Att2_-_QASP_DC_Baumholder.pdf

PDF 196 KB Posted

Attached to
Student Daily Commuting Transportation Services, Baumholder, Germany Federal contract opportunity
Solicitation number
HE1280-16-B-0009
Issued by
Department of Defense Education Activity

About this file

Attachment 2 QASP

View the file

Other files for this federal contract opportunity

Other files attached to Student Daily Commuting Transportation Services, Baumholder, Germany, newest first.
File Type Posted
HE1280-16-B-0009-0001.pdf PDF
Q A.pdf PDF
Att_1_-_SOW_DC_Baumholder_-_20160906.pdf PDF
HE1280-16-B-0009.pdf PDF
Exhibit_A_-Baumholder_School_Commuting_Area_16-17.pdf PDF
Att_3_-_Pricing_Sheets_Baumholder_DC__HE1280-16-B-0006.xlsx XLSX spreadsheet
Exhibit_B_-_Baumholder_DC_Routes_Km_ _Bus_Sizes.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR INFORMATIONAL PURPOSES ONLY

SOUTQASP - 20160906

HE1280-16-B-0009

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

DoDEA EUROPE EAST DISTRICT

SCHOOL TRANSPORTATION SERVICES

BAUMHOLDER AREA OF OPERATION

I. INTRODUCTION

1. This Quality Assurance Surveillance Plan (QASP) provides guidance and procedures to Government personnel responsible for surveillance of the contractor’s performance for work performed under

Contracts for the DoDEA Europe East District. Its primary focus is to ensure:

That contractor compliance and/or failure to comply with the terms and conditions of the contract are systematically identified, accurately documented and reported in a timely manner;

That a basis is provided to support contract administration decisions regarding acceptance of services, payment for services, and evoking contractual remedies for failure by the contractor to perform as required; and, That the Government's interests in its business dealings with the contractor are protected and served.

2. Through responsible surveillance of contractor performance, utilizing the methods and procedures prescribed herein, the QASP serves as an effective mechanism to ensure acceptance of the level of quality of services required by contractual requirements. It comports directly with the contract’s Statement of

Work (SOW), which identifies specific task requirements the Government will focus on during its inspection of services. The QASP is a stand-alone document internal to Government use and is provided to the contractor “For Informational Purposes Only.” The QASP is not a material or legally binding part of the contract itself.

The plan is developed on the premise that the Contractor, not the Government, is responsible for implementing effective management and quality control measures to ensure compliance with performance requirements.

Nonconformance with contract requirements is termed a “Deficiency”. The term “Deficiency” refers to performance of a service requirement that does not meet the associated contractual requirement defined in the contract’s SOW.

Inspection and acceptance of contractor services will be accomplished pursuant to the provisions of FAR Clause FAR 52.212-4 Contract Terms and Conditions – Commercial Items in the contract.

For services that do not conform to contract requirements, the Government may require the

Contractor to re-perform to ensure conformity and acceptance at no increase in contract amount.

In the event substandard services cannot be corrected through re-performance the Government will require the contractor to:

-- To take necessary action to ensure that future performance conforms to contract requirements, or;

-- Reduce the contract price in accordance with the associated deduction allowed for in the Standard Deductions.

In the event substandard performance occurs, should the contractor fail to take the necessary action to ensure future conformance with contract requirements, or promptly re-perform services to an acceptable level, the Government may:

-- Have the services performed by other means and charge to the contractor any cost incurred, or;

-- Terminate the contractor for cause.

3. Suggestions for changes, additions and improvements to this QASP are encouraged and will be subject to final approval by the Contracting Officer (CO). Written or telephonic coordination for changes, supplementation or improvements may be initiated by the Contracting Officer’s Representative (COR) with concurrent information retained by the East District Transportation Supervisor and the Student

Transportation Office.

4. It is important to emphasize that quality control is the sole responsibility of the contractor; not the

Government. The Government surveils and inspects the contractor’s performance for purposes of

“Assuring” the level of quality of services agreed to in the contract are received. Hence, the Government is responsible for quality assurance.

5. The Government has the right under this contract to perform quality assurance at any time or place as long as it does not interfere with the progress of the work. This means the Government may conduct inspections at any point in performance including:

Inspection of materials prior to incorporation into the work, or, inspection of the contractor's preparations;

Inspection during the work process itself, especially where quality characteristics may not be obvious from simple visual inspection of the output; and, Inspection of the completed item or service.

