Section J Attachments-Mitigation and Restoration Services Amendment 0001.pdf

PDF 192 KB Posted

Attached to
Mitigation and Restoration Services Federal contract opportunity
Solicitation number
HQ0034-12-R-3028
Issued by
DOD Washington Headquarters Service

About this file

Amendment 0001-Section J Attachments

View the file

Other files for this federal contract opportunity

Other files attached to Mitigation and Restoration Services, newest first.
File Type Posted
Amendment 0001.pdf PDF
ATTACHMENT J-L1 AND J-L2 only.doc DOC document
Q A Amendment 0001-HQ0034-12-R-3028.pdf PDF
Section J Attachments-Mitigation and Restoration Services.pdf PDF
HQ0034-12-R-3028 Mitigation and Restoration Services Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mitigation and Restoration Services Solicitation Number: HQ0034-12-R-3028

Section J - List of Documents, Exhibits and Other Attachments

SECTION J - LIST OF ATTACHMENTS

Attachment Titles:

J-B1 Estimated Quantity IDIQ Labor, 7 pages 13 June 2012 Equipment and Material CLIN’s; and RS Means Co- Efficient CLIN’s

J-B2 Profit and Overhead Mark-Up Rates 1 page 13 June 2012

J-C1 Examples of Scheduled Work 1 page 13 June 2012

J-C2 Examples of Out-of-Scope Work 1 page 13 June 2012

J-L1 Past Performance Questionnaire 4 pages 13 June 2012

J-L2 Past Performance Data Sheet 2 pages 13 June 2012

J-1 Servics Contract Act Wage Determination 11 pages 13 June 2011

Arlington County, VA: WD Number: 2005-2103

J-2 Davis- Bacon Act Wage Determination 7 pages 15 June 2012

Arlington County, VA: WD Number: VA120097

ATTACHMENT J-B1 Dated: 13 June 2012

Estimated Quantities for Labor, Equipment and Materials (Emergency Mitigation, Scheduled Mitigation, Specialized Restoration Only) and RS Mean Co-Efficient (Scheduled Restoration Projects Only)

Insert the applicable unit costs, hourly rate, total costs per line item for Emergency Mitigation, Scheduled Mitigation, and Specialized Restoration Line Items, based on the estimated quantities provided for each year.

This also includes a discounted rate, expressed in a dollar value or percentage that will be allowed for all scheduled mitigation orders. In addition, please insert the proposed co-efficient into evaluation 1 and evaluation 2, and total price for the R.S. Means Price Evaluation for Scheduled Restoration Services Only.

1) Evaluated Price #1 (RS Means Only): The first evaluated price will be the calculated price based on the offeror’s coefficients for a project consisting of R.S. Mean items that total $90,000 and non-pre-priced items that total $10,000. This project is a scheduled restoration project that will be performed during standard hours that does not have special security requirements. Calculation will be performed by applying the offeror’s coefficients for the base period and all option periods. The evaluated price will be the sum of prices from the base period and all option periods.

(2) Evaluated Price #2 (RS Means Only): The second evaluated price will be the calculated price based on the offeror’s coefficients for a project consisting of R.S. Mean items that total $90,000 and non-pre-priced items that total $10,000. This project is a scheduled restoration project that will be performed during non-standard hours that have special security requirements. Calculation will be performed by applying the offeror’s coefficients for the base period and all option periods. The evaluated price will be the sum of prices from the base period and all option periods.

Attachment J-B1: Base Year

Supplies Equipment

1 1 8 $ ________ $ ________

2 120 $ ________ $ ________ 3 240 $ ________ $ ________ 4 1200 $ ________ $ ________ 5 80 $ ________ $ ________ 6 120 $ ________ $ ________ 7 40 $ ________ $ ________ 8 160 $ ________ $ ________

130 x 10 days =

1300 pieces $ ________ $ ________ 10 45 x 10 days = 450 pieces $ ________ $ ________ 11 45 x 10 days = 450 pieces $ ________ $ ________

12 1 x 5 days = 5 pieces $ ________ $ ________ 13 1 x 5 days = 5 pieces $ ________ $ ________ 14 1 x 2 days = 2 pieces $ ________ $ ________ 15 5 x 5 days = 25 pieces $ ________ $ ________ 16 3 x 5 days = 15 pieces $ ________ $ ________ 17 4 x 10 days = 40 pieces $ ________ $ ________

18 4 x 10 days = 40 pieces $ ________ $ ________ 19 10 x 10 days = 100 pieces $ ________ $ ________ 20 1 x 3 days = 3 pieces $ ________ $ ________ 21 1 x 25 days = 25 pieces $ ________ $ ________ 22 10 x 10 days = 100 pieces $ ________ $ ________ 23 1 x 6 days = 6 pieces $ ________ $ ________ 24 1 x 10 days = 10 pieces $ ________ $ ________ 25 1 x 10 days = 10 pieces $ ________ $ ________ 26 1 x 10 days = 10 pieces $ ________ $ ________

27 50.00 gal $ _______ $ ________ 28 40.00 gal $ _______ $ ________ 29 50.00 gal $ _______ $ ________ 30 40.00 gal $ _______ $ ________ 31 100.00 case $ _______ $ ________ 32 150.00 case $ _______ $ ________ 33 25.00 case $ _______ $ ________ 34 25.00 case $ _______ $ ________ 35 25.00 case $ _______ $ ________ 36 40.00 box $ _______ $ ________

37 Historical Document Resoration 40 cubic feet $ _______ $ _______

Evaluation 1 Evaluation 2 Subtotal: R.S.

