17R0017_LRI_Attch_07_Price_Model_.xls

XLS spreadsheet 46 KB Posted

Attached to
DoD Language Readiness Index
Solicitation number
H9821017R0017
Issued by

About this file

Attch. 7 Price Model

View the file

Other files

File Type Posted
17R0017_Amd03_LRI.pdf PDF
17R0017_Amd_02_LRI__FINAL.pdf PDF
17R0017_LRI__QnA_1of2__27Apr18.pdf PDF
17R0017_LRI__QnA_2of2__27Apr18.pdf PDF
17R0017_Amd_01_LRI.pdf PDF
17R0017_LRI_Attch_02_Rate_Hours_PWS.xlsx XLSX spreadsheet
17R0017_LRI_Attch_09_PPQ_.docx DOCX document
17R0017_LRI_Attch_10_PPRQ_.docx DOCX document
17R0017_LRI_Solicitation_31Mar18_FINAL.pdf PDF
17R0017_LRI_Attch_01_Labor_Cat_Desc.xlsx XLSX spreadsheet
17R0017_LRI_DD254_SIGNED.pdf PDF
17R0017_LRI_Attch_04_Cvr_letter.pdf PDF
17R0017_LRI_Attch_05_Hist_Labor_Category_.docx DOCX document
17R0017_LRI_Attch_11_Subcontract_Plan.docx DOCX document
17R0017_LRI_Attch_06_Delivery_Instruc.pdf PDF
17R0017_LRI_Attch_03_Crosswalk.xlsx XLSX spreadsheet
17R0017_LRI_PWS_13Sept.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Model

Independent Government Cost Estimate - SERVICES Ver. March 201X
Company NameProject Title:Language Readiness Index (LRI)
Date:Point of Contact (POC):
Summary
Total Period of Performance:8-Month Base Period + Four 12-month Options
Base Period$0.00
Option 1$0.00
Option 2$0.00
Option 3$0.00Requirements for Services exceeding three years: Include the signed "Justification and Authorization to Award a Contract with a Period of Performance Exceeding Three Years" in your requirements package.
Option 4$0.00
Grand Total$0.00
Base Period: 8 Months (6 Jul 2018 - 5 Mar 2019)
Labor CategoryHoursRateTotalBasis of Estimate
Examples:$0.00
Program Manager92$0.006 hrs per mo plus 20 hrs start up/close out, PWS 4.1
Communication Consultant, Level II1960$0.001 FTE for 12 months, PWS 4.2-4.4
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Total2052$0.00
Other Direct Costs (ODCs)Do Not Fill-In NTE Provided at time of award at Cost.
Travel$0.00
Print
ODC Subtotal$0.00
Base Period Total$0.00
Option Period 1: 12 Months (6 Mar 2019 - 5 Mar 2020)
Labor CategoryHoursRateTotalBasis of Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Total0$0.00
Other Direct Costs (ODCs)Do Not Fill-In NTE Provided at time of award at Cost.
Travel$0.00
ODC Subtotal$0.00
Option Period 1 Total$0.00
Cumulative Total$0.00
Option Period 2: 12 Months (6 Mar 2020 - 5 Mar 2021)
Labor CategoryHoursRateTotalBasis of Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Total0$0.00
Other Direct Costs (ODCs)Do Not Fill-In NTE Provided at time of award at Cost.
Travel$0.00
ODC Subtotal$0.00
Option Period 2 Total$0.00
Cumulative Total$0.00
Option Period 3: 12 Months (6 Mar 2021 - 5 Mar 2022)
Labor CategoryHoursRateTotalBasis of Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Total0$0.00
Other Direct Costs (ODCs)Do Not Fill-In NTE Provided at time of award at Cost.
Travel$0.00
Print
ODC Subtotal$0.00
Option Period 3 Total$0.00
Cumulative Total$0.00
Option Period 4: 12 Months (6 Mar 2022 - 5 Mar 2023)
Labor CategoryHoursRateTotalBasis of Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Total0$0.00
Other Direct Costs (ODCs)Do Not Fill-In NTE Provided at time of award at Cost.
Travel$0.00
Print
ODC Subtotal$0.00
Option Period 4 Total$0.00
Cumulative Total$0.00

File details come from the government source that posted it.