6. There are essentially five elements to quality assurance:

The output, service, or requirement the contractor is obligated to perform by the SOW;

The requirements established by the SOW, whether relating to quality, timeliness, and/or other measures;

The quality assurance method, including the frequency of its application;

The documentation and reporting of results, including checklists, work sheets, summary forms, and contract discrepancy reports (CDRs); and, Follow-up to ensure any required corrective action has been taken by the contractor.

II. DEFINITIONS

Alternate Contracting Officer's Representative (ACOR) - This individual will be designated by the CO.

The ACOR is responsible for surveilling and inspecting contractor performance and providing written recommendation for acceptance of services. This individual shall have overall responsibility for the coordination of contractor performance in accordance with the performance work statement and any resulting task order that may be issued by the CO. Duties also include technical assistance to the CO and surveillance and compliance duties as further enumerated in this plan.

Contract - An agreement between the government and contractor enforceable by law.

Contract Administration - All interrelated activities with the purpose of ensuring contract terms and conditions are met by both the contractor and the government.

Contracting Officer (CO) - An official in a contracting office authorized by written appointment to enter into, administer, and terminate contracts and place delivery orders under contracts.

Contracting Officer's Representative (COR) - This individual will be designated by the CO. The COR is responsible for surveilling and inspecting contractor performance and providing written recommendation for acceptance of services. This individual shall have overall responsibility for the coordination of contractor performance in accordance with the performance work statement and any resulting task order that may be issued by the CO. Duties also include technical assistance to the CO and surveillance and compliance duties as further enumerated in this plan.

Inspection - Examination of services by Government personnel utilizing applicable inspection methodologies to determine conformance to contract requirements, terms, and conditions.

Quality Assurance (QA) - Actions taken by Government personnel, including inspection, to determine if the products/services delivered by the contractor meet the contract requirements. Quality assurance involves a broader range of activities than just inspection.

Quality Control (QC) - Actions taken by a contractor to ensure that the product or service delivered under the contract meets the contract requirements.

Statement of Work (SOW) - Represents technical and management requirements of the contract including any applicable technical exhibits essential to the contractor’s performance of services.

Surveillance - Quality assurance and other actions taken by Government personnel to determine contractor conformance and nonconformance with contract performance requirements. Surveillance is a broader term than inspection or QA because it encompasses the examination of the business as well as the technical aspects of the contract. However, the term "quality assurance surveillance" refers to those surveillance actions directly related to quality assurance.

III. QASP PROCEDURES

1. Quality Assurance Surveillance Schedule - The COR and/ or ACOR, as applicable, will develop internal monthly surveillance schedules in calendar format for Government use only based on key performance requirements in the SOW and inspection methodology established herein. End of month inspection reports documenting contractor performance will be provided quarterly to the DoDEA-Europe

Procurement Office contract administrator and the East District Transportation Supervisor (DTS).

2. Method of Inspection - The methods of inspection to be utilized, at Government discretion, to assure quality services are received under the contract are identified below. These methods are “Scheduled

Inspection” and “Record of Customer Complaint.” Note that the Government reserves the right to unilaterally change its methods of inspection, and if accomplished, will promptly provide a copy of the revised QASP to the contractor for informational purposes:

Scheduled Inspection - The COR/ACOR will develop a monthly surveillance schedule in calendar format based on select requirements in the SOW. Table 1 provided with this QASP highlights select requirements for potential inspection. The COR/ACOR will complete and distribute each monthly surveillance schedule not later than the last workday of the preceding month beginning with the first month following the date of contract award. The COR/ACOR will send a signed copy of the schedule and any updates during the month to both the DoDEA Europe

Procurement Office contract administrator and the East District Transportation Supervisor (DTS).

A signed copy of the completed monthly surveillance schedule to include any updates shall be retained in the COR file. Every page of the monthly surveillance schedule shall be marked “FOR

OFFICIAL USE ONLY”. The surveillance schedule shall not be provided to the contractor in order to maintain the integrity of the process associated with quality assurance.

-- The COR/ACOR is responsible for selecting and scheduling routes and vehicles for inspection.

The COR/ACOR will utilize the Vehicle Quality Assurance Checklist as a guide for vehicle inspections.