Means Items

$90,000.00 $90,000.00

Subtotal: Non-Pre-priced Items

$10,000.00 $10,000.00

38 Main Coefficient _________ _________ 39 Unit Book Pricing _______% _______%

Non-Pre-priced Items

(NOTE: This percentage will be the same as those percentages listed in Attachment J-

B2) _______% _______%

Total Prior to Adjustment $ _______ $ _______

Adjustment Coefficient

Non-Standard

Hours N/A

43 Special Security N/A $ _______

44 TOTAL PRICE $ _______ $ _______

Annual Planning Meeting Annual Planning Meeting

Scheduled Restoration RS Means

Materials

Duct Tape - 3" Polyethylene Sheet Goods - 4 mil Polyethylene Sheet Goods - 6 mil

Zip Wall Zipper Doors

Specialized Restoration Effort

Hygrothermograph Vacuum, Backpack Baker Scaffolding

Low Odor Non-Porous Surface Low Odor Mold Resistant Coating

Blue Painters Tape

Low Odor Disinfectant Low Odor Fungicidal Coating

Cent. Air Movers LGR Lg Dehumidifier

LGR X-Lg Dehumidifier

Carpet Cleaner Airless Sprayer

Distribution Panel

Air Scrubber

HEPA Vacuum 6 Ton DX Unit

Air Scrubber w/ Charcoal Filter

Water Extractors Vacuum Pump

Mitigation Technician

Unit

Labor

Carpet Cleaner Material Cleaning Tech

Mold Remediation Super Mold Remediation Tech

Equipment

Total ($) Est. Total

Hours

Duct Tape - Regular

Hourly Rate ($)

High Temperature Dehumidifier Dessicant Dehumidifier

Electric Heat Drying System

Mitigation Effort Project Manager

Mitigation Supervisor

Unit Cost ($) Unit Cost ($)

Mitigation and Restoration Services

Item # Description Est. Qty

Scheduled Mitigation Discount for Labor and Equipment (this should be a dollar value or percentage that the total contract price will be reduced for Scheduled Mitigation services only ): $ _______

1 1 8 $ ________ $ ________

2 120 $ ________ $ ________ 3 240 $ ________ $ ________ 4 1200 $ ________ $ ________ 5 80 $ ________ $ ________ 6 120 $ ________ $ ________ 7 40 $ ________ $ ________ 8 160 $ ________ $ ________

130 x 10 days =

1300 pieces $ ________ $ ________ 10 45 x 10 days = 450 pieces $ ________ $ ________ 11 45 x 10 days = 450 pieces $ ________ $ ________

12 1 x 5 days = 5 pieces $ ________ $ ________ 13 1 x 5 days = 5 pieces $ ________ $ ________ 14 1 x 2 days = 2 pieces $ ________ $ ________ 15 5 x 5 days = 25 pieces $ ________ $ ________ 16 3 x 5 days = 15 pieces $ ________ $ ________ 17 4 x 10 days = 40 pieces $ ________ $ ________

18 4 x 10 days = 40 pieces $ ________ $ ________ 19 10 x 10 days = 100 pieces $ ________ $ ________ 20 1 x 3 days = 3 pieces $ ________ $ ________ 21 1 x 25 days = 25 pieces $ ________ $ ________ 22 10 x 10 days = 100 pieces $ ________ $ ________ 23 1 x 6 days = 6 pieces $ ________ $ ________ 24 1 x 10 days = 10 pieces $ ________ $ ________ 25 1 x 10 days = 10 pieces $ ________ $ ________ 26 1 x 10 days = 10 pieces $ ________ $ ________

27 50.00 gal $ _______ $ ________ 28 40.00 gal $ _______ $ ________ 29 50.00 gal $ _______ $ ________ 30 40.00 gal $ _______ $ ________ 31 100.00 case $ _______ $ ________ 32 150.00 case $ _______ $ ________ 33 25.00 case $ _______ $ ________ 34 25.00 case $ _______ $ ________ 35 25.00 case $ _______ $ ________ 36 40.00 box $ _______ $ ________

37 Historical Document Resoration 40 cubic feet $ _______ $ _______

Evaluation 1 Evaluation 2 Subtotal: R.S.

Means Items

$90,000.00 $90,000.00

Subtotal: Non-Pre-priced Items

$10,000.00 $10,000.00

38 Main Coefficient _________ _________ 39 Unit Book Pricing _______% _______%

Non-Pre-priced Items

(NOTE: This percentage will be the same as those percentages listed in Attachment J-

B2) _______% _______%

Total Prior to Adjustment $ _______ $ _______

Adjustment Coefficient

Non-Standard

Hours N/A

43 Special Security N/A $ _______

44 TOTAL PRICE $ _______ $ _______

Annual Planning Meeting Annual Planning Meeting

Scheduled Restoration RS Means

Materials

Duct Tape - 3" Polyethylene Sheet Goods - 4 mil Polyethylene Sheet Goods - 6 mil

Zip Wall Zipper Doors

Specialized Restoration Effort

Hygrothermograph Vacuum, Backpack Baker Scaffolding

Low Odor Non-Porous Surface Low Odor Mold Resistant Coating

Blue Painters Tape

Low Odor Disinfectant Low Odor Fungicidal Coating

Cent. Air Movers LGR Lg Dehumidifier

LGR X-Lg Dehumidifier

Carpet Cleaner Airless Sprayer

Distribution Panel

Air Scrubber

HEPA Vacuum 6 Ton DX Unit

Air Scrubber w/ Charcoal Filter

Water Extractors Vacuum Pump

Mitigation Technician

Unit

Labor

Carpet Cleaner Material Cleaning Tech

Mold Remediation Super Mold Remediation Tech

Equipment

Total ($) Est. Total

Hours

Duct Tape - Regular

Hourly Rate ($)

High Temperature Dehumidifier Dessicant Dehumidifier

Electric Heat Drying System

Mitigation Effort Project Manager

Mitigation Supervisor

Unit Cost ($) Unit Cost ($)

Mitigation and Restoration Services

Item # Description Est. Qty

Attachment J-B1: Option Year 1

Scheduled Mitigation Discount for Labor and Equipment (this should be a dollar value or percentage that the total contract price

2 120 $ ________ $ ________ 3 240 $ ________ $ ________ 4 1200 $ ________ $ ________ 5 80 $ ________ $ ________ 6 120 $ ________ $ ________ 7 40 $ ________ $ ________ 8 160 $ ________ $ ________

130 x 10 days =

1300 pieces $ ________ $ ________ 10 45 x 10 days = 450 pieces $ ________ $ ________ 11 45 x 10 days = 450 pieces $ ________ $ ________

12 1 x 5 days = 5 pieces $ ________ $ ________ 13 1 x 5 days = 5 pieces $ ________ $ ________ 14 1 x 2 days = 2 pieces $ ________ $ ________ 15 5 x 5 days = 25 pieces $ ________ $ ________ 16 3 x 5 days = 15 pieces $ ________ $ ________ 17 4 x 10 days = 40 pieces $ ________ $ ________

