic response data to support a more efficient initial incident response and development of the initial IAP. |
2.9 The Government owns all data entered into the database. Not more than twice per contract year, USCG may require that the Contractor provide files that contain all products, designs, drawings and outputs that USCG developed using the software. The files shall comply with section 3.2.5 and 3.9.1 standard data set formats. In accordance standard industry practice and within 30 days of request, the Contractor shall deliver the files to USCG and provide assistance that enables the Government to access, migrate, and convert to database into useable formats.
| 3 MINIMUM SYSTEM REQUIREMENTS |
| 3.1 The system shall: |
| 3.1.1 Include individual site licenses for 300 USCG-approved users authorized per site. |
| 3.1.2 Permit site licenses to be transferrable between USCG units. |
| 3.1.3 Have the ability to track, manage, and input a minimum of 100 concurrent active incidents across the USCG enterprise. |
| 3.1.4 Provide a summary view of all active incidents as an interactive GIS layer. |
| 3.1.5 Allow for summary view for additional details summary and include a link to detailed incident information when individual incident icon is clicked within the GIS layer. |
| 3.1.6 Allow for summary view for user to toggle on and off individual incident map layers from active incidents within the GIS layer. |
| 3.1.7 Include a digital library of USCG approved plans and form examples or templates for import and use during an incident. Plans and forms are available at: https://homeport.uscg.mil/ics. |
| 3.1.8 Provide full access to a 24/7 user support/help line. |
| 3.1.9 Include a comprehensive integrated self service help tool (online system job aids, tutorials, and support tools). |
| 3.1.10 Include a comprehensive user and administrator guide. |
| 3.1.11 Have a user interface (UI) that is intuitive in design and requires minimal training (less than or equal to 3 days) after which the user can operate with minor assistance from user support/help line. |
| 3.1.12 Have no unique obstacles introduced by this product that would prohibit the Government from providing product training. |
| 3.1.13 Meet or be upgraded prior to USCG use to meet the information exchange and data standards set forth in Department of Homeland Security (DHS) Management Policy MD103-01. |
| 3.1.14 Allow the Government to access, retain, and reuse all data and outputs generated through the use of the system. |
| 3.2 Hardware and Software capabilities shall: |
| 3.2.1 Allow access to the software using Microsoft Internet Explorer version 9 and higher via a portal |
| 3.2.2 Be hosted on a secure non-USCG system (e.g. cloud-based infrastructure) |
| 3.2.3 Comply with DHS 4300A DHS Sensitive System Policy and the DHS 4300A Sensitive Systems Handbook, to store sensitive but unclassified information, including but not limited to Law Enforcement Sensitive Information, For Official Use Only (FOUO), and Personally Identifiable Information (PII). https://www.dhs.gov/xlibrary/assets/foia/mgmt_directive_4300a_policy_v8.pdf |
| 3.2.4 Comply with Federal Government accessibility requirements (Section 508): |
| 3.2.4.1 All EIT deliverables within this work statement shall comply with the applicable technical and functional performance criteria of Section 508 unless exempt. |
| Specifically, the following applicable EIT accessibility standards have been identified: |
| 3.2.4.2 Section 508 Applicable Exceptions |
| 3.2.5 Utilize a common data set stored in a secure system that conforms to the DHS National Information Exchange Model (NEIM) https://www.niem.gov/Pages/default.aspx. If system does not currently meet this requirement provide upgrade plan with bid. |
| 3.2.6 Be compliant with DHS Enterprise Architecture Compliance Terms and Conditions: |
| 3.2.7 Have the ability to access data across all network server regions. |
| 3.2.8 Have the ability to use system both inside and outside of the USCG data network (CGOne) environments. |
| 3.2.9 Have the ability to run web-based application without the need for additional plug-ins for Window Internet Explorer, v9. |
| 3.2.10 Have the ability to import .pdf incident action plans, display basic incident information on the GIS, and manually enter basic incident information for any incident being run using other commercial Incident Management Systems for situations where the USCG is relying on other Unified Command members for Incident Action Planning services. |