-- Determination of various routes and vehicles for scheduled inspection is subjective. However, to provide consistent surveillance, and as a basis for comparing trends from month to month, the

COR/ACOR will apply consistent criteria in selecting and scheduling routes and vehicles for scheduled inspection.

-- The COR/ACOR should vary routes, runs and vehicles to be inspected, so the same services or vehicles are not inspected every time and inspections do not follow an obvious pattern.

Document the method used in scheduling inspections and apply it consistently from surveillance period to surveillance period so trends may be identified.

-- The COR/ACOR should schedule additional inspections for emphasis on known or suspected problem areas, plus to follow up on customer complaints. As needed, monthly surveillance schedules should be revised for additional inspections in problem areas. The COR/ACOR must establish a clear pattern of increased inspections to focus on problem areas, giving the contractor greater incentive to improve performance because known problem areas are being closely observed.

Record of Customer Complaint - At any time during the life of the contract, the COR/ACOR may receive customer complaints about the quality of services. The complainant or COR/ACOR should properly record all complaints. The COR/ACOR shall:

-- Investigate complaints as they are received to ensure they are valid and document the complaint on the form provided at Attachment 1; Record of Customer Complaint. Notify the contractor manager of any validated complaint and annotate the complaint form with the means, date, and time the contractor was notified. Retain validated complaint forms in the COR file.

-- Customer complaints are seldom used to reject a service or deduct money from contractor payments. However, validated customer complaints can reinforce the accuracy of sample results.

At the end of each month, count all validated complaints to determine if overall performance is acceptable or unacceptable. Forward a copy of each form to the CO’s with the COR/ACOR’s recommendation for further action, when necessary. When scheduled inspections also indicate unsatisfactory service, validated complaints may support seeking remedies other than or in addition to monetary deductions.

-- Customer complaints, like incidental COR/ACOR observations, may be the bases for scheduling follow-up observations under scheduled inspections, focusing attention on known or suspected problem areas. Revise or initiate scheduled inspection schedules as needed for emphasis on unsatisfactory areas of performance.

3. Documentation/Reports

a. Contractor Discrepancy Report:

A Contractor Discrepancy Report (CDR) is generally prepared by a COR to notify the contractor of a pending discrepancy. The purpose of a CDR is to allow the contractor to correct their discrepancy without interference from the Government. If the contractor fails to correct the discrepancy within the time given in the CDR, the CO has the option of elevating the issue. The

COR will generate the CDR and forward directly to the assigned Contract Specialist

(CS)/Contracting Officer (CO) within the DoDDS-E Procurement Division not later than the following business day. Upon receipt, the CS/CO will work jointly with the COR to ensure all information contained in the CDR is accurate, sufficient and credible. Once determined valid, sufficient and supportable the CS/CO will issue the CDR to the contractor the following business day. The Contractor will provide a written position in response to the CDR and return the document to the CS/CO within two (2) business days after receipt. The CO will render a final position of the CDR from the Contractor and issue the completed CDR to the Contractor. A copy will be provided to the COR with the original document being retained in the official contract file.

For every observed defect and validated customer complaint, the COR will initiate a CDR to document defects and track the steps taken to finalize the action. Fill in blocks 1-7 of the CDR as follows:

(1) Block 1: Enter the contract and current task order numbers.

(2) Block 2: Enter a CDR report number. Number CDR’s in sequence for each contract as defects occur. Maintain a log of CDR’s in report number sequence on a locally developed log which includes, as a minimum, the contract and task order numbers, the CDR report number, the date of defect, the dates sent to and received back from contractor, the date sent to DEPO, and the close-out date.

(3) Block 3: Enter the names of the contractor and contract manager.

(4) Block 4: Enter the COR’s name, title, and field office.

(5) Block 5: Enter Dates, prepared, and returned by contractor, action complete.

(6) Block 6: Describe the deficiency in detail; at a minimum, enter the date, time, bus route and run, CLIN, deficiency, and references in the contract specification.

(7) Block 7: The COR identified in Block 4 will sign representing the CO.

Table 1 below provides a list of select requirements within the SOW that represent areas of potential inspection in the Government’s surveillance of contractor performance. Note that the Government reserves the right to inspect any SOW requirement it deems necessary to ensure adequate and comprehensive surveillance of contractor performance.

