Sample Program Report.pdf

PDF 79 KB Posted

Attached to
Hybrid Single Stream Refuse and Recycling Management
Solicitation number
HQ0034-12-R-3087
Issued by

About this file

J-C4 Waste Mgt Sample Program Report

View the file

Other files

File Type Posted
J-2 Ash Analysis.pdf PDF
J-C1 PWS Revision dtd 02 August 2012.docx DOCX document
HQ0034-12-R-3087 Amendment 0004.pdf PDF
RFIs- Pentagon Refuse and Recycling_Final dtd 20120802.docx DOCX document
RFIs- Pentagon Refuse and Recycling_Final dtd 20120731_JK.pdf PDF
HQ0034-12-R-3087 Amendment 0003.pdf PDF
HQ0034-12-R-3087 Amendment 0002.pdf PDF
J-C1 PWS Revision dtd 23 July 2012.docx DOCX document
HQ0034-12-R-3087 Modification 01.pdf PDF
Past Performance Questionnaiare.docx DOCX document
Past Performance Data Sheet.docx DOCX document
WD 05-2104.pdf PDF
PWS.docx DOCX document
Recycling Pulls.pdf PDF
2011 Trash Pull Data.docx DOCX document
Contractor Evaluation.docx DOCX document
HQ0034-12-R-3087.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Month-XX Owner Washington Headquarters Service (WHS) Contractor Reporting Period

Solid Waste to Landfill Cardboard Sorted Office Paper Newspaper Mixed Paper High Grade Plastic Low Grade Plastic Aluminum Cans Glass Bottles Ferrous/Non Ferrous Metals Cables Electronic Equipment (other)

Fly Ash from Pentagon Fly Ash from Other Sources

Food Waste Restroom Waste (other) Construction and Demolition (C&D) Plaster Wallboard Sheetrock Carpet Raised Access Flooring Light Tubes/Ballasts Stone Dirt Concrete Asphalt Tires Misc. Oils Ceiling Tile Refrigerants Stone Dirt Concrete Asphalt Metal Totals

Non-Recyclable Waste

Material from Recovery Facility (MRF)

Fly Ash

Unit

Integrated Solid Waste Management Program Sample Report

Percent of Total Landfilled

Percent of Total Recycled Total

Recycled/ DivertedTo LandfillMaterial

Andersone Typewritten Text Attachment 7 HQ0034-12-R-3087

Month-XX Owner Washington Headquarters Service (WHS) Contractor Reporting Period

Percent of entire waste stream recycled this reporting period:

Percent of entire waste stream recycled year to date:

Gross proceeds from recyclable materials this reporting period:

Gross proceeds from recyclable materials year to date:

Total disposal fees this reporting period:

Total disposal fees year to date:

Integrated Solid Waste Management Program Sample Report

Totals for Reporting

Andersone Typewritten Text Attachment 7 HQ0034-12-R-3087

File details come from the government source that posted it. Updated .