| 3.2.11 Have capability for a minimum of 2,800 concurrent users for routine operations and a maximum of 5,600 concurrent users for surge operations. Surge operations shall not cause system degradation that negatively impacts user processing time. |
| 3.2.12 Have controls to restrict access to sensitive security information (SSI). |
| 3.2.13 Maintain a redundant real time backup system. |
| 3.2.14 Have system availability 24/7/365 with 99% up time. |
| 3.2.15 Have a disaster recovery capability to reestablish full operating capability in no less than 1 hr with 100% data integrity. |
| 3.2.16 Have the ability to integrate and update USCG provided incident response templates. |
| 3.2.17 Have the ability to track and audit user actions by date/time stamp. |
| 3.3 Users and Access Control capabilities shall: |
| 3.3.1 Maintain Department of Homeland Security (DHS)/Defense Information System Agency (DISA) approved federated account/user management system. License provides initial user registration, authentication capability by system administrators. |
| 3.3.2 Meet or be upgraded prior to USCG use to meet the user access and security requirements set forth in the DHS Management Directive 4900, Individual use and operation of DHS Information Systems/computers. http://www.dhs.gov/xlibrary/assets/foia/mgmt_directive_4900_individual_use_and_operation_of_dhs_information_systems_computers.pdf |
| 3.3.3 Be compliant with Homeland Security Presidential Directive 12 (HSPD-12). |
| 3.3.4 Maintain version control capabilities with near real time track changes and ability to roll back to previous versions. |
| 3.3.5 Have the ability to define user roles, access, responsibilities, and authorities. |
| 3.3.6 Have the ability to create user roles, access, responsibilities, and authorities based on ICS position described in the USCG Incident Management Handbook (CG-IMH) 2014 edition. https://homeport.uscg.mil/ics. |
| 3.3.7 Have the ability to assign system administrator roles and responsibilities to USCG members. |
| 3.3.8 Have a comprehensive user management feature to control access to the system, create user accounts, manage user permissions, etc. |
| 3.3.9 Have the ability to restrict user access based on role, unit, agency, or incident. |
| 3.3.10 Have the ability to limit users from viewing and/or editing incidents that they are not assigned in order to prevent personnel from editing another incident by accident. |
| 3.3.11 Push notifications to users based on required action on a form/process based on ICS position. |
| 3.4 Command and Control of the mission capabilities shall: |
| 3.4.1 Have the ability to view incident locations as a GIS layer. |
| 3.4.2 Have the ability to click on incident location in the GIS layer and view incident specific data. |
| 3.4.3 Provide an online mapping tool that integrates both static and near real-time data, such as Environmental Sensitivity Index (ESI) maps, ship locations, weather, ocean currents, and other Government provided or publicly available data layers in a centralized, easy-to-use format. |
| 3.4.4 Provide an online mapping tool enables a user to quickly and securely upload, draw, manipulate, export, and display spatial data in a GIS map with minimal training required. Online mapping tool use does not require the expertise of a GIS specialist to develop and display a basic incident specific situation map layer. |
| 3.4.5 Have the ability to export/print GIS layer information. |
| 3.4.6 Have the ability to include GIS layers of information from existing Government sites and/or files. |
| 3.5 Public information and social media support for execution of the mission capabilities shall: |
| 3.5.1 Have the ability to for specified users to distribute photos, video, audio clips and other multi-media materials. |
| 3.5.2 Allow specified users to disseminate messages instantly: SMS Text Messages, Text-to-voice phone messages, Email, Fax, Social Media Sites, Websites (one or many, public or private news releases, photos, video, and audio clips to the website at all times). |
| 3.5.3 Have the ability for specified users, commensurate with administrator granted access levels, to collaborate on content including news release, photos, video clips, and audio clips in an area inaccessible by the public. This capability must also provide complete version control and recall. |
