HQ0516-18-R-0018.pdf

PDF 408 KB Posted

Attached to
Provide professional Architectural and Engineering (A&E) services (Title I Design, Title II Services)
Solicitation number
HQ0516-18-R-0018
Issued by

About this file

Solicitation document

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C

D

EX

X G F 43 - 47

48 - 54 X H 55 - 58 kiesha.v.campbell.civ@mail.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 58

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

HQ0516 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

KIESHA V CAMPBELL 301-222-6029

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 11

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

12 - 14 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

16 - 17 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 18 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 19 - 22 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

23 - 41

PART II - CO NTRACT CLAUSES

HQ0516 DEFENSE MEDIA ACTIVITY HQ

6700 TAYLOR AVENUE

FORT MEADE MD 20755

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

05 Jun 2018

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

HQ051618R0018

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

1 Job

A& E services Ft. Meade

FFP

Architectural/Engineering Services in accordance with Section C Statement of Work. Funding will be provided on each task order.

FOB: Destination

AX

NET AMT

A & E services DINFOS

FFP

Architectural/Engineering Services in accordance with Section C Statement of

A & E services CA

FFP

Architectural/Engineering Services in accordance with Section C Statement of

UNDEFINED Each

ODC

COST

OTHER DIRECT AND INDIRECT COSTS ASSOCIATED WITH SERVICES

AND SUPPLIES PROVIDED.

MAX COST

OPTION

FFP

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

COST

OTHER DIRECT AND INDIRECT COSTS ASSOCIATED WITH SERVICES

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

OTHER DIRECT AND INDIRECT COSTS ASSOCIATED WITH SERVICES

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

OTHER DIRECT AND INDIRECT COSTS ASSOCIATED WITH SERVICES

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

Architectural/Engineering Services in accordance with Section C Statement of

OTHER DIRECT AND INDIRECT COSTS ASSOCIATED WITH SERVICES

Section C - Descriptions and Specifications

STATEMENT OF WORK

SCOPE OF WORK: “Provide professional Architectural and Engineering (A&E) services (Title I Design, Title II Services, and other A&E services to include incidental related work associated with design for construction/repair of real property) to support DMA Worldwide Operations”. Primary DMA Facility locations are:

Ft Meade, MD Riverside, CA

C.1 PURPOSE OF THE CONTRACT

This is an indefinite delivery/indefinite quantity (IDIQ) contract for A&E Services requiring the use of various and multiple design disciplines and related technical services that include, but not limited to architectural, civil, structural, interior, exterior, landscaping, civil, electrical, mechanical, plumbing, environmental, communications and fire protection as well as other professional services such as comprehensive planning, programming, estimating, studies, surveying, testing, mapping reproduction, electronic document posting, geo-technical, investigations, and construction management/administration and other ancillary services/products related to DMA requirements within the scope of this contract as detailed in the individual task orders.

C.2 STATEMENT OF WORK

The Contractor shall furnish all of the necessary personnel, materials, services, and facilities necessary to the performance of the work as stated in each individual task order that may be issued under this contract.

See Section H.1 for task order procedures.

C.3 SCOPE OF CONTRACT

DMA shall request supplies, equipment and services under this contract by means of task orders with specifically defined scopes, deliverable products, and schedules. The Contractor shall provide all personnel, equipment, transportation, tools, materials, supervision, supplies, other items and services necessary to fully investigate and design each project using services that includes, but not limited to architectural, civil, structural, interior, exterior, landscaping, civil, electrical, mechanical, plumbing, environmental, communications and fire protection as well as other professional services such as comprehensive planning, programming, estimating, studies, surveying, testing, mapping reproduction, electronic document posting, geo-technical, investigations, and construction management/administration and other ancillary services/products related to DMA requirements within the scope of this contract as detailed in the individual task orders. Services provided by this contract shall be primarily for execution of new construction, renovation, repair, replacement, demolition, alteration, and/or improvement of various types of facilities/systems. Types of facilities/systems may include, but are not limited to: office buildings; academic and training facilities (operational, maintenance and classroom); administration buildings; operations facilities; storage facilities; transmitter and transmitter support facilities; antenna and satellite facilities and support facilities/structures; and supporting facilities/systems such as utilities, water treatment plants, parking structures, parking lots, roadways, mechanical systems, steam or hot water distribution systems, electrical distribution systems, boilers, ground source heat pumps, closed loop geo-thermal well systems, building automation systems, foundations for tanks, and HVAC systems. Projects may also include selective demolition and site preparation.

(a) General Requirements

Contractor shall provide all personnel, equipment, transportation, tools, materials, supervision, supplies, other items and services necessary to provide A&E Services and ancillary services related to DMA Projects within the scope of this contract as detailed in the individual task orders. All work shall be accomplished by or under the direct supervision of a licensed/registered architect or engineer in the particular field involved. The final documents shall be stamped and signed by an architect or engineer licensed/registered in the particular field involved. The final documents shall be stamped and signed by an architect or engineer licensed/registered in the particular field involved. The final documents shall conform to all local, city, state, and national codes, regulations and construction permit requirements as well as specific regulations, policies, and instructions further detailed in the individual task order.

(1) Services include, but are not limited to:

o Provide all services, deliverable products, and schedules as detailed in each task order.

o Handle multiple task orders simultaneously.

o Provide Title I (Design Services), Title II (Supervision and Inspection Services), and other A&E services incidental to the performance of work requirements.

o Development of program/project requirements.

o Field surveys and investigations.

o Determination of project feasibility.

o Prepare and provide concept and construction drawings.

o Prepare and provide drawings of an existing or new facility, where drawings are not available.

o Field surveys and investigations.

o Architectural, Structural, Electrical, Mechanical and Civil investigations of an existing building or site; where current information is not available; and to field verify accuracy of existing record documents.

o Prepare and provide electronic media.

o Conversion of manual drawings to electronic media.

o Prepare and provide engineering calculations.

o Provide “AS-BUILT” drawings in approved electronic media and hard copy.

o Provide construction specifications.

Provide construction cost estimates.

Provide Project Management.

Initiate and complete DD Form 1391 – FY Military Construction Project Data

Task Order

Specific details of work assignments, deliverables, documentation, applicable DMA/industry standards, etc., will be provided in individual task orders. Task order scope shall range from minor repair, renovation, or alteration to facility construction A&E services. The Contractor shall ensure adequate resources are dedicated to satisfy the requirements of task orders including, but not limited to, furnishing the necessary personnel, material, and services as required. In addition, inherent in providing these goods and services, the Contractor shall provide the supervision and management effort necessary for efficient and effective administration and control of work performed under the contract.

Quality Control Plan. For each task order the A-E shall provide and maintain a Design Quality Control Plan as an effective quality control program which will assure that all services required by this contract are performed and provided in a manner that meets professional architectural and engineering quality standards.

The DQC Plan shall be implemented by a Design Quality Control Manager who has the responsibility of being cognizant of and assuring that all documents on the project have been coordinated. This individual shall be a person who has verifiable engineering or architectural design experience and is a registered professional engineer or architect.

The Contractor shall include in the DQC plan the discipline-specific checklists and the cross discipline checklists to be used during the design and quality control of each submittal. These completed checklists shall be submitted at each design phase as part of the project documentation. The Contractor shall correct errors and deficiencies in the design documents prior to resubmitting them to the Government.

The Contractor shall include in the DQC plan design schedules identifying all major design tasks, including those that control the flow of work. The schedule shall include review and correction periods associated with each items.

Internal review periods for Design Quality Control functions shall be listed as well as external review periods.

Acceptance of the Contractor’s plan is required prior to the start of design. Acceptance is conditional and will be predicated on satisfactory performance during the design. The Government reserved the right to require the Contractor to make changes in his DQC plan and operations including removal of personnel, as necessary, to obtain the quality specified. Insure the following items are included:

1. Project number, description, and location.

2. A listing of design team members, noting responsibilities, phone numbers and e-mail addresses. NOTE: The A- E was selected based on the team members submitted no change shall be made without prior approval.

3. A CPM or bar chart schedule prepared using an off the shelf NAS software package fully compatible with the Microsoft Windows environment (i.e. Microsoft Project or similar software) indicating required design activities and proposed submission dates.

HOURS OF OPERATION

The standard hours of operation are: Monday – Friday 7:00am to 5:00 pm; Weekends & Federal Holidays Closed. Operational days and hours can be modified to the individual task order as needed. Weekend or afterhours work is not anticipated or is minimal, and is authorized by written authorization of the contracting officer, only.

OBSERVANCE OF FEDERAL HOLIDAYS

Deliverables due on a Saturday, Sunday, or the following Federal holidays shall be due on the following business day.

