AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. Updates to PWS include:
(a) Edits to w ording in Section 1.0 Introduction and Section 2.0 Project Scope regarding the title Forest
Management Plan
(b) Edits to w ording in Section 8.0 Security
2. Removing reference to NDA attachment
3. Clauses added: FAR 52.222-41 and FAR 52.222-42
4. Changing the submission due date to 12:00 p.m., Tuesday, September 22, 2015
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ0034-15-T-0245
X 9B. DATED (SEE ITEM 11)
04-Sep-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Sep-2015
CODE
WHS - ACQUISITION DIRECTORATE
1155 DEFENSE PENTAGON
WASHINGTON DC 20301-1155
HQ0034 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ0034-15-T-0245
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by reference:
52.222-41 Service Contract Labor Standards MAY 2014
The following have been added by full text:
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29
CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
Employee Class Monetary
08130 - Forestry Equipment Operator 17.64
08160 - Forestry/Logging Heavy Equipment Operator 20.17
08190 - Forestry Technician 20.17
08250 - General Forestry Laborer 13.16
08280 - Nursery Specialist 17.73
08310 - Slash Piler/Burner 12.42
08340 - Tree Climber 13.90
08370 - Tree Planter 10.14
08400 - Tree Planter, Mechanical 10.14
Wage-Fringe Benefits $4.27 per hour or $170.80 per week or $740.13 per month
(End of clause)
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Sep-2015 10:00 AM to 22-Sep-
2015 12:00 PM.
The following have been modified:
EVALUATION CRITERIA
B. EVALUATION FACTORS FOR AWARD
The Government intends to award a firm fixed price, lowest price technically acceptable contract to the responsible
Offeror whose offer conforms to the solicitation and based on the results of the evaluation described below.
TECHNICALLY ACCEPTABLE FACTORS
Factor I: Technical/Management Approach
This section shall be comprised of Offeror’s approach to meeting the overall requirements set forth within the
Performance Work Statement (PWS) and demonstrate the Offeror’s understanding of the requirement:
Explain your technical approach that will be used to its greatest advantage to best benefit the Government.
Define the roles, responsibilities, and qualifications of key personnel. Provide proof of training and certifications. Show experience working on Federal Installations and provide submission of federally required documentation. Provide proof of tree removal from areas with steep slopes and utility lines.
Possess a DoD Secret Industrial Security Facility Clearance; all employees working on this contract must be a
U.S. citizen and have Secret or interim clearance. Complete DoD Operational Security training and Anti-terrorism Level 1 Training before or at commencement of contract.
Provide a safety plan, and identify the most significant risks anticipated for this project and provide a description of how you propose to mitigate those risks. Also include a mitigation plan that explains management of subcontractors and how issues with subcontractors will be handled. Provide an Accident
Prevention Plan and Activity Hazard Analysis.
Provide an outline and narrative of the quality control plan you will use. Explain the process for ensuring the quality of all definable features of work. Provide an Integrated Pest Management plan.
Factor II: Pricing - Offeror’s price quote shall include a breakdown of all prices, separating the prices for Task 1
Herbicide Application and Task 2 Hazard Tree Mitigation. The price quote shall be rounded to the nearest whole number.
C. EVALUATION RATING
Factor I: The Government will evaluate the Offeror’s approach and understanding of the requirement and the degree to which the Offeror’s organizational structure and resources are capable of managing, controlling, and administering herbicide application and hazard tree mitigation.
This factor will be assigned an ACCEPTABLE or UNACCEPTABLE rating.
Technical Acceptable/Unacceptable Ratings
Determination Definition
Acceptable ALL of the minimum acceptable criteria are clearly met by the quote. The Offeror’s quote meets the performance and technical capability requirements defined in the
PWS.
NOTE: Once the quotes have been determined to be “technically acceptable,” Award will be based on price only.
Unacceptable NOT all of the minimum acceptable criteria are met by the quote. An unacceptable quote contains one or more deficiencies. Quote fails to meet specified minimum performance and technical capability requirements defined in the PWS.