18 4 x 10 days = 40 pieces $ ________ $ ________ 19 10 x 10 days = 100 pieces $ ________ $ ________ 20 1 x 3 days = 3 pieces $ ________ $ ________ 21 1 x 25 days = 25 pieces $ ________ $ ________ 22 10 x 10 days = 100 pieces $ ________ $ ________ 23 1 x 6 days = 6 pieces $ ________ $ ________ 24 1 x 10 days = 10 pieces $ ________ $ ________ 25 1 x 10 days = 10 pieces $ ________ $ ________ 26 1 x 10 days = 10 pieces $ ________ $ ________

27 50.00 gal $ _______ $ ________ 28 40.00 gal $ _______ $ ________ 29 50.00 gal $ _______ $ ________ 30 40.00 gal $ _______ $ ________ 31 100.00 case $ _______ $ ________ 32 150.00 case $ _______ $ ________ 33 25.00 case $ _______ $ ________ 34 25.00 case $ _______ $ ________ 35 25.00 case $ _______ $ ________ 36 40.00 box $ _______ $ ________

37 Historical Document Resoration 40 cubic feet $ _______ $ _______

Evaluation 1 Evaluation 2 Subtotal: R.S.

Means Items

$90,000.00 $90,000.00

Subtotal: Non-Pre-priced Items

$10,000.00 $10,000.00

38 Main Coefficient _________ _________ 39 Unit Book Pricing _______% _______%

Non-Pre-priced Items

(NOTE: This percentage will be the same as those percentages listed in Attachment J-

B2) _______% _______%

Total Prior to Adjustment $ _______ $ _______

Adjustment Coefficient

Non-Standard

Hours N/A

43 Special Security N/A $ _______

44 TOTAL PRICE $ _______ $ _______

Annual Planning Meeting Annual Planning Meeting

Scheduled Restoration RS Means

Materials

Duct Tape - 3" Polyethylene Sheet Goods - 4 mil Polyethylene Sheet Goods - 6 mil

Zip Wall Zipper Doors

Specialized Restoration Effort

Hygrothermograph Vacuum, Backpack Baker Scaffolding

Low Odor Non-Porous Surface Low Odor Mold Resistant Coating

Blue Painters Tape

Low Odor Disinfectant Low Odor Fungicidal Coating

Cent. Air Movers LGR Lg Dehumidifier

LGR X-Lg Dehumidifier

Carpet Cleaner Airless Sprayer

Distribution Panel

Air Scrubber

HEPA Vacuum 6 Ton DX Unit

Air Scrubber w/ Charcoal Filter

Water Extractors Vacuum Pump

Mitigation Technician

Unit

Labor

Carpet Cleaner Material Cleaning Tech

Mold Remediation Super Mold Remediation Tech

Equipment

Total ($) Est. Total

Hours

Duct Tape - Regular

Hourly Rate ($)

High Temperature Dehumidifier Dessicant Dehumidifier

Electric Heat Drying System

Mitigation Effort Project Manager

Mitigation Supervisor

Unit Cost ($) Unit Cost ($)

Mitigation and Restoration Services

Item # Description Est. Qty

Attachment J-B1: Option Year 2

Scheduled Mitigation Discount for Labor and Equipment (this should be a dollar value or percentage that the total contract price

2 120 $ ________ $ ________ 3 240 $ ________ $ ________ 4 1200 $ ________ $ ________ 5 80 $ ________ $ ________ 6 120 $ ________ $ ________ 7 40 $ ________ $ ________ 8 160 $ ________ $ ________

130 x 10 days =

1300 pieces $ ________ $ ________ 10 45 x 10 days = 450 pieces $ ________ $ ________ 11 45 x 10 days = 450 pieces $ ________ $ ________

12 1 x 5 days = 5 pieces $ ________ $ ________ 13 1 x 5 days = 5 pieces $ ________ $ ________ 14 1 x 2 days = 2 pieces $ ________ $ ________ 15 5 x 5 days = 25 pieces $ ________ $ ________ 16 3 x 5 days = 15 pieces $ ________ $ ________ 17 4 x 10 days = 40 pieces $ ________ $ ________

18 4 x 10 days = 40 pieces $ ________ $ ________ 19 10 x 10 days = 100 pieces $ ________ $ ________ 20 1 x 3 days = 3 pieces $ ________ $ ________ 21 1 x 25 days = 25 pieces $ ________ $ ________ 22 10 x 10 days = 100 pieces $ ________ $ ________ 23 1 x 6 days = 6 pieces $ ________ $ ________ 24 1 x 10 days = 10 pieces $ ________ $ ________ 25 1 x 10 days = 10 pieces $ ________ $ ________ 26 1 x 10 days = 10 pieces $ ________ $ ________

27 50.00 gal $ _______ $ ________ 28 40.00 gal $ _______ $ ________ 29 50.00 gal $ _______ $ ________ 30 40.00 gal $ _______ $ ________ 31 100.00 case $ _______ $ ________ 32 150.00 case $ _______ $ ________ 33 25.00 case $ _______ $ ________ 34 25.00 case $ _______ $ ________ 35 25.00 case $ _______ $ ________ 36 40.00 box $ _______ $ ________

37 Historical Document Resoration 40 cubic feet $ _______ $ _______

Evaluation 1 Evaluation 2 Subtotal: R.S.

Means Items

$90,000.00 $90,000.00

Subtotal: Non-Pre-priced Items

$10,000.00 $10,000.00

38 Main Coefficient _________ _________ 39 Unit Book Pricing _______% _______%

Non-Pre-priced Items

(NOTE: This percentage will be the same as those percentages listed in Attachment J-

B2) _______% _______%

Total Prior to Adjustment $ _______ $ _______

Adjustment Coefficient

Non-Standard

Hours N/A

43 Special Security N/A $ _______

44 TOTAL PRICE $ _______ $ _______

Annual Planning Meeting Annual Planning Meeting

Scheduled Restoration RS Means

Materials

Duct Tape - 3" Polyethylene Sheet Goods - 4 mil Polyethylene Sheet Goods - 6 mil

Zip Wall Zipper Doors

Specialized Restoration Effort

Hygrothermograph Vacuum, Backpack Baker Scaffolding

Low Odor Non-Porous Surface Low Odor Mold Resistant Coating

Blue Painters Tape

Low Odor Disinfectant Low Odor Fungicidal Coating

Cent. Air Movers LGR Lg Dehumidifier

LGR X-Lg Dehumidifier

Carpet Cleaner Airless Sprayer

Distribution Panel

Air Scrubber

HEPA Vacuum 6 Ton DX Unit

Air Scrubber w/ Charcoal Filter

Water Extractors Vacuum Pump

Mitigation Technician

Unit

Labor

Carpet Cleaner Material Cleaning Tech

Mold Remediation Super Mold Remediation Tech

Equipment

Total ($) Est. Total

Hours

Duct Tape - Regular

Hourly Rate ($)