1. New Year’s Day 1 January

2. Martin Luther King’s Birthday 3rd Monday in January

3. President’s Day 3rd Monday in February

4. Memorial Day Last Monday in May

5. Independence Day 4 July

6. Labor Day 1st Monday in September

7. Columbus Day 2nd Monday in October

8. Veteran’s Day 11 November

9. Thanksgiving Day 4th Thursday in November

10. Christmas Day 25 December

C.4 GOVERNMENT FURNISHED PROPERTY

The Contractor shall provide all equipment necessary for performance of this contract; however, in some instances, an exception may be granted to furnish Government-owned property or to authorize purchase with contract funds. Property purchased with Government funds will become the property of the Government at the end of the contract.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 31-JUL-2018 TO

30-JUL-2019

N/A N/A

0002 POP 31-JUL-2018 TO

30-JUL-2019

0003 POP 31-JUL-2018 TO

0004 POP 31-JUL-2018 TO

1001 POP 31-JUL-2019 TO

30-JUL-2020

1002 POP 31-JUL-2019 TO

1003 POP 31-JUL-2019 TO

1004 POP 31-JUL-2019 TO

2001 POP 31-JUL-2020 TO

30-JUL-2021

2002 POP 31-JUL-2020 TO

2003 POP 31-JUL-2020 TO

2004 POP 31-JUL-2020 TO

3001 POP 31-JUL-2021 TO

30-JUL-2022

3002 POP 31-JUL-2021 TO

3003 POP 31-JUL-2021 TO

3004 POP 31-JUL-2021 TO

4001 POP 31-JUL-2022 TO

30-JUL-2023

4002 POP 31-JUL-2022 TO

4003 POP 31-JUL-2022 TO

4004 POP 31-JUL-2022 TO

CLAUSES INCORPORATED BY FULL TEXT

52.0100-4094 MARKING INSTRUCTIONS FOR ALL ITEMS TO INCLUDE DROP SHIP AND DIRECT

SHIPMENT (DMA)(FEB 2017)

The Contractor shall attach two (2) copies of a detailed packing list with each box or container with unlike items where the full description of the contents is not authorized or cannot be shown. Include one (1) copy of the packing list inside the box or container and attach one (1) copy of the packing list on the outside of the box or container. The outside of the box or container must also include the complete shipping address as provided in the schedule and the Contract/Purchase/Delivery Order number located on Page 1 of this document.

The packing list shall contain the following information:

(a) Contract number

(b) Package number and set number (if any) of the container.

(c) A list of the contents which shows the quantity by item, item description, part number, type and size, unit of issue if other than each.

(d) Each item including all components that makes up a KIT will be packaged AS A KIT and delivered complete.

(e) Containers must be arranged and identified for easy cross reference with contract line item numbers (CLIN) and durable for further reshipment.

INCOMPLETE DELIVERIES

Incomplete delivery refers to the incomplete shipment of a unit of issue of an individual contract line item (CLIN).

Such Incomplete, or fragmented delivery of any part of a CLIN is not authorized and will not be accepted.

Each item (CLIN), e.g., described as a KIT, including all components and sub-items, are to be packaged together and delivered complete. Where sub-line items are reflected as component parts of an item, all sub-line items must be delivered simultaneously to form the complete item.

Note! The government WILL NOT ACCEPT items shipped as incomplete unit of issue of an individual contract line item (CLIN). Rejected items will be returned at the contractor's expense

(End of Local Instruction)

Section G - Contract Administration Data

52.0100-4028 CONTRACT CONTACT INFORMATION (DMA)(OCT 2008)

The Defense Media Activity contact name, e-mail address and telephone # are as follows:

CONTRACTING OFFICER: Kiesha Campbell, 6700 Taylor Ave, Ft. Meade, MD 20755, kiesha.v.campbell.civ@mail.mil, 301-222-6029

FOR FOLLOW-UP INFORMATION REGARDING CHANGES OR LATE PAYMENTS, PLEASE CONTACT:

THE CONTRACT SPECIALIST SHOWN ABOVE.

(End of Local Instruction)

CONTRACTOR MANPOWER REPORTING

DoD REQUIREMENT: CONTRACTOR MANPOWER REPORTING:

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the individual service component (Air Force, Army, Navy etc.) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/.

mailto:kiesha.v.campbell.civ@mail.mil

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

H.1 TASK ORDER PROCEDURES

a. The Contractor will be provided with a Statement of Work, Schedule of Deliverables, Design Criteria and other additional instructions as needed for each individual task order to be issued under this contract. These documents collectively referred to as a Request for Task Order Proposal (RFTOP), will be issued by email.

b. 508 Compliance will be considered as a factor at the task order level when the requirement is defined and 508 considered applicable.

c. The RFTOP package will include special instructions that are particular to the requirement and information concerning the basis for award. The basis for award of any task order will be determined by the specific programmatic needs of the requesting agency.

H.2 TASK ORDER INFORMATION

a. For each Task Order, the Government and the Contractor shall follow same steps:

(1) Conduct a Joint Scope Meeting within 14 calendar days upon request by government at the site to review and discuss the work and the work schedule;

(2) Prepare a Detailed Scope of Work;

(3) Government issues a Request for Proposal;

(4) Contractor prepares a price proposal in the format requested and submits a proposed work schedule, list of Subcontractors and other documents required by the Task Order;

(5) Government reviews the proposal to ensure the right tasks and quantities were used;

(6) Government and Contractor negotiate price and schedule. If Government is in agreement with price, schedule, Subcontractors, etc. it may issue a Task Order for the project.

b. Each task order will contain the following minimum information:

(1) Date of award;

(2) Contract number and task order number;

(3) Total dollar amount of the task order;

(4) Statement of Work, Schedule of Deliverables, Design Criteria and any special instructions;

(5) Period of performance;

(6) The name and address of the Task Order COR.

c. The Contractor shall submit separate invoices for each task order within 30 days of completion and acceptance.

H.3 EXTENSIONS AFTER AWARD

It is the intent of the Government that all task orders be completed within the time frame specified in each order.

H.4 PERFORMANCE CRITERIA AND QUALITY ASSURANCE SURVEILLANCE PLANS

Some task orders issued under this contract may be issued as performance based service task orders.

Individual task orders will contain performance criteria tailored to the individual requirement.

H.5 RESTRICTIONS ON DISCLOSURE OF INFORMATION

Information made available to the contractor by the Government for the performance or administration of this effort shall be used only for those purposes and shall not be used in any other way without the written agreement of the Contracting Officer.

The contractor agrees to assume responsibility for protecting the confidentiality of Government records, which are not public information. Each contractor or employee of the contractor to whom information may be made available or disclosed shall be notified in writing by the contractor that such information may be disclosed only for a purpose and to the extent authorized herein.

The contractor shall not use, disclose, or reproduce proprietary data that bears a restrictive legend, other than as required in the performance of this effort. Nothing herein shall preclude the use of any data independently acquired by the contractor without such limitations or prohibit an agreement at no cost to the Government between the contractor and the data owner which provides for greater rights to the contractor.

The Contractor agrees not to release or disclose, verbally or in writing, information pertaining to the results or findings of work (including data collection, analyses, draft or final papers and reports) for the period of this contract without first notifying the COR in writing at least 21 days prior to the release or disclosure. At a minimum, the notification shall include: (1) who or what is generating the request for advance information;

(2) when and how project results/information would be released; and (3) what information would be released.

H.6 POST AWARD ORGANIZATIONAL CONFLICT OF INTEREST

a. General: The Contractor shall have programs in place to identify, report, and mitigate actual and potential conflicts of interest for itself, its employees, subcontractors and consultants. The existence of such programs and the disclosure of known actual or potential conflicts are material performance requirements of this contract.

b. Disclosure: The Contractor shall report all actual and potential conflicts of interest pertaining to this contract to the Contracting Officer, including those that would be caused by a contemplated modification to this contact or another contract. Such reports shall be in writing (including by email). Upon request, the Contractor shall respond to a Contracting Officer’s request for an OCI mitigation plan.

c. Resolution: In the event the Contracting Officer determines that a conflict of interest exists, based on disclosure from the Contractor or from other sources, the Contracting Officer shall take action which may include, but is not limited to, requesting a mitigation plan from the Contractor, terminating part or all of the contract, modifying the contract or obtaining a waiver in accordance with applicable law, including FAR 9.503 as applicable.

H.7 SECURITY REQUIREMENTS

Security Requirements. The work to be accomplished will be unclassified and will not subject the Contractor to any other type of security requirement. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation, shall abide by all security regulations of the installation. The Contractor shall not enter any restricted area without an issued authorized access pass for designated restricted area or escort, which shall be provided through arrangement with COR or building facility manager. The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the close of each work period, all Government facilities, equipment and materials shall be secured. The Contractor is responsible for safeguarding all government property and information provided for contractor use.

References:

a. DOD 5200.22, National Industrial Security Program Instruction, 18 March 2011.

b. DOD 5220.22-M, February 28, 2006; Incorporating Change 1, March 28, 2013, SUMMARY FOR CONFORMING CHANGE #1 TO DoDM 5220.22, “National Industrial Security Program Operating Manual”

(NISPOM).

c. DoD 5220.22-R, Industrial Security Regulation, December 1985.

d. DoD 5200.01, Information Security Program, Volumes 1-4, 24 February 2012, Incorporating March 2013 Changes.

Investigation Requirements. The Contractor shall supply a visitors’ access request (VAR) on official letterhead a minimum of 10 calendar days of required access. The VAR shall list the following:

-Contractor’s name -Contract number -Contract start and end dates -Contract point of contact along with e-mail and phone number -Government COR -Full legal name of each technician -Each technician’s social security number, date of birth, phone number -Each technician’s place of birth

The Contractor shall supply a copy of a valid drivers’ license and social security card for each individual requiring access.

These investigations will be crucial in deciding base access. The Contractor and contract personnel are required to maintain an acceptable record throughout the contract’s Period of Performance. All contract personnel could be subject to additional background checks and vehicle searches at any time. The Contractor and contract personnel are required to inform COR of any change in record which could affect installation access. Upon investigation completion, if found clear of negative history, the contract personnel will be issued a Contractors’ Badge which will allow base access. If badge is lost or stolen, the Contractor is responsible to notify COR immediately, no later than 3 calendar days after loss. The Contractor is also required to inform COR of any personnel turnover and/or replacement which would require contractor’s badge turn in and/or another VAR within 3 days.

Security Contacts. DMA following Security Personnel can be contacted for security related questions or issues:

DMA Security Chief Phone:

DMA Security Officer Phone:

DMA-HQ

ATTN: Security Directorate 6700 Taylor Ave.

Fort Meade, MD 20755 Information Security and other miscellaneous requirements.

Contractor personnel must comply with local security requirements for entry and exit control for personnel and property at the government facility.

Contractor employees will be required to comply with all Government security regulations and requirements. Initial and periodic security training and briefings will be provided by Government security personnel. Failure to comply with security requirements can cause for removal and the contractor will not be able to provide service on this contract at no fault of the government.

The Contractor shall not divulge any information about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

DMA retains the right to request removal of contractor personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

OCT 2010

52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009

JUN 2010

52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-12 Unique Entity Identifier Maintenance OCT 2016 52.204-13 System for Award Management Maintenance OCT 2016 52.204-15 Service Contract Reporting Requirements for Indefinite-

Delivery Contracts

OCT 2016

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.217-5 Evaluation Of Options JUL 1990 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business

Set-Aside

NOV 2011

52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation

MAY 2014

52.222-41 Service Contract Labor Standards MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor

Standards - Price Adjustment (Multiple Year And Option Contracts)

MAY 2014

52.222-46 Evaluation Of Compensation For Professional Employees FEB 1993 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts APR 2010 52.232-18 Availability Of Funds APR 1984 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-14 Suspension of Work APR 1984 52.243-1 Changes--Fixed Price AUG 1987 52.244-4 Subcontractors and Outside Associates and Consultants

(Architect-Engineer Services)

AUG 1998

52.244-6 Subcontracts for Commercial Items JAN 2017 52.247-34 F.O.B. Destination NOV 1991 52.249-7 Termination (Fixed-Price Architect-Engineer) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7023 Drawings and Other Data to become Property of Government MAR 1979 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7007 Liability and Insurance DEC 1991 252.247-7012 Ordering Limitation DEC 1991

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of Contracting Officer and shall not be binding until so approved.

(End of clause)

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (JUN 2016)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

X (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (Oct 2015) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

X (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

X (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (43) 52.223-20, Aerosols (June, 2016) (E.O. 13693).

____ (44) 52.223-21, Foams (June, 2016) (E.O. 13693).

X (45) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(46) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (47) 52.225-5, Trade Agreements (FEB 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (48) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (49) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (50) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (51) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (52) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (53) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (54) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C.

3332).

____ (55) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

____ (56) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (57) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (58)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

X (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

X (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

X(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

_____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.