Sources Sought Notice HR001126RE008 Attachment 1 - DRAFT Statement of Objectives_Amendment 1_FINAL.pdf

PDF 734 KB Posted

Attached to
DARPA Modernization Project Sources Sought and Industry Day Notice AMENDMENT 1
Solicitation number
HR001126E008
Issued by

About this file

Statement of Objectives for DARPA Modernization Project

This Statement of Objectives (SOO) outlines the requirements for modernizing three critical spaces within the Defense Advanced Research Projects Agency (DARPA) headquarters facility in Arlington, Virginia. The project aims to create museum-quality exhibit displays that showcase DARPA's 70-year history, culture, and technological accomplishments to educate and inspire employees, contractors, and visitors. The contract performance period is from September 27, 2026 through February 28, 2028, with project completion required by December 15, 2027.

The scope encompasses design, final design documentation, permit-ready construction drawings, and limited final installation for three primary spaces: the Main Building Lobby (featuring key technologies and cultural elements with an optional digital screen wall upgrade), the Conference Center Reception Area (historical context with museum-quality display cases and timeline), and the Director's Office Feature Wall (overarching agency messaging). The contractor must provide concept development services, deliver three design options per area with renderings and narrative descriptions for leadership approval, produce permit-ready construction documents, support the permitting process, and manage installation with a DARPA-provided Content Manager. Services include all necessary technical infrastructure such as electrical connections, power cords, internet/data connections, ceiling anchor points for hanging elements, lighting, display cases, and furniture. Key personnel requirements include a Project Manager, Subject Matter Expert, and Senior Exhibit/Graphic Designer. The designs must be flexible and updatable as agency priorities evolve, with instruction guides for future modifications. Proposed structural changes are allowable if accepted by DARPA leadership and coordinated through the appropriate building management office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .