HQ0516-18-R-0018_Mod_0001.pdf
PDF 71 KB Posted
- Attached to
- Provide professional Architectural and Engineering (A&E) services (Title I Design, Title II Services)
- Solicitation number
- HQ0516-18-R-0018
- Issued by
-
Defense Media Activity
About this file
Amendment to solicitation to respond to questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Detemination_MD.txt | TXT text file | |
| Wage_determination_CA.txt | TXT text file | |
| Attachment_1_-_Letter_of_Commitment_sample_template.pdf | ||
| HQ0516-18-R-0018.pdf | ||
| Attachment_2_-_Past_Performance_Questionnaire_(PPQ).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to questions and answ ers.
To update paragraph four of Section L to reflect correct NAICS code 541310 Architectural Services.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ051618R0018
X 9B. DATED (SEE ITEM 11)
05-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jun-2018
CODE
HQ0516 DEFENSE MEDIA ACTIVITY HQ
6700 TAYLOR AVENUE
FORT MEADE MD 20755
HQ0516 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ051618R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RESPONSE TO QUESTIONS
1. For the referenced solicitation, it is stated that it will be primarily for mechanical and electrical services. As such, shouldn’t the appropriate NAICS code be 541330 for Engineering Services, instead of (or in addition to) 541310, Architectural Services?
The correct NAICS for the requirement is 541310. Yes, most of the issues to be addressed will fall into electrical and mechanical (NAICS Code 541330); however, they are not the only services required. The requirements of the overall contract more align with Architectural services. This work would require support from various engineering discipline (ie electrical, mechanical, civil, environmental, fire protection, etc); however, overall project management would be under the lead of an architect.
2. Since this solicitation is being addressed using the SF 330 bidders will not be required to submit pricing information. Is that correct?
Yes, that is correct. No pricing information is required at this time.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed and submitted with its Proposal or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its Proposal or offer. Also, the full text of a solicitation provision may be accessed electronically at either of these addresses:
http://farsite.hill.af.mil http://farsite.hill.af.mil/
Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A
STANDARD FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED
HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO
DOWNLOAD.
This procurement will result in one IDIQ contract for multi-discipline A-E services, primarily for mechanical and electrical services. Work under the contract is anticipated to occur primarily at Defense Media Activity (DMA) HQ Facilities and Defense Information School (DINFOS) located at Fort George G. Meade and DMA Broadcast Center located at Riverside, CA (March ARB).
These services will be procured in accordance with 40 USC Chapter 11, Selection of Architects and Engineers, as implemented by FAR Subpart 36.6. The IDIQ contract will be for a base period of one year and four one-year option periods (if exercised). The total fee for the contract term shall not exceed $5,000,000. The guaranteed minimum for the contract term (including option years) is $5,000 and will be satisfied by simultaneous award of the initial task order with the basic contract. Firm-fixed price task orders will be negotiated for this contract. Estimated start date is August 2018.
This proposed contract is being solicited on a Service Disabled Veteran Owned Small Business basis. The North American Industry Classification System (NAICS) Code is 541310, Architectural Services, and the Small Business size standard is $7,500,000. The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria.
Comprehensive A-E services are required for the new construction, renovation, repair, replacement, demolition, alteration, and/or improvement of various types of facilities/systems. Types of facilities/systems may include, but are not limited to: office buildings; academic and training facilities (operational, maintenance and classroom);
administration buildings; operations facilities; storage facilities; transmitter and transmitter support facilities;
antenna and satellite facilities and support facilities/structures; and supporting facilities/systems such as utilities, water treatment plants, parking structures, parking lots, roadways, mechanical systems, steam or hot water distribution systems, electrical distribution systems, boilers, ground source heat pumps, closed loop geo-thermal well systems, building automation systems, foundations for tanks, and HVAC systems. Projects may also include selective demolition and site preparation. This IDIQ is primarily for A-E services, projects may also include multiple or single disciplines, including but not limited to architectural, civil, structural, interior, exterior, landscaping, civil, electrical, mechanical, plumbing, environmental, communications and fire protection as well as other professional services such as comprehensive planning, programming, estimating, studies, surveying, testing, mapping reproduction, electronic document posting, geo-technical, investigations, and construction management/administration and other ancillary services/products related to DMA requirements within the scope of this contract as detailed in the individual task orders.
Architect-Engineering Services that may be required under this contract include: (1) Preparation of performance work statements/statement of work, plans, specifications, and cost estimates; and (2) Asbestos and lead assessments may be required to determine the presence of asbestos or lead. When asbestos or lead is found, comprehensive asbestos or lead surveys, to include sampling and testing, and the preparation of plans and specifications showing the location of asbestos and lead, and specifying the procedure to be followed during construction and/or demolition for removal or abatement, will be required. Work on and around confined spaces may be required on this contract.
A-E firms must be able to accept work that involves asbestos, lead paint, PCBs, other hazardous materials, and confined spaces.
A-E firms are required to prepare cost estimates, specifications, design-build RFPs, and drawings as required and outlined on specific task orders. Selected firm will be required to provide documents in PDF format. As defined by paragraph 1-5 of UFC 3-600-01, Fire Protection Engineering for Facilities, some task orders under this contract will require the services of a licensed fire protection engineer or sub-consultant.
All engineering and design services shall comply with the most current edition of UFC 1-300-09N Design Procedures and other requirements as indicated on the Whole Building Design Guide Web Site
(www.wbdg.org). Selected A-E firm is required to have online access to web-based support programs and email via the internet for routine exchange of correspondence/information. A-E firm is required to submit and maintain an A- E Accident Prevention Plan (APP) in accordance with USACE EM 385-1-1 for each project on this contract and Activity Hazard Analysis (AHA) for each in-field action. Key personnel, including sub-consultants, must be U.S.
citizens and able to obtain security clearances as required.
All contractors are advised that registration in System for Award Management (SAM) Database is required prior to award of a contract. Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Web site: https://www.sam.gov.
In accordance with the FAR 36.601-4(b) the A-E firm must be a registered/licensed architectural and/or engineering firm to be eligible for award. Provide proof that firm is permitted by law to practice the professions of architecture or engineering, (e.g.., state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms, etc.). Failure to submit the required proof could result in a firm’s elimination from consideration.
FIRMS WHO ARE OFFERING AS A JOINT VENTURE SHOULD INCLUDE WITH THEIR
SUBMISSION A COPY OF THE JOINT VENTURE AGREEMENT. A COMPLETED COPY OF THE “LETTER OF COMMITMENT” AS SHOWN IN ATTACHMENT 1 IS REQUIRED. FAILURE TO INCLUDE THE JOINT
VENTURE AGREEMENT WILL RESULT IN THE FIRM’S ELIMINATION FROM FURTHER EVALUATION.
The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest. The prime firm for this contract will be required to perform throughout the contract term.
Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to clarify information contained in the SF330 submittal. Elaborate presentations are not desired.
SUBMISSION REQUIREMENTS: Architect-Engineer firms desiring to be considered for this contract must submit a completed SF-330 package. The SF-330 shall be typed, one sided, at least 11 point Times New Roman or larger. Part I shall not exceed 100 single-sided 8.5 by 11 inch pages (the page limit does not include ISRs, certificates, PPQs, or licenses nor does the page limit include cover sheets or dividers, provided that these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm). Part I pages shall be numbered sequentially. The organizational chart may be one page single sided 11 by 17 foldout, using 11 point font or larger (font limitations do not apply to graphics, captions or tables). Introductions shall be included in Sections E and F of the SF 330. Please include your DUNS, CAGE, and TIN numbers in Block 30 of the SF-330. Interested firms shall submit four (4) hard copies of the SF-330 and two (2) CDs to Defense Media Activity HQ, 6700 Taylor Avenue, Fort George G. Meade, MD 20755, and Attn: Kiesha Campbell, Contracting Officer. Responses are due no later than June 29, 2018 by 1400 hours. Late responses will be handled in accordance with FAR 52.215-1. The point of contact is Kiesha Campbell, Contracting Officer, at 301-222-6029. If an SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered. As required above, provide verifiable evidence that your firm is permitted by law to practice the professions of architecture or engineering (e.g., state registration number).
Hand-carrying of proposals is not allowed. Government personnel will not pick up proposals at the gate. It is the contractor’s responsibility to ensure delivery to the location specified by United States Postal Service or other commercial couriers.
Electronic (E-mail, facsimile, etc.) submissions are not authorized.
Questions must be submitted in writing via e-mail to kiesha.v.campbell.civ@mail.mil no later than June 18, 2018 by 1400 hours.
Inquiries concerning this procurement should include solicitation number and title and be forwarded via email to kiesha.v.campbell.civ@mail.mil.
Proposal Organization https://www.sam.gov/ mailto:kiesha.v.campbell.civ@mail.mil
DOCUMENT TITLE ELEC.
COPIES
PAGE LIMIT
Complete SF 330 Architect- Engineering Qualifications (All Sections)
1 100
SF 330 Part 1, Section E Resumes Of Key Personnel Proposed For This Contract
1 1 Each Key Person
SELECTION CRITERIA: Firms responding to this synopsis will be evaluated to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria.
Failure to comply with instructions, or provide complete information may affect the firm’s evaluation or disqualify the firm from further consideration. Evaluation Criteria (1) through (4) are considered most important and equal among themselves; Criteria (5) and (6) are slightly less important and equal among themselves; and Criteria (7) is considered a tiebreaker. SF 330s will be evaluated to determine the most highly qualified firm based on criterion responses. Specific selection criteria include:
1. Specialized Experience
2. Professional Qualifications and Technical Competence
3. Past Performance
4. Geographic Location
5. Program Management and Capacity
6. Quality Control
7. Volume of Work
Criterion 1 - Experience (SF-330 Part 1 Section F):
Firms will be evaluated on specialized experience and technical competence in performance of services similar to those anticipated under this contract through evaluation of experience in:
1. Experience with design of repair projects involving HVAC, mechanical, plumbing, electrical and lighting systems, and room configurations to meet UFC admin space requirements.
2. Experience with design projects involving fire alarm and suppression systems.
3. Experience with design projects involving HVAC, plumbing, and electrical replacement.
4. Experience with design projects involving new construction, renovations, alterations, and additions involving all A & E disciplines.
5. Experience in applying sustainability concepts through an integral design approach and designing in accordance with recognized sustainability rating systems such as U.S. Green Building Council, Leadership in Energy and Environmental Design (LEED) Green Building Rating System.
Submission requirements: Provide a maximum of ten (10) projects completed within the past five (5) years.
Completed means that the design or design project package were completed within the past five (5) years immediately preceding the date of issuance of this notice and best illustrate specialized experience of the proposed team in the areas outlined above. Sufficient information to determine the date of completion of the project must be included in the project description or the project will not be considered. If more than the maximum number of projects is submitted, the Government will only evaluate projects up to the maximum number authorized in the order submitted.
All projects provided in the SF330 must be completed by the actual office/branch/regional office/individual team member proposed to manage and perform work under this contract. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF330 Part 1, Section F, block 25, “Firm Name”. Include a contract number or project identification number in block 21. Include an email address and phone number for the point of contact in block 23(c). In block 24, include in the project description the contract period of performance, award contract value, current contract value, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above.
For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration.
NOTE: If the firm is a joint venture, projects performed by the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects must be submitted for each joint venture partner not to exceed a total of ten (10) projects. Firms failing to provide projects from all joint venture partners will be considered to have not met the requirements of the criterion.
Projects shall be submitted on the SF-330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not submit an IDIQ contract as an example project. Instead, list relevant task orders or stand-alone contract awards that fit within the definition above.
The Government will not evaluate information provided for an IDIQ contract. Examples of project work submitted that do not conform to this requirement will not be evaluated.