High Temperature Dehumidifier Dessicant Dehumidifier

Electric Heat Drying System

Mitigation Effort Project Manager

Mitigation Supervisor

Unit Cost ($) Unit Cost ($)

Mitigation and Restoration Services

Item # Description Est. Qty

Attachment J-B1: Option Year 3

Scheduled Mitigation Discount for Labor and Equipment (this should be a dollar value or percentage that the total contract price

2 120 $ ________ $ ________ 3 240 $ ________ $ ________ 4 1200 $ ________ $ ________ 5 80 $ ________ $ ________ 6 120 $ ________ $ ________ 7 40 $ ________ $ ________ 8 160 $ ________ $ ________

130 x 10 days =

1300 pieces $ ________ $ ________ 10 45 x 10 days = 450 pieces $ ________ $ ________ 11 45 x 10 days = 450 pieces $ ________ $ ________

12 1 x 5 days = 5 pieces $ ________ $ ________ 13 1 x 5 days = 5 pieces $ ________ $ ________ 14 1 x 2 days = 2 pieces $ ________ $ ________ 15 5 x 5 days = 25 pieces $ ________ $ ________ 16 3 x 5 days = 15 pieces $ ________ $ ________ 17 4 x 10 days = 40 pieces $ ________ $ ________

18 4 x 10 days = 40 pieces $ ________ $ ________ 19 10 x 10 days = 100 pieces $ ________ $ ________ 20 1 x 3 days = 3 pieces $ ________ $ ________ 21 1 x 25 days = 25 pieces $ ________ $ ________ 22 10 x 10 days = 100 pieces $ ________ $ ________ 23 1 x 6 days = 6 pieces $ ________ $ ________ 24 1 x 10 days = 10 pieces $ ________ $ ________ 25 1 x 10 days = 10 pieces $ ________ $ ________ 26 1 x 10 days = 10 pieces $ ________ $ ________

27 50.00 gal $ _______ $ ________ 28 40.00 gal $ _______ $ ________ 29 50.00 gal $ _______ $ ________ 30 40.00 gal $ _______ $ ________ 31 100.00 case $ _______ $ ________ 32 150.00 case $ _______ $ ________ 33 25.00 case $ _______ $ ________ 34 25.00 case $ _______ $ ________ 35 25.00 case $ _______ $ ________ 36 40.00 box $ _______ $ ________

37 Historical Document Resoration 40 cubic feet $ _______ $ _______

Evaluation 1 Evaluation 2 Subtotal: R.S.

Means Items

$90,000.00 $90,000.00

Subtotal: Non-Pre-priced Items

$10,000.00 $10,000.00

38 Main Coefficient _________ _________ 39 Unit Book Pricing _______% _______%

Non-Pre-priced Items

(NOTE: This percentage will be the same as those percentages listed in Attachment J-

B2) _______% _______%

Total Prior to Adjustment $ _______ $ _______

Adjustment Coefficient

Non-Standard

Hours N/A

43 Special Security N/A $ _______

44 TOTAL PRICE $ _______ $ _______

Annual Planning Meeting Annual Planning Meeting

Scheduled Restoration RS Means

Materials

Duct Tape - 3" Polyethylene Sheet Goods - 4 mil Polyethylene Sheet Goods - 6 mil

Zip Wall Zipper Doors

Specialized Restoration Effort

Hygrothermograph Vacuum, Backpack Baker Scaffolding

Low Odor Non-Porous Surface Low Odor Mold Resistant Coating

Blue Painters Tape

Low Odor Disinfectant Low Odor Fungicidal Coating

Cent. Air Movers LGR Lg Dehumidifier

LGR X-Lg Dehumidifier

Carpet Cleaner Airless Sprayer

Distribution Panel

Air Scrubber

HEPA Vacuum 6 Ton DX Unit

Air Scrubber w/ Charcoal Filter

Water Extractors Vacuum Pump

Mitigation Technician

Unit

Labor

Carpet Cleaner Material Cleaning Tech

Mold Remediation Super Mold Remediation Tech

Equipment

Total ($) Est. Total

Hours

Duct Tape - Regular

Hourly Rate ($)

High Temperature Dehumidifier Dessicant Dehumidifier

Electric Heat Drying System

Mitigation Effort Project Manager

Mitigation Supervisor

Unit Cost ($) Unit Cost ($)

Mitigation and Restoration Services

Item # Description Est. Qty

Attachment J-B1: Option Year 4

Scheduled Mitigation Discount for Labor and Equipment (this should be a dollar value or percentage that the total contract price

1. Labor Rates must include all PPE and tools required to conduct the task described.

2. Emergency Mitigation Work conforms to the requirements of Section 1.4.2.1 of this PWS and includes labor and equipment requirements based on 2 hour and 48 hour requirements.

3. Scheduled Mitigation Work conforms to the requirements of Section 1.4.2.2 of this PWS and includes labor and equipment based on a pre-approved scope and proposal.

4. Equipment must include all expendable items required to function. For example carpet cleaners include soap and HEPA vacuums and air scrubbers include filters.

NOTE: Below are the minimum equipment/material sizes, as added per Amendment 0001 to this solicitation

High Temperature Dehumidifier (Minimum 160 pints per day) Portable Desiccant Dehumidifier (Minimum 70 pints per day) Electric Heat Drying System – (Minimum 50 Amp, 31,000 BTU) Water Extractors (Minimum 30 gallons/minute) Vacuum Pump (Minimum 1/3 HP) HEPA Vacuum (Minimum 1 HP, 5 Gallon) Air Scrubber (Minimum 2000 CFM) Air Scrubber w/ Charcoal Filter (Minimum 2500 CFM) Refrigerant – DX Unit – 6 Ton Carpet Cleaner (Minimum Walk-behind, 160” Column Lift) Airless Sprayer – (Minimum 2 –Gallon) Distribution Panel – (Minimum 200 Amp) Hygrothermograph - Each Vacuum, Backpack - Each Polyethylene Sheet Goods for both 4 mil and 6 mil: 12' x 100'

Baker Scaffolding (A section is typically 6' high; 26.5" wide; 6' walkboard)

ATTACHMENT J-B2 Dated: 13 June 2012

Profit and Overhead Rates**

** Total cost is calculated on base cost only (ex. overhead not calculated as % of base + Profit). Not calculated on loaded rates (ex. Labor, Equipment).

***Note: The percentages represented in this chart must correlate with the percentages listed in your bid sheets for the Base Year and each Option Year (J-B1).

Base Year Basis % over Base Cost

Profit

Overhead

Option Year 1

Option Year 2

Option Year 3

Option Year 4

ATTACHMENT J-C1 Dated: 13 June 2012

Examples of Scheduled Work Remediation and Restoration of Water Damaged/Moldy Wall Board and Insulation in Occupied Space Disassembly, Cleaning and Reassembly of Water Damaged/Moldy System Furniture Cleaning of Water Damaged/Moldy Carpet Removal/Replacement of Water Damaged/Moldy Carpet Removal/Replacement of Water Damaged/Moldy Thermal System Insulation Removal/Replacement of Water Damaged/Moldy Ceiling Tiles

ATTACHMENT J-C2

Examples of Out-of-Scope Work Dated: 13 June 2012

Examples of Out-of-Scope Work Construction of “New” Space or Buildings Renovations Unrelated to Water, Fire, or Other Catastrophe Damage Demolition/Construction in “Unsafe” Areas

ATTACHMENT J-L1 Dated: 13 June 2012

PAST PERFORMANCE QUESTIONNAIRE

SOURCE SELECTION SENSITIVE

See FAR 2.101 and 3.104

TO: FACSIMILE:

PHONE: EMAIL:_________________________

Information Request

Washington Headquarters Services is currently in the process of soliciting offers for a contract for the provision of Mitigation & Restoration Services. [CONTRACTOR NAME] provided your name and organization as a reference regarding [CONTRACT DESCRIPTION past performance under (CONTRACT NO.]. Specifically, we are looking for past performance information in the following areas:

a.) Quality of Service b.) Timeliness or Scheduling of Service c.) Business Relations/Customer Satisfaction d.) Key Personnel and Staffing (Including Subcontractors)

In order for our team to compile its evaluation, we request that you complete the attached survey form and email it, and any other pertinent information by 23 July 2012 at or before 12pm Eastern Standard Time (EST) to Samia Brandford samia.brandford@whs.mil and Kadian Ferguson kadian.ferguson@whs.mil

Washington Headquarters Services, Acquisition Directorate

Attn: Samia Brandford/Kadian Ferguson Polk Building 2521 South Clark Street Suite 3000 Arlington, VA 22202

Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings:

Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), or Unsatisfactory (U). See next page for definition of ratings.

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor: _____________________________________________________________

B. Cage Code: _______________________________________

C. Contract number: ___________________________________________________________________________

D. Contract type (e.g. Fixed price, Cost reimbursement): ______________________________________________

E. Was the referenced contractor the prime contractor on this contract? Yes____ No____

F. Type of Contract: Mitigation_____ Restoration _____

G. Was this a competitive contract? Yes _____ No _____

H. Period of performance: _______________________________________________________________________

I. Place of performance: _______________________________________________________________________ mailto:samia.brandford@whs.mil mailto:kadian.ferguson@whs.mil

J. Initial Contract price: $_______________________________________________________________________

K. Current/final contract price: $__________________________________________________________________

L. Current status of contract (choose one)

[ ] Ongoing [ ] Complete [ ] Terminated for Convenience [ ] Terminated for Default [ ] Other (explain)

M. Reason(s) for differences between initial contract price and final contract price: __________________________

N. Description of service provided:

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or agency name:

B. Customer or agency description (if applicable):

SECTION 3: REVIEWER IDENTIFICATION

A. Reviewer's name:

B. Reviewer's title:

C. Reviewer's phone/email address:

Number of months the reviewer worked on subject contract: _____________________

SECTION 4: EVALUATION

Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings: Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Neutral (N) or Unsatisfactory (U). See next page for definition of ratings.

1. Please provide an overall rating of the contractor’s past performance for the referenced contract/delivery order.

2. Please describe the quality of the work:

a. Conformance to contract requirements, appropriateness of personnel, accuracy of reports, and technical excellence.

b. Business Relations/Customer Satisfaction

3. Provide a detailed description of the Emergency Mitigation/Restoration project conducted.

4. Please describe the quality of the process used to ensure safety

5. Did the contractor complete the project within schedule? Timeliness of performance, met interim milestones, reliable, responsive to technical and contractual direction as to scheduling? If the answer is no, please explain the circumstances for delay.

6. Please describe the contractor’s ability to estimate project costs using R.S. Means, time and material/labor-hours and/or firm-fixed prices. Please note which was used.

7. If there were change orders (work that is added to or deleted from the original scope of work of a contract), please describe the contractor’s ability to successfully perform the contract requirements with the change in scope.

8. Please describe the Timeliness or Scheduling of Service/Deliveries, Emergencies, and/or Unforeseen Requests?

9. Please rate the level of effective management, prompt notification of problems, reasonable/cooperative behavior, proactive, timely award and management of subcontracts, effective small business/small disadvantaged business. Describe any problems.

10. Please describe the quality of key personnel and how well key personnel managed their portion of the contract.

11. Would you hire this contractor to provide services for your organization in the future? Please provide comments using additional pages, if desired.

12a. Did this contract require a Small Business Subcontracting Plan pursuant to FAR 52.219-9?

Yes ____, No_____.

12b. If “Yes” to 13a, have you regularly submitted to the Electronic Subcontracting Reporting System (eSRS) on time?

Yes_____. No_____.

12c. Did the contractor comply with the Small Business Subcontracting Plan?

12d. Please attach a copy of your most recently submitted eSRS report.

Reviewer’s Signature Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing Address: ATTN: SAMIA BRANDFORD/KADIAN FERGUSON

WHS/AD

2521 S CLARK STREET, SUITE 3000

Arlington, VA 22202

Or Email a scanned copy to: Samia.Brandford@whs.mil AND Kadian.Ferguson@whs.mil mailto:Samia.Brandford@whs.mil mailto:Kadian.Ferguson@whs.mil

ATTACHMENT J-L1

PAST PERFORMANCE DEFINITIONS

The following definitions are to be used when assessing past performance:

EXCEPTIONAL/VERY LOW PERFORMANCE RISK (E)

No doubt exists that the offeror will successfully perform the required effort.

VERY GOOD/LOW PERFORMANCE RISK (VG)

Little doubt exists that the offeror will successfully perform the required effort.

SATISFACTORY/MODERATE PERFORMANCE RISK (S)

Some doubt exists that the offeror will successfully perform the required effort.

MARGINAL/HIGH PERFORMANCE RISK (M)

Substantial doubt exists that the offeror will successfully perform the required effort.

UNSATISFACTORY/VERY HIGH PERFORMANCE RISK (U)

Extreme doubt exists that the offeror will successfully perform the required effort.

NEUTRAL (N)

The offeror, its subcontractors or team members and/or its key personnel have no significant performance record relevant or identifiable to the services to be performed.

Attachment J-L2 Dated: 13 June 2012

Please complete by providing information for three (3) Government or commercial contracts for services directly related or similar to the services required in Section 1.4. Information for contracts or subcontracts shall be for relevant contracts and subcontracts currently in process or completed within the past five (5) years. Specifically address the following items:

PAST PERFORMANCE DATA SHEET

1. Complete Name of Reference (Government agency, commercial firm, or other organization)

2. Complete Address of Reference

3. Contract Number or other control number

4. Date of contract

5. Date work was begun

6. Date work was completed

7. Contract type, initial contract price

8. Reference/Technical point of contact (name, title, address, telephone no. and email address)

9. Reference/Contracting point of contact (name, title, address, telephone

no. and email address)

10. Location of work (country, state or province, county, city)

11. Current status of contract (choose one):

[ ] Ongoing [ ] Complete [ ] Terminated for Convenience [ ] Terminated for Default [ ] Other (explain)

12. Provide a detailed description of the Emergency Mitigation and Restoration project conducted. Describe the contract and the relevancy to the requirements of this solicitation. Relevance shall address the following areas: Emergency Mitigation; Restoration and Specialized Restoration. Relevance can be discussed in further detail on the attached summary description as set forth in block 14 below. Please also include the following information:

(a) The tasks performed, including the deliverables, as they relate to Section 1.4 of the PWS

(b) Timeliness of deliveries

(c) The extent of involvement (as a prime versus a subcontractor)

(d) The utilization of subcontractor technical support versus in-house technical support

(e) Remote site management experience

13a. Did this contract require a Small Business Subcontracting Plan pursuant to FAR 52.219-9? Yes ____, No_____.

13b If “Yes” to 13a, have you regularly submitted to the Electronic Subcontracting Reporting System (eSRS) on time? Yes_____. No_____.

13c. Did the contractor comply with the Small Business Subcontracting Plan? Yes_____. No_____.

13d. Please attach a copy of your most recently submitted eSRS report.

14. Provide a summary description of contract work, not to exceed two pages in length. Describe the nature and scope of work, its relevancy to this contract, and a description of any problems encountered and your corrective actions. Attach the explanation to this form.

Attachment J-1 Dated: 13 June 2011

WD 05-2103 (Rev.-11) was first posted on www.wdol.gov on 06/17/2011

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005-2103 Diane C. Koplewski Division of | Revision No.: 11 Director Wage Determinations| Date Of Revision: 06/13/2011 States: District of Columbia, Maryland, Virginia

Area: District of Columbia Statewide Maryland Counties of Calvert, Charles, Frederick, Montgomery, Prince George's, St Mary's Virginia Counties of Alexandria, Arlington, Fairfax, Falls Church, Fauquier, King George, Loudoun, Prince William, Stafford **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.08 01012 - Accounting Clerk II 16.92 01013 - Accounting Clerk III 22.30 01020 - Administrative Assistant 31.41 01040 - Court Reporter 21.84 01051 - Data Entry Operator I 14.38 01052 - Data Entry Operator II 15.69 01060 - Dispatcher, Motor Vehicle 17.87 01070 - Document Preparation Clerk 14.21 01090 - Duplicating Machine Operator 14.21 01111 - General Clerk I 14.88 01112 - General Clerk II 16.24 01113 - General Clerk III 18.74 01120 - Housing Referral Assistant 25.29 01141 - Messenger Courier 13.62 01191 - Order Clerk I 15.12 01192 - Order Clerk II 16.50 01261 - Personnel Assistant (Employment) I 18.15 01262 - Personnel Assistant (Employment) II 20.32 01263 - Personnel Assistant (Employment) III 22.65 01270 - Production Control Clerk 22.03 01280 - Receptionist 14.43 01290 - Rental Clerk 16.55 01300 - Scheduler, Maintenance 18.07 01311 - Secretary I 18.07 01312 - Secretary II 20.18 01313 - Secretary III 25.29 01320 - Service Order Dispatcher 16.98

01410 - Supply Technician 28.55 01420 - Survey Worker 20.03 01531 - Travel Clerk I 13.29 01532 - Travel Clerk II 14.36 01533 - Travel Clerk III 15.49 01611 - Word Processor I 15.63 01612 - Word Processor II 17.67 01613 - Word Processor III 19.95 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 25.26 05010 - Automotive Electrician 23.51 05040 - Automotive Glass Installer 22.15 05070 - Automotive Worker 22.15 05110 - Mobile Equipment Servicer 19.04 05130 - Motor Equipment Metal Mechanic 24.78 05160 - Motor Equipment Metal Worker 22.15 05190 - Motor Vehicle Mechanic 24.78 05220 - Motor Vehicle Mechanic Helper 18.49 05250 - Motor Vehicle Upholstery Worker 21.63 05280 - Motor Vehicle Wrecker 22.15 05310 - Painter, Automotive 23.51 05340 - Radiator Repair Specialist 22.15 05370 - Tire Repairer 14.44 05400 - Transmission Repair Specialist 24.78 07000 - Food Preparation And Service Occupations 07010 - Baker 13.85 07041 - Cook I 12.55 07042 - Cook II 14.60 07070 - Dishwasher 10.11 07130 - Food Service Worker 10.66 07210 - Meat Cutter 18.08 07260 - Waiter/Waitress 9.70 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 19.86 09040 - Furniture Handler 14.06 09080 - Furniture Refinisher 20.23 09090 - Furniture Refinisher Helper 15.52 09110 - Furniture Repairer, Minor 17.94 09130 - Upholsterer 19.86 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.54 11060 - Elevator Operator 10.54 11090 - Gardener 17.52 11122 - Housekeeping Aide 11.83 11150 - Janitor 11.83 11210 - Laborer, Grounds Maintenance 13.07 11240 - Maid or Houseman 11.26 11260 - Pruner 11.58 11270 - Tractor Operator 16.04 11330 - Trail Maintenance Worker 13.07 11360 - Window Cleaner 12.85 12000 - Health Occupations 12010 - Ambulance Driver 20.41 12011 - Breath Alcohol Technician 20.27 12012 - Certified Occupational Therapist Assistant 23.11

12015 - Certified Physical Therapist Assistant 21.43 12020 - Dental Assistant 17.18 12025 - Dental Hygienist 44.75 12030 - EKG Technician 27.67 12035 - Electroneurodiagnostic Technologist 27.67 12040 - Emergency Medical Technician 20.41 12071 - Licensed Practical Nurse I 19.07 12072 - Licensed Practical Nurse II 21.35 12073 - Licensed Practical Nurse III 24.13 12100 - Medical Assistant 15.01 12130 - Medical Laboratory Technician 18.04 12160 - Medical Record Clerk 17.42 12190 - Medical Record Technician 19.50 12195 - Medical Transcriptionist 18.77 12210 - Nuclear Medicine Technologist 37.60 12221 - Nursing Assistant I 10.80 12222 - Nursing Assistant II 12.14 12223 - Nursing Assistant III 13.98 12224 - Nursing Assistant IV 15.69 12235 - Optical Dispenser 20.17 12236 - Optical Technician 15.80 12250 - Pharmacy Technician 18.12 12280 - Phlebotomist 15.69 12305 - Radiologic Technologist 31.11 12311 - Registered Nurse I 27.64 12312 - Registered Nurse II 33.44 12313 - Registered Nurse II, Specialist 33.44 12314 - Registered Nurse III 40.13 12315 - Registered Nurse III, Anesthetist 40.13 12316 - Registered Nurse IV 48.10 12317 - Scheduler (Drug and Alcohol Testing) 21.73 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 19.86 13012 - Exhibits Specialist II 24.61 13013 - Exhibits Specialist III 30.09 13041 - Illustrator I 20.48 13042 - Illustrator II 25.38 13043 - Illustrator III 31.03 13047 - Librarian 33.88 13050 - Library Aide/Clerk 14.21 13054 - Library Information Technology Systems 30.60 Administrator 13058 - Library Technician 19.89 13061 - Media Specialist I 18.73 13062 - Media Specialist II 20.95 13063 - Media Specialist III 23.36 13071 - Photographer I 16.65 13072 - Photographer II 18.90 13073 - Photographer III 23.67 13074 - Photographer IV 28.65 13075 - Photographer V 33.76 13110 - Video Teleconference Technician 20.39 14000 - Information Technology Occupations 14041 - Computer Operator I 18.92 14042 - Computer Operator II 21.18

14043 - Computer Operator III 23.60 14044 - Computer Operator IV 26.22 14045 - Computer Operator V 29.05 14071 - Computer Programmer I (see 1) 26.36 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 18.92 14160 - Personal Computer Support Technician 26.22 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 36.47 15020 - Aircrew Training Devices Instructor (Rated) 44.06 15030 - Air Crew Training Devices Instructor (Pilot) 52.81 15050 - Computer Based Training Specialist / Instructor 36.47 15060 - Educational Technologist 35.31 15070 - Flight Instructor (Pilot) 52.81 15080 - Graphic Artist 26.80 15090 - Technical Instructor 25.08 15095 - Technical Instructor/Course Developer 30.67 15110 - Test Proctor 20.20 15120 - Tutor 20.20 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 9.88 16030 - Counter Attendant 9.88 16040 - Dry Cleaner 12.94 16070 - Finisher, Flatwork, Machine 9.88 16090 - Presser, Hand 9.88 16110 - Presser, Machine, Drycleaning 9.88 16130 - Presser, Machine, Shirts 9.88 16160 - Presser, Machine, Wearing Apparel, Laundry 9.88 16190 - Sewing Machine Operator 13.78 16220 - Tailor 14.66 16250 - Washer, Machine 10.88 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 21.14 19040 - Tool And Die Maker 23.38 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 18.02 21030 - Material Coordinator 22.03 21040 - Material Expediter 22.03 21050 - Material Handling Laborer 13.83 21071 - Order Filler 15.09 21080 - Production Line Worker (Food Processing) 18.02 21110 - Shipping Packer 15.09 21130 - Shipping/Receiving Clerk 15.09 21140 - Store Worker I 11.72 21150 - Stock Clerk 16.86 21210 - Tools And Parts Attendant 18.02 21410 - Warehouse Specialist 18.02 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 27.21 23021 - Aircraft Mechanic I 25.83

23022 - Aircraft Mechanic II 27.21 23023 - Aircraft Mechanic III 28.53 23040 - Aircraft Mechanic Helper 17.54 23050 - Aircraft, Painter 24.73 23060 - Aircraft Servicer 19.76 23080 - Aircraft Worker 21.01 23110 - Appliance Mechanic 21.75 23120 - Bicycle Repairer 14.43 23125 - Cable Splicer 26.02 23130 - Carpenter, Maintenance 21.40 23140 - Carpet Layer 20.49 23160 - Electrician, Maintenance 27.98 23181 - Electronics Technician Maintenance I 24.94 23182 - Electronics Technician Maintenance II 26.47 23183 - Electronics Technician Maintenance III 27.89 23260 - Fabric Worker 19.13 23290 - Fire Alarm System Mechanic 22.91 23310 - Fire Extinguisher Repairer 17.62 23311 - Fuel Distribution System Mechanic 22.81 23312 - Fuel Distribution System Operator 19.38 23370 - General Maintenance Worker 21.43 23380 - Ground Support Equipment Mechanic 25.83 23381 - Ground Support Equipment Servicer 19.76 23382 - Ground Support Equipment Worker 21.01 23391 - Gunsmith I 17.62 23392 - Gunsmith II 20.49 23393 - Gunsmith III 22.91 23410 - Heating, Ventilation And Air-Conditioning 23.89 Mechanic 23411 - Heating, Ventilation And Air Contditioning 25.17 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 22.91 23440 - Heavy Equipment Operator 22.91 23460 - Instrument Mechanic 22.59 23465 - Laboratory/Shelter Mechanic 21.75 23470 - Laborer 14.98 23510 - Locksmith 21.90 23530 - Machinery Maintenance Mechanic 23.12 23550 - Machinist, Maintenance 22.91 23580 - Maintenance Trades Helper 18.27 23591 - Metrology Technician I 22.59 23592 - Metrology Technician II 23.80 23593 - Metrology Technician III 24.96 23640 - Millwright 28.19 23710 - Office Appliance Repairer 22.96 23760 - Painter, Maintenance 21.75 23790 - Pipefitter, Maintenance 24.63 23810 - Plumber, Maintenance 22.29 23820 - Pneudraulic Systems Mechanic 22.91 23850 - Rigger 22.91 23870 - Scale Mechanic 20.49 23890 - Sheet-Metal Worker, Maintenance 22.91 23910 - Small Engine Mechanic 20.49 23931 - Telecommunications Mechanic I 29.95 23932 - Telecommunications Mechanic II 31.55

