Question_Round_2_number_1.pdf
PDF 182 KB Posted
- Attached to
- Indian Head DISA Compound HVAC System Maintenance Federal contract opportunity
- Solicitation number
- HC1028-15-T-0007
- Issued by
- Defense Information Systems Agency
About this file
Question and Answer round 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC1028-15-T-0007-0002.pdf | ||
| HC1028-15-T-0007_questions_answers.pdf | ||
| HC1028-15-P-0007-0001.pdf | ||
| HC1028-15-T-0007_RFQ_1449.pdf | ||
| SECNAV_5512_1_11787_APPROVED_AC_PASS_ID_FORM_05282014.pdf | ||
| Pricing_table.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Round 2 number 1 (Q 2-1): Can you please provide a list of known deficiencies to the Equipment? This list is for the purpose of pricing CLIN0004.
Answer 2-1:
UNIT* Model ISSUE
1. Compu-Aire MKA 1534 HIGH HEAD PRESSURE ALARM/COMPRESSOR 1 FAILURE
2. Compu-Aire MKA 1534 NO AIR FLOW AND WATER UNDER FLOOR ALARM
3. Compu-Aire MKA 1534 HIGH HEAD PRESSURE ALARM
4. Compu-Aire MKA 1534 HIGH HEAD PRESSURE ALARM/COMPRESSOR 1 AND 2 FAILURES
5. Compu-Aire MKA 1534 COMPRESSOR 1 FAILURE
6. Compu-Aire MKA 1534 COMPRESSOR 2 FAILURE
7. Leibert VH125AUAAES HUMIDIFIER FAILURE
8. Leibert VH125AUAAES HUMIDFIER FAILURE/SHORT CYCLE ERROR
9. Trane AHU PCAA14F1B0FTW // Heartcraft Condenser TTA240B400DA COMPRESSOR FAILURE
10. SATS C08-060-AR-U // HeatCraft FCB8 HUMIDIFIER FAILURE
11. SATS C08-060-AR-U // HeatCraft FCB8 FAN MOTOR FAILURE/HUMIDIFIER FAILURE
13. SATS VFS180-DAR-U // Larkin Condenser MFCB21SM ROOFTOP FAN MOTOR FAILURE
16. Leibert CRAC DH245AAAE19573 // Leibert Condenser CDF308-A HUMIDIFIER/WATER SOLENOID FAILURE
17. Leibert CRAC DH245AAAE19573 HUMIDIFIER/WATER SOLENOID FAILURE
*note: Unit number reflects internal site inventory equipment count. The skipped numbers are intentional and do not reflect missing information.
Note from Site: “Some of these issues are intermittent, meaning they may run fine for a week or two before they act up again. Some of these issues may have been a direct result of the below average temperatures we had this winter.”
Q 2-2: Can a limit of liability be set for CLIN0004? So the basis of my question is to see if a ceiling price could be put on the clin.
A 2-2: The intent of CLIN 0004 is to bring all on site units to an operational status. The above issues are the only known problems; however additional problems may be uncovered through the repair process.
Since the site visit was conducted in unfavorable weather, the government is aware that limited inspections were conducted on the equipment. Please submit quotes that will address and repair all above listed items. Any repairs above and beyond those listed above will require a modification to the contract or other methods to authorize.
File details come from the government source that posted it. Updated .