Factor II: Price will be evaluated to determine the reasonableness of the Offeror’s quote. Reasonableness may be based on one or more of the price analysis techniques in FAR 13 including but not limited to comparison to the
Independent Government Estimate (IGE) and/or comparison to other quotes. Normally, price reasonableness is established through adequate price competition.
D. AWARD
The Government will consider an offer to be eligible for award when the Offeror, no later than the quote due date, unconditionally accepts the terms and conditions of the RFQ and submits all required information specified in the
RFQ by the closing date/time for receipt of quotes. Offeror failing to satisfy these requirements will be rejected and not considered for award.
A quote deemed unacceptable under any quote factor or subfactor will be considered unacceptable overall and will not be considered for award.
The Government intends to make an award without discussions; however, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest, and waive informalities and minor irregularities in offers received.
LIST OF ATTACHMENTS
RFI Questions Database
Solid Waste Recycling Report
QASP
DD-254
Formal Site Visit Requirement
VASS
PERFORMANCE WORK STATEMENT
Performance Work Statement
Raven Rock Mountain Complex
Herbicide Application and Hazard Tree Mitigation
1.0 Introduction
To implement the defined objectives of the RRMC Forest Management Plan, it is necessary to apply herbicide to Forest Management Units 2&3 and cut the hazardous trees identified in the 2014 RRMC
Hazard Tree Assessment. This will include the requirement for trained/certified personnel, equipment, tools, supervision and any other items required to apply herbicide and harvest trees.
RRMC has implemented an Environmental, Safety and Health Management System and all contracted personnel are required to meet the directives defined within the Management System. Applicable maps and regulations are included within Appendix A: Environmental Requirements which will be provided at the site visit on Tuesday, September 15, 9:00 a.m.
2.0 Project Scope
The Contractor shall furnish labor, equipment, materials, and supervision as required to perform all work in accordance with the Implementation Schedule and Performance Work Statement as forming part thereof for this work at Raven Rock Mountain Complex (RRMC), Adams County, PA.
Task 1: Apply herbicide to all invasive and competing plants within RRMC Forest Management Units 2
& 3. Management Unit 2 is approximately 90 acres and Management Unit 3 contains approximately 50 acres.
Task 2: Cut all trees marked in accordance with the 2014 RRMC Hazard Tree Assessment. At that time approximately 300 trees of various sizes were marked for removal along roads, walkways and parking areas.
Work shall consist of but not limited to the sustainment and implementation of the forest management goals established within the RRMC Forest Management Plan.
3.0 Services
Task 1: Herbicide shall be applied in accordance with RRMC-88: Integrated Pest Management (IPM)
Program Regulation. Pest Control Personnel must show proof of training in all appropriate categories, and achieve and maintain pest management certification as required. Contractor shall create a IPM Plan for
MU 2 & 3. The plan shall minimally include identification of invasive and competing plants, appropriate
IPM techniques and strategies to control pests, pesticide use and management plans, and regulatory document submission and management. Pest management plans must be reviewed and approved by ESH and the IPM Coordinator prior to implementation.
Before initiation of work, the Contractor shall develop and submit to the COR for acceptance a comprehensive site specific Safety Plan that includes Accident Prevention Plan (APP) and Activity
Hazard Analysis (AHA) in PDF or Word format, in accordance with EM-385-1-1, US Army Corps of
Engineer Safety and Health Requirements Manual.
To maintain pesticide certification, applicators must accumulate updated training at three-year intervals for which recertification credits have been approved. Regardless of the category of certification, each applicator must accumulate six core credits. The number of category-specific credits required for recertification varies from category to category. Specific requirements are listed below.
Category Certification Credits
Private Applicator Category * 6
01 Agronomic Crops 10
02 Fruit and Nuts 10
03 Vegetable Crops 10
04 Agricultural Animals 6
05 Forest Pest Control 8
06 Ornamental and Shade Trees 10
07 Lawn and Turf 10
08 Seed Treatment 4
09 Aquatic Pest Control 4
10 Right-of-Way and Weeds 8
11 Household/Health Related 10
12 Wood Destroying Pests 10
13 Structural Fumigation 6
15 Public Health - Vertebrate Pest 8
16 Public Health - Invertebrate Pest 8
17 Regulatory Pest Control 10
18 Demonstration and Research 10
19 Wood Preservation 4
20 Commodity and Space Fumigation 6
21 Soil Fumigation 4
22 Interior Plantscape 6
23 Parks/School Pest Control 10
24 Swimming Pools 4
25 Aerial Applicator 10
26 Sewer Root Control 4
* For private applicators with fumigation certification, two of the required six category credits must be specific to fumigation.
The DOD adopts and offers certification in the EPA pest control categories as noted in Table E.1 to meet the specific requirements for DOD pesticide use.
Table E.1. Pest Control Categories
PEST CONTROL CATEGORY
EPA AND
DOD CATEGORY
Forest Pest Control 2
Ornamental and Turf Pest Control 3
Aquatic Pest Control 5
Right-of-Way Pest Control 6
Industrial, Institutional, Structural, and
Health-Related Pest Control
Public Health Pest Control 8
Aerial Application Pest Control 11*
* DOD category only.
The Contractor must show experience working on Federal Installation and submission of federally required documentation. Quotes to use pesticides will be submitted to the IPM Coordinator. Quotes must include pesticide names, active ingredients and percentages, EPA registration numbers, label signal words, target pests, and intended sites. Product labels and Safety Data Sheets (SDS), formerly Material
Safety Data Sheets (MSDS) should accompany requests. A Pesticide Use Proposal form (PUP) may be provided to facilitate requests or may be found at the Armed Forces Pest Management Board website.
Quotes will be reviewed and approved/disapproved by ESH. No pesticides will be applied without prior approval by ESH.
Pesticide applicators will complete daily use reports, Pest Management Report, DD-1532 or equivalent.
This form may be found at AFPMB website, or available on request from the IPM Coordinator.
Completed Pest Management Reports will be submitted to the IPM Coordinator monthly, or within one week of the end of a project.
Task 2: Trees identified in the 2014 RRMC Hazard Tree shall be cut and felled in place; except when the tree is impacting roadways, building use, or stormwater movement. In those cases the tree shall be moved to a remote forested area or mulched in place. Mulched material can be spread within forested areas and away from structures. Two hundred ninety trees require removal as a result of the Hazard Tree
Assessment. Of these 290, 147 are dead and 143 are living. Over 75% of the removals are located in difficult terrain, over fences, roads, or trails, where special considerations should be made in mitigating these hazards.
Before initiation of work, the Contractor shall develop and submit to the COR for acceptance a comprehensive site specific Safety Plan that included Accident Prevention Plan (APP) and Activity
Hazard Analysis (AHA) in PDF or Word format, in accordance with EM-385-1-1, US Army Corps of
Engineer Safety and Health Requirements Manual including.
Proof of Training/Certification:
Contractor must provide proof of training or certification in any or all of the following arboriculture disciplines.
International Society of Arboriculture Certifications and Examination Information
The International Society of Arboriculture (ISA) certification exam content varies by designation
(www.isa-arbor.com). Options for designations include the following:
ISA Certified Arborist
ISA Certified Utility Specialist
ISA Certified Municipal Specialist
ISA Certified Climber Specialist
ISA Certified Aerial Lift Specialist
ISA Board Certified Master Arborist
For example, the certified arborist exam might include topics such as tree biology, urban forestry, pruning, diagnosis and soil management. Exam content for the utility specialist exam may include topics such as electric utility pruning, storm response, electrical knowledge, customer relations and integrated vegetation management.
Experience must be demonstrated in both urban and forest environments. The Contractor shall provide proof of tree removal from areas with steep slopes and utility lines.
PERIOD OF PERFORMANCE: October 1, 2015- September 30, 2016
4.0 Contractor Visit Requests & Badges
Entry to RRMC is limited to those who are directly involved in the work to be performed on a contract.
Visit requests must be received at least 72 hours prior to the visit that takes place 9:00 a.m., Tuesday, September 15, 2015, and must include the full name, SSN, date and place of birth, affirmation of citizenship, level of clearance/investigation and date granted (if required) of the visitor. The visit request must reference the contract number, and contain the visit purpose, along with the government point of contact information.