| 3.5.4 Comply with USCG public affairs branding standards. |
| 3.6 Safety system management to support execution of the mission capabilities shall: |
| 3.6.1 Digitally support development of the Site Safety and Health Plan (ICS 208-CG) and Incident Health and Safety Plan (HASP) per 29 CFR 1910.120. |
| 3.6.2 Have the ability to map data from the ICS-208-CG over to the ICS-204-CG forms. |
| 3.6.3 Have the ability to push alerts to specified user groups. |
| 3.6.4 Have the ability to indicate location of mishap within the GIS map. |
| 3.6.5 Provide secure reporting of mishap information. |
| 3.7 Operational execution of mission capabilities shall: |
| 3.7.1 Have the ability to send and receive images, text, and completed ICS forms between mobile devices of operations personnel who are deployed away from the Incident Command Post and operations section personnel in the Incident Command Post. |
| 3.7.2 Have the ability to receive and upload a geo-tagged photo directly to the GIS map using the photo’s metadata from operations personnel using mobile devices. |
| 3.8 Planning for execution of mission capabilities shall: |
| 3.8.1 Have ICS forms and workflow process that: |
| 3.8.1.1 Have the ability to virtually create, modify, save, archive, output and print documents to produce an IAP using the USCG ICS forms and planning processes outlined in the CG-IMH 2014 edition. |
| 3.8.1.2 Include all USCG ICS forms listed in the CG-IMH and available at https://homeport.uscg.mil/ics. |
| 3.8.1.3 Convert new forms created by the USCG HQ Program Manager to utilize in system. |
| 3.8.1.4 Have the ability to edit forms based on incident specific needs. |
| 3.8.1.5 Have the ability to automatically map data from the primary entry form to secondary forms based on operational period and shifts if multiple shifts of personnel are on duty during a single operational period. |
| 3.8.1.5.1 CG ICS Form 211 (Check-in List) data must, at a minimum, map to CG ICS Forms 203 (Org Assignment List), 204 (Assignment List), 205a (Comms List), and 207 (Org Chart); |
| 3.8.1.5.2 CG ICS Form 202 (Incident Objectives) data must map to CG ICS Form 234 (Work Analysis Matrix); |
| 3.8.1.5.3 CG ICS Form 234 (Work Analysis Matrix) data must map to the CG ICS Form 215 (Operational Planning Worksheet); and |
| 3.8.1.5.4 CG ICS Form 215 (Operational Planning Worksheet) data must map to the CG ICS Form 204 (Assignment List). |
| 3.8.1.6 Have the ability to define the operational period and automatically map the operational period into the appropriate sections of the USCG ICS forms. |
| 3.8.1.7 Have the ability to transfer data to subsequent operational periods. |
| 3.8.1.8 Have the ability to package several forms to create an IAP that can be digitally signed within the system as a locked set of documents ready for dissemination. |
| 3.8.1.9 Have the ability to export or print forms in the same standardized format/layout as the current CG ICS forms. |
| 3.8.1.10 Have the ability to accept images (electronic charts, jpeg, bmp, etc) as part of the IAP. |
| 3.8.1.11 Have the ability to create an image from the GIS system and import that image into the IAP forms. |
| 3.8.1.12 Have the ability to auto populate an organizational chart, ICS-207-CG based on the ICS-203-CG information. |
| 3.8.1.13 Have forms within the system that are both user friendly for data input and in a standard template format that will print without needing to modify page setup parameters and in a format that is recognized by common computer systems. |
| 3.8.1.14 Have the ability to print the IAP as a single document, save as .pdf, and export the IAP to other formats to improve interagency functionality. |
| 3.8.1.15 Have the IAP approvals tied to ownership of form and order of preparation as described in the CG-IMH. |
| 3.8.2 Provide a digital ICS-233 “open action tracking” process that includes automatic documenting and tracking and closing of open actions, assigned POCs for each action and due dates/times. |
| 3.8.3 Have the ability to develop a demobilization plan. See examples at https://homeport.uscg.mil/ics. |
| 3.8.4 Have the ability to develop draft unit-specific CG ICS forms data and preset geographic response data for future use. |