All information for Criterion 1 should be submitted in the SF330, Part I, Section F. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluation of Criterion 1.
Criterion 2 - Professional Qualifications and Technical Competence (SF-330 Part 1 Section E and Section G):
Firms will be evaluated on professional qualifications, competence, and experience of the proposed key personnel in providing services to accomplish the tasks required under this contract, including participation in example projects in the SF330, Part 1, Section G. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Specific disciplines that must be included in key personnel are Architecture, Mechanical, Electrical, and Environmental.
Submission Requirements: SF330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate experience in the work proposed under this contract. Resumes are limited to one page each and should indicate:
professional registration, certification, licensure and/or accreditation in appropriate disciplines; cite recent (within the past five years) project-specific experience in work relevant to the services required under this contract; and indicate proposed role in this contract. Indicate participation of key personnel in example projects in the SF330, Part 1, Section G.
Criterion 3 - Past Performance (SF 330 Part 1 Section H):
Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. NOTE:
Past performance information for projects listed under Criterion 1 may be given greater weight.
Submission Requirements: IF A COMPLETED CPARS/ACASS EVALUATION IS NOT AVAILABLE, the Past Performance Questionnaire (PPQ), Attachment 2, included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 1, Specialized Experience. DO NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS
AVAILABLE.
IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the firm is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the
PPQ Attachment 2, which will provide contract and client information for the respective project(s).
Firms may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Defense Media Activity HQ, 6700 Taylor Avenue, Fort George G. Meade, MD 20755, Attn: Kiesha Campbell Contracting Officer, or via email at kiesha.v.campbell.civ@mail.mil, prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1 Specialized Experience. Firms may also address any adverse past performance issues. Information shall not exceed two double-sided pages (or four single-sided pages) in total.
Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.
Criterion 4 – Geographic Location (SF-330 Part 1 Section H):
Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms will be evaluated on the locations of their office or offices that will be performing the work under this contract and demonstrated knowledge of the general geographic areas in which projects could be located. Evaluation of firms will include consideration of their location within the general geographic area of the anticipated projects, Fort George G. Meade, MD and DMA Broadcast Center located at Riverside, CA (March
ARB).
Submission Requirements:
1. Indicate location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members.
2. Provide a narrative describing the team’s knowledge of the primary geographic areas to be covered by this contract.
Criterion 5 - Program Management and Capacity (SF 330 Part 1 Section H):
Firms will be evaluated on the firm’s ability to plan for and manage work under the contract, the capacity to accomplish the work in the required time.
Submission Requirements:
1. Provide an organizational chart for the team and discuss the management plan for this contract and personnel roles in the organization. Describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.
2. Describe the firm’s present workload and the availability of the project team (including consultants) for the specified contract performance period. Describe the workload/availability of the key personnel during the anticipated contract performance period and the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services. General statements of availability/capacity may be considered less favorably.
Criterion 6 - Quality Control Program (SF 330 Part 1 Section H):
Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract, and means of ensuring quality services from their consultants and subcontractors.
Submission Requirements: Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures.
1. Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F or how the plan will work if it has not been used previously.
Additionally, discuss any lessons learned that have led to the proposed plan.
2. Provide a quality control process chart showing the inter-relationship of the management and team components.
3. Describe specific quality control processes and procedures proposed for this contract including technical accuracy of and assurance of overall coordination of plans and specifications, and engineering and design services.
4. Identify the quality control manager and any other key personnel responsible for the quality control program and a description of their roles and responsibilities.
5. Describe how the firm’s quality control program extends to management of subcontractors.
Criterion 7 - Volume of DoD Work (SF 330 Part 1 Section H):
Firms will be evaluated in accordance with DOD Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 236.602-1, from data extracted from the Federal Procurement Data System (FPDS). Firms will be evaluated in terms of work previously awarded to the firm by DOD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A&E firms.
Submission Requirements: Firms do not submit data for this factor.
(End of Summary of Changes)
File details come from the government source that posted it.