5.0. Denial of Entry
The U.S. Government reserves the right to terminate the entry of any vendor employee upon disclosure of information which indicates the individual’s continued entry to the installation is not in the best interest of national security. The violation of or deviation from the established security procedures by Contractor employees may also result in denial of entry.
6.0. Delays
The U.S. Government is not responsible for delays caused by non-compliance with these instructions.
The vendor is similarly responsible for any delays caused by employees who report to work without their badge to include any delays encountered by an employee in gaining entrance to an area with a visitors badge or in the reissuing of a lost or damaged badge.
7.0. Subcontracts
The vendor will not award any RRMC subcontracts without written approval from the Contracting
Officer. Security requirements contained herein will apply to any subcontractor.
8.0 Security: The Raven Rock Mountain Complex (RRMC) is designated as a Restricted Area. A Secret
Industrial Facility Clearance is mandatory for the contracting company. Contractor employees or subcontractors who require escorted entry to meet contractual requirements must have a valid need for access, be a U.S. citizen, and have no derogatory information in their background that would question their trustworthiness or reliability. Contractor employees or subcontractors who do not have a Secret or
Interim Secret Industrial Personnel Security Clearance will require an escort who holds a Secret clearance and an RRMC badge. Escorts shall be provided by the contractor.
A DD Form 254 (Department of Defense Contract Security Classification Specification) from the facility
Security Office will be required for this contract. The Contractor shall be responsible for complying with installation access as requirements for all Contractor personnel authorized to work at the facility. The
Contractor shall ensure that any government furnished identification shall be returned to the Government when the employee no longer works for the Contractor at the installation. Keys issued to the Contractor must be returned immediately upon completion of work.
The government reserves the right to deny access to any Contractor employee who is determined to be a security risk.
8.1 Contractor Entry: Entry to and continued presence in the facility is limited to those who are directly involved in the work to be performed on a contract Contractors will provide the facility Security Office via email through the Contracting Officer Representative (COR), on the VASS form, a list of all employees performing /working on the contract. The list will include full name, Social Security Number
(SSN), date and place of birth, type and date of investigation, and level of clearance granted (if applicable) of each employee. The list will be kept current at all times. Contractors also must notify the facility Security Office immediately if the Contractor terminates any employee previously on the above list or if the employee otherwise no longer works for Contractor.
8.2 Control of Restricted Area Passes/Badges: Permanent badges will be valid for the actual contract period of the award, not to exceed one year. Any extension of contract time will require the issuance of a new badge. The Contractor is responsible for all badges issued to their employees. The Contractor will ensure that employees, whose services are no longer required in the contract performance at the facility, turn in their badges to the facility Security Office prior to effective pay settlement. The Contractor will immediately notify the COR telephonically or through electronic mail and in writing when services of a
Contractor’s employee are terminated at the facility.
8.3 Lost Badges: Lost and damaged identification badges will be immediately reported to the COR and to the Security Office. At the time the Contractor submits invoice for final payment order, he shall also obtain and submit written certification from issuing official for identification media (credentials, passes and badges) that all have been turned in or accounted for. Failure to comply with the requirement set forth herein will result in withholding final payment pending return or accounting for all identification media issued under this contract.
8.4 Denial of Entry: The U.S. Government reserves the right to terminate the entry or remove any
Contractor employee upon disclosure of information which indicates the individual’s continued entry to or presence in the installation is not in the best interests of national security. The violation of or deviation from the established security procedures by Contractor employees may also result in denial of entry.
8.5 Delays: The U.S. Government is not responsible for delays caused by required security reviews or non-compliance with these instructions. The Contractor is similarly responsible for any delays caused by employees who report to work without their identification badge to include any delays encountered by an employee in gaining entrance to an area with a visitors badge or in the reissuing of a lost or damaged badge.