| 3.9 Situational awareness and dissemination capabilities shall: |
| 3.9.1 Create, modify, save, and export open source geospatial Schemas or data layers, as defined by the Open Geospatial Consortium, http://www.opengeospatial.org/standards, which can be imported into other GIS viewers via a centralized data set updated in real time. An example of other Government GIS viewers include, but are not limited to, the National Oceanic and Atmospheric Administration (NOAA) Environmental Response Management Application (ERMA, http://response.restoration.noaa.gov/maps-and-spatial-data/environmental-response-management-application-erma), the USCG One View (CG1V), and the Homeland Security Information Network (HSIN). |
| 3.9.2 Have the ability to create, modify, save, and export an incident map using the GIS system. |
| 3.9.3 Have the ability to create consolidated situational information and communications about an incident or multiple incidents for agency leadership, maritime stakeholders, and the public. |
| 3.9.4 Have the ability to import data from common GIS information exchange as defined by the federal geographic data committee. (For example, import information from NOAA’s suite of oil, hazmat, wind/water modeling applications) |
| 3.9.5 Have the ability to create situation report and export the report in various formats (.pdf, word, zip, etc.). |
| 3.9.6 Have the ability to transmit situation reports via email or upload to centralized data repository for higher level users to view and download. |
| 3.9.7 Have the ability to import digital contingency plans and their associated GIS layers. |
| 3.9.8 Allow for the user to specify and save default views and visible layer sets by user, unit, and incident. |
| 3.10 Logistical support for execution of the mission capabilities shall: |
| 3.10.1 Have the ability to document and track the ordering, check-in, assignment, and demobilization of a resource. |
| 3.10.2 Have the ability to document and track the ordering, arrival, use, and disposition of supplies and other logistical support items. |
| 3.10.3 Have the ability to produce a logistical summary report on those items being documented and tracked by logistics. |
| 3.11 Resource Management of the Mission capabilities shall: |
| 3.11.1 Include personnel resource management (check-in, check-out, reassignment, demobilization, etc.) as defined by National Incident Management System (NIMS) and described in the CG-IMH and Resource and Demobilization Unit Leader Job Aid found at https://homeport.uscg.mil/ics under job aids. |
| 3.11.2 Digitize and automate the ICS-213RR work flow management processes related to requests, approval, ordering, and receipt of resources. (See USCG Resource R on pages 113 through 115 of the Resource Unit Leader Job Aid found at https://homeport.uscg.mil/ics under job aids.) |
| 3.11.3 Provide the data management of resource status (available, assigned, out of service). |
| 3.11.4 Have the ability to auto calculate ICS-209-CG information based on resource management data. |
| 3.12 Financial documentation and support for execution of the mission. The system shall: |
| 3.12.1 Have the ability to assign hourly or daily rates to a resource being managed within the system. |
| 3.12.2 Have the ability to document hours worked by a resource. |
| 3.12.3 Maintain work flow management of financial processes related to procurement requests, ordering, and receipt of resources. |
| 3.12.4 Maintain a financial accounting and calculation process to develop and report incident response costs. |
| 3.13 The system shall have the ability to operate in a simulation/training/exercise mode. |
| 3.14 The price of each software license shall include all features and functions in section 3. |
| 4 GOVERNMENT FURNISHED RESOURCES |
| 5 CONTRACTOR FURNISHED RESOURCES |
| 6 REFERENCES |
| 6.1 USCG Homeport Incident Command System documents including the USCG Incident Management Handbook, USCG ICS Forms, USCG Position Job Aids: https://Homeport.uscg.mil/ics |
| 6.2 CG 5136 excel document: |
| 6.3 Response Resource Inventory System (RRI) data: |
| 6.4 DHS Management Directive 4900: |
| 6.5 FEMA Credentialing Guidance: |
| 6.6 FIPS 201: |
| 6.7 DHS Sensitive Systems Policy Directive 4300A: |
| 6.8 DHS National Information Exchange Model (NEIM): |
File details come from the government source that posted it. Updated .