OpFires_Ph3_PD_QA.docx
DOCX document 26 KB Posted
- Solicitation number
- HR001119S0019
About this file
This document contains the questions and answers from a proposers day held by the Defense Advanced Research Projects Agency for its Operational Fires Integrated Weapon System solicitation. Proposals must address the entire weapon system, though DARPA may award parts of various proposals. While rail transport is not a priority, air cushion systems and single rail cars will likely not be considered. Little site preparation is envisioned for launches. Telemetry-only modifications would be the focus for operations systems rather than overall system development. Full system fault tolerance and mass simulators are required. Unclassified slides from the proposers day will be made available minus industry performer presentations.
OpFires_Ph3_PD_QA
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HR001119S0019-Amendment-02.pdf | ||
| HR001119S0019-Amendment-01.pdf | ||
| OpFires_CompanyList_PD_Ph3.pdf | ||
| HR001119S0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unclassified
OpFires Proposers Day
Below are Question and Answers that resulted from the OpFires Proposers Day held on June 4th at the CENTRA Technology Conference Center.
Q&A:
1. Would DARPA consider a Launcher only contract?
a. Proposals must address the whole system but DARPA can award parts of various proposals
2. Was there a study used as a basis to determine the max weight or footprint?
a. Yes, NATC CG study is pending release. Existing launcher study is able to be released.
3. Would DARPA consider air cushion system for rail transport?
a. Yes, however rail transport is not a priority consideration for transport.
4. Would DARPA consider single loaded OpFires rail car?
a. Likely not
5. Will the PD charts be part of the BAA annex?
a. It will not be part of the annex but is included with it for distribution
6. How much preparation for the launch site is envisioned?
a. Little to none
7. Will TBG be GFE?
a. That is our intent
8. 2 AUR and 1 OPS are part of the proposal, do we write to the OPS or OS?
a. The focus should be on the prototype system development plan. The focus should be on the booster with the OPS only having modifications to subcomponents such as telemetry.
9. What is the production quantity aligned w/ quoted price?
a. Listed in BAA
10. FTS Considerations
a. FTS must be part of both or the total system to include mass simulator with booster.
11. Will the unclassified slides from Proposer’s Day be made available?
a. Yes, minus the Phase 1 and 2 industry performer presentations. Please refer to BAA HR001119S0019 for instructions on obtaining copies of the slides.