Performance Requirement Summary (PRS) Chart

SOW

REFERENCE

STANDARDS

QUALITY

LEVEL

SURVEILLANCE

METHOD

REMEDY

Paragraph 4.2 Compliance with

Contractor Personnel

Standards/Requirements

100%

Compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph 4.3,

5.3.1 & 5.4

Compliance with Security

Standards/ Requirements

100%

Compliance

Planned Sampling/

Customer

Complaint

Review attendance records.

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraphs 4.3

& 5.10

Compliance with Safety

Procedures/Standards

100% compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraphs

4.9.a & b,

5.7.3.2 & 3, 5.10, and

5.10.7

Compliance with seat belt or child safety restraint system standards

100% compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

SOW

REFERENCE

STANDARDS

QUALITY

LEVEL

SURVEILLANCE

METHOD

REMEDY

Paragraph 4.15 Provide Student Ridership

Count Reports upon request

100% compliance

100 Percent

Inspection

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph 5.5 Report accidents or incidents verbally to COR

100%

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph 5.5.4 Submit written accident report or incident report to the COR by close of business next day

No more than 1 occurrence per month

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph 5.6 Completed Daily Vehicle

Safety/ Security

Inspection Checklist (and completed the expanded

School Transportation

Security Inspection

Checklist when ordered)

100%

Compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Paragraph 5.7 Host Nation and SOW

Vehicle Standards/

Requirements

100%

Planned Sampling the government shall document the

Contractor Performance

Assessment Report.

Paragraph

5.7.4.b

Vehicle is clean and provides a smoke-free environment

100%

Compliance

Planned Sampling/

Customer

Complaint the government shall document the

Contractor Performance

Assessment Report

Paragraph

5.7.4.e

Maintain 18-30 degree

Celsius passenger compartment temperature

No more than 1 occurrence per month

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

SOW

REFERENCE

STANDARDS

QUALITY

LEVEL

SURVEILLANCE

METHOD

REMEDY

Paragraph 5.8 Compliance with

Transportation Standards and Procedures

100% compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph 5.8.5 Perform all scheduled runs and service all stops

100% compliance

Planned Sampling/

Customer

Complaint

Deductions may be taken for services not performed. If contractor performance does not meet the acceptable quality level, the government shall document the

Contractor Performance

Assessment Report.

Paragraph

5.8.14.1

Notification to the COR of a time delay of 10 minutes or longer in completing a run

100%

Compliance

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Paragraph

5.8.14.2

Delay not corrected within

60 minutes of contractor notification to the COR

No more than 1 occurrence per month

100 Percent

Inspection

If contractor performance does not meet the acceptable quality level, the government shall document the

Paragraph 5.9 Report student misbehavior in writing by the end of the day if incident occurred on a morning run, and by 10:00

AM the next school day for a midday or afternoon run

No more than 1 occurrence per month

Planned Sampling/

Customer

Complaint

If contractor performance does not meet the acceptable quality level, the government shall document the

Paragraph 7.0 Perform and administer quality control program including sub-contractor management if applicable in accordance with the

QCP.

100%

Compliance

Random, Unscheduled, Planned, Validated

Customer

Complaints

If contractor performance does not meet the acceptable quality level, the government shall document the

For unsatisfactory or incomplete services, a CDR will be issued. Deductions will only be taken for services not performed (e.g., failure to complete a run). The CDR will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The CDR will cite each discrepancy by SOW requirement as listed in the Performance Requirements Summary. The CO may take other actions as deemed appropriate. CDR procedures may change as directed by the CO.

Inspection of services will be conducted by the COR and/or ACOR primarily on a planned sampling and customer complaint basis. For planned sampling, the sample selected for surveillance may be randomly selected or may focus on service areas perceived as critical to the U.S. Government. In a few cases, 100 percent inspection is appropriate for specific one-time events. Incidental surveillance may be conducted while the Contractor is performing services under the contract. The COR and/or ACOR will verify customer complaints before recording defects in Contractor performance; this compliments the planned sampling surveillance method.

ATTACHMENT 1

RECORD OF CUSTOMER COMPLAINT

Date of Complaint: ____________________ Time of Complaint: ___________________

Source of Complaint: __________________ School/Facility: ______________________

Individual: ___________________________ Contract Reference: __________________

Nature of Complaint:

Validation:

Date/Time Contractor Informed: ________________

Action Taken by Contractor:

Date Received/Validated by:

File details come from the government source that posted it. Updated .