This document contains questions and answers regarding a federal solicitation for the Defense Information Systems Agency to purchase and install equipment to provide redundant power sources and upgrades to the raised floor for two data center rooms at Pearl Harbor, Hawaii. Key details include: the current models and serial numbers of five CRAC units between the two rooms, whether the units have reheat or dehumidification, ECM fan motors, and ability to integrate status into the BAS system. The solicitation due date was extended from June 26 to July 27, 2022 following a pre-proposal site visit scheduled for June 14th with questions due by June 15th. The proposal submission can be via email.

View the file

Other files for this federal contract opportunity

Other files attached to 832267579 DC Hawaii Raised Floor, newest first.
File Type Posted
HC102822R0040 updated questions and answers.docx DOCX document
HC102822R0040 0001 solicitation amend 2.docx DOCX document
HC102822R0040 0001 solicitation amend.docx DOCX document
Solicitation.docx DOCX document
Bldg 77 layout and panels.pdf PDF
VAL Template.docx DOCX document
NDA.docx DOCX document
Pre-Proposal Site Visit.docx DOCX document
01-02 - Identification Labeling and Marking Spec.docx DOCX document
MDP-A one-line.pdf PDF
26-01 Electrical Safety Program.pdf PDF
01 33 00 - Submittal Procedures.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions:

1. Model & Serial number of current CRAH’s Response:

a.Liebert/Vertiv mod #: CW076DC1A2A303; ser #: N14K150018 (room 164)
b.Liebert/Vertiv mod #: CW076DCSA29019A; ser #: C10G140159 (room 164)
c.Compu-Aire mod #: CAC-6034; ser #: 8630FY1107-6164 (room 189)
d.Compu-Aire mod #: CAC-6034; ser #: 8630FY1107-6163 (room 189)
e.Compu-Aire mod #: CAC-6034; ser #: 8630FY1107-6165 (room 189)

2. Do they have reheat / dehumidification Response: The two vertiv units in room 164 do not have reheat. The three Compu-Aire units in room 189 have re-heat.

3. Do they have ECM fan motors Response: The two vertiv units in room 164 have ECM fans. I do not believe the units in room 189 have ECM fans.

4. Is the switch status to be viewable on BMS (may require integration) Response: Yes. ATS status should be incorporated in BAS system via modbus.

5. Current OPD size for units Response:

a.Liebert/Vertiv mod #: CW076DC1A2A303 (15A/3P)
b.Liebert/Vertiv mod #: CW076DCSA29019A (20A/3P)
c.Compu-Aire mod #: CAC-6034 (100A/3P)
d.Compu-Aire mod #: CAC-6034 (100A/3P)
e.Compu-Aire mod #: CAC-6034 (100A/3P)

6. Are units chilled water Response: Yes. All CRAH units are chilled water.

7. If the indoor units are DS, will outdoor units need ATS kits as well Response: No. Clarify “DS”, did you mean “DX”? ATS is only required for the pair of CRAH’s in room 189.

8. Are there sufficient number of redundant units in order to take equipment down for retrofit ATS kits Response: Yes.

9. Is the secondary power from a backup generator or utility feed from independent source Response: Secondary power comes from alternate electrical distribution bus. Site is configured with two separate distributions paths supported by backup generator.

10. Switchgear/board manufacture Response: Proposed alternate feeder source for CRAH units in room 164 comes from distribution panel in room 180. Manufacture is Eaton Cat #: CA:P4E250BT60CH01, 50kAIC Proposed alternate feeder for ATS and CRAH units in room 189 come from distribution panel manufacturer is Siemens Cat #: SB3 Rev. A, 65kAIC

11. The proposal due date is Sunday, June 26, 2022.

We would like to formally request an extension to the due date for the proposal. The site walk through is scheduled for June 14 and questions are due June 15. This gives offerors only approx. 7 days to price and write our proposals. This timeframe does not take into consideration how long DISA will need to answer questions.

Response: This solicitation is extended until July 27, 2022.

12. Section L: Proposal Requirements is missing from the Solicitation document.

Response: All solicitation documents are posted.

13. Is Section M: Evaluation Criteria the same as Section 52.212-2 of this Solicitation?

Response: Use section 52.212-2 evaluation criteria for this solicitation.

14. On page 57 of the Solicitation, it states the following:

d) The contractor must provide the completed Attachments (Provisions and Clauses) in response to this solicitation.

Please explain.

Response: There are provisions and clauses that need to be filled out by the prospective contractors when they submit their proposal in the solicitation.

15. Is this a hardcopy or email proposal submission?

Response: The proposal can be emailed.