23950 - Telephone Lineman 27.41 23960 - Welder, Combination, Maintenance 22.91 23965 - Well Driller 22.91 23970 - Woodcraft Worker 22.91 23980 - Woodworker 17.62 24000 - Personal Needs Occupations 24570 - Child Care Attendant 12.79 24580 - Child Care Center Clerk 17.77 24610 - Chore Aide 10.57 24620 - Family Readiness And Support Services 16.90 Coordinator 24630 - Homemaker 18.43 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 27.30 25040 - Sewage Plant Operator 20.84 25070 - Stationary Engineer 27.30 25190 - Ventilation Equipment Tender 19.49 25210 - Water Treatment Plant Operator 20.84 27000 - Protective Service Occupations 27004 - Alarm Monitor 20.57 27007 - Baggage Inspector 12.71 27008 - Corrections Officer 22.80 27010 - Court Security Officer 24.72 27030 - Detection Dog Handler 20.57 27040 - Detention Officer 22.80 27070 - Firefighter 24.63 27101 - Guard I 12.71 27102 - Guard II 20.57 27131 - Police Officer I 26.52 27132 - Police Officer II 29.67 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 13.59 28042 - Carnival Equipment Repairer 14.63 28043 - Carnival Equpment Worker 9.24 28210 - Gate Attendant/Gate Tender 13.01 28310 - Lifeguard 11.59 28350 - Park Attendant (Aide) 14.56 28510 - Recreation Aide/Health Facility Attendant 10.62 28515 - Recreation Specialist 18.04 28630 - Sports Official 11.59 28690 - Swimming Pool Operator 18.21 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 23.13 29020 - Hatch Tender 23.13 29030 - Line Handler 23.13 29041 - Stevedore I 21.31 29042 - Stevedore II 24.24 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 39.92 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 26.84 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 29.56 30021 - Archeological Technician I 20.19 30022 - Archeological Technician II 22.60 30023 - Archeological Technician III 27.98 30030 - Cartographic Technician 27.98

30040 - Civil Engineering Technician 26.41 30061 - Drafter/CAD Operator I 20.19 30062 - Drafter/CAD Operator II 22.60 30063 - Drafter/CAD Operator III 25.19 30064 - Drafter/CAD Operator IV 31.00 30081 - Engineering Technician I 22.92 30082 - Engineering Technician II 25.72 30083 - Engineering Technician III 28.79 30084 - Engineering Technician IV 35.64 30085 - Engineering Technician V 43.61 30086 - Engineering Technician VI 52.76 30090 - Environmental Technician 27.41 30210 - Laboratory Technician 23.38 30240 - Mathematical Technician 28.94 30361 - Paralegal/Legal Assistant I 21.36 30362 - Paralegal/Legal Assistant II 26.47 30363 - Paralegal/Legal Assistant III 32.36 30364 - Paralegal/Legal Assistant IV 39.16 30390 - Photo-Optics Technician 27.98 30461 - Technical Writer I 21.93 30462 - Technical Writer II 26.84 30463 - Technical Writer III 32.47 30491 - Unexploded Ordnance (UXO) Technician I 24.74 30492 - Unexploded Ordnance (UXO) Technician II 29.93 30493 - Unexploded Ordnance (UXO) Technician III 35.88 30494 - Unexploded (UXO) Safety Escort 24.74 30495 - Unexploded (UXO) Sweep Personnel 24.74 30620 - Weather Observer, Combined Upper Air Or (see 2) 25.19 Surface Programs 30621 - Weather Observer, Senior (see 2) 27.98 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 14.32 31030 - Bus Driver 20.85 31043 - Driver Courier 13.98 31260 - Parking and Lot Attendant 10.07 31290 - Shuttle Bus Driver 15.66 31310 - Taxi Driver 13.98 31361 - Truckdriver, Light 15.66 31362 - Truckdriver, Medium 17.90 31363 - Truckdriver, Heavy 19.18 31364 - Truckdriver, Tractor-Trailer 19.18 99000 - Miscellaneous Occupations 99030 - Cashier 10.03 99050 - Desk Clerk 11.58 99095 - Embalmer 23.05 99251 - Laboratory Animal Caretaker I 11.30 99252 - Laboratory Animal Caretaker II 12.35 99310 - Mortician 31.73 99410 - Pest Controller 17.69 99510 - Photofinishing Worker 13.20 99710 - Recycling Laborer 18.50 99711 - Recycling Specialist 22.71 99730 - Refuse Collector 16.40 99810 - Sales Clerk 12.09 99820 - School Crossing Guard 13.43

99830 - Survey Party Chief 21.94 99831 - Surveying Aide 13.63 99832 - Surveying Technician 20.85 99840 - Vending Machine Attendant 14.43 99841 - Vending Machine Repairer 18.73 99842 - Vending Machine Repairer Helper 14.43

ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:

HEALTH & WELFARE: $3.59 per hour or $143.60 per week or $622.27 per month

VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)

HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)

THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE

FOLLOWING:

1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.

400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.

Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:

(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;

(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;

(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or

(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).

2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.

If you are a full-time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work).

HAZARDOUS PAY DIFFERENTIAL: An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordinance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry-house activities involving propellants or explosives.

Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving regrading and cleaning of artillery ranges.

A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation, irritation of the skin, minor burns and the like; minimal damage to immediate or adjacent work area or equipment being used.

All operations involving, unloading, storage, and hauling of ordance, explosive, and incendiary ordnance material other than small arms ammunition. These differentials are only applicable to work that has been specifically designated by the agency for ordance, explosives, and incendiary material differential pay.

** UNIFORM ALLOWANCE **

If employees…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .