PWS_Disaster_Kleenup.docx

DOCX document 23 KB Posted

Attached to
Emergency Water Extraction
Solicitation number
H98210-15-P-0010
Issued by

About this file

Performance Work Statement - Emergency Water Extraction

View the file

Other files

File Type Posted
Justification_and_Approval.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

1.0 INTRODUCTION The Defense Manpower Data Center (DMDC) requires emergency water removal/extraction/remediation from the Department of Defense Center (DoDC) caused by torrential raining on December 11, 2014.

2.0 BACKGROUND

2.1. On December 11, 2014 the weather service warned of a weather front coming through Seaside, CA. In a short period of time the area was devastated with 8-12 inches of rain. The drainage system of the facility located at 400 Gigling Road could not handle to excessive rain flow and caused flood conditions ion the data center.

3.0SCOPE The Contractor shall provide the personnel, management and materials necessary to extract approximately 50,000 gallons of water from 40,000 square feet of roof space
4.0REQUIREMENTS The Contractor shall:

4.1 Extract standing water from roofs on the 5th, 6th, and 8th floor of the DoDC located at 400 Gigling Road, Seaside CA.

4.2 Dry all areas as required to prevent damage inside data center and to restore to pre-storm condition.

4.3 Perform all work in accordance with American National Standards Institute (ANSI)/IICRC (Institute of Inspection Cleaning and Restoration Certification) S500 Professional Water Damage Restoration Guidelines.

5.0 DELIVERABLES

Deliverable
PWS Ref.
Delivery Date
Emergency Water Extraction/drying
4.0
Within four hours of verbal authorization to proceed

6.0 CONTRACTOR MANPOWER REPORTING:

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for DMDC via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil

Ver: April 2014

File details come from the government source that posted it. Updated .