8.6 Restricted items: Contract employees shall comply with the facility Security Policy restricting the following personally owned items that will not be introduced past the Security Building:
1. Any personally owned device, no matter size, capable of capturing pictures or video recordings to include camera phones, camera watches, and or cameras installed in other small devices
2. Personally owned computers, i.e. workstations, laptops, personal digital assistants, and digital music players.
3. Any personally owned equipment capable of voice recording
4. Any personal electronic device capable of two-way transmitting
Personnel may store restricted personal electronic devices in personal vehicles or lockers located in the
Security Building and pedestrian adit; however, the use of any personal video or photography equipment on the facility property is strictly prohibited.
8.7 Prohibited items: Contract employees shall comply with the facility security policy prohibiting weapons, including but not limited to, firearms, pellet guns, bows, arrows, explosives, martial arts weapons, all forms or derivatives of pepper spray (Oleoresin Capsicum), and knives with blades in excess of three inches. Narcotic drugs, syringes, and drug paraphernalia, except prescribed medication, or medicine included as medical supplies. Alcoholic beverages (except for sealed containers stored in personal vehicles).
8.8 Operations Security ( OPSEC): Contract employees shall comply with the facility Policy on
OPSEC and attend training as required. Information about the facility contracts and/or details about the facility will not be discussed with unauthorized persons, discarded as unclassified trash, posted on a webpage, or released to the public without approval from the Facility Security Office. Information should only be released to authorized personnel on a “need to know” basis. Additionally, Contractors will not discuss information about the facility to reporters, radio stations, or any person without an official “need to know”!
8.9 Subcontracts: The prime Contractor will not award any subcontracts without written approval from the Contracting Officer. Security requirements contained herein will apply to any subContractor.
8.10 Security Education: The Contractor shall ensure contract employees understand the the facility
Security Requirements and are given security briefings annually as required by the Facility Security
Office.
8.11 Additional Security Requirements: All Contractors performing work on this contract must have completed DoD Operational Security training within the previous 12 months and anuually. Training is available online at: http://cdsetrain.dtic.mil/opsec/index.htm.
All Contractors performing work on this contract must have completed DoD Antiterrorism Level 1 training within the previous 12 months. Training is available online at: https://atlevel1.dtic.mil/at/.
CORs are responsible to ensure that all contract personnel have completed this training.
If awarded Contractor has not fulfilled security training requirements by time of award, they will be provided this opportunity upon first arrival on-site.
9.0. Conduct of Vendors
All vendors must follow all RRMC security policies and procedures.
SUBMISSION REQUIREMENTS
A. SUBMISSION REQUIREMENTS
To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
A complete quote shall consist of the following and be divided and labeled to be easily identified:
ELECTRONIC VERSIONS ONLY:
VOLUME FACTOR PAGE LIMITATION
VOLUME I Technical 20 pages
VOLUME II Price No page limitation
Pricing information shall be addressed ONLY in VOLUME II, Price quote.
The Offeror must ensure that electronic submissions are readable, in the format specified in this solicitation.
Page Size and Format: A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches. Pages shall be single-spaced with 1-inch margins on all sides. Except for the reproduced sections of the solicitation document, all text shall be formatted to Times New Roman and no smaller than 12-point font. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Pages shall be numbered sequentially by volume.
http://cdsetrain.dtic.mil/opsec/index.htm https://atlevel1.dtic.mil/at/
Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 8.5 x 11 inches in size. For tables, charts, graphs and figures, the text shall be no smaller than 10 point.
Electronic Submissions ONLY.
All questions should be submitted in writing as a Request for Information (RFI) on the attached Questions and Answers Database sheet to marge.a.niedzwicz.civ@mail.mil. All questions will be answered in writing. Questions are due no later than 12:00 p.m., September 16, 2015.
The Offeror shall submit one (1) electronic copy of the entire quote by 12:00 p.m., Tuesday, September
22, 2015, to the following email addresses:
marge.a.niedzwicz.civ@mail.mil monica.r.ceaser.civ@mail.mil
Quotes shall be submitted in a format readable by Microsoft (MS) Word 2003®, MS Excel 2003®, MS-
Project 2003®, and MS-Power Point 2003®, or Microsoft Office XP®, as applicable.
(End of Summary of Changes) mailto:marge.a.niedzwicz.civ@mail.mil mailto:marge.a.niedzwicz.civ@mail.mil mailto:monica.r.ceaser.civ@mail.mil