Amendment 0002.pdf
PDF 32 KB Posted
- Solicitation number
- H94003-10-T-0011
- Issued by
-
Defense Microelectronics Activity
About this file
Amendment 0002 to DMEA RFQ H94003-10-T-0011.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0RC0F002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide a revised Government Furnished Equipment (GFE) list as show n on Page 2 of the Statement of Work (SOW) 10-0F0 dated 28 July 2010. Additional parts/equipment have been added. Please replace the original Page 2 of the SOW w ith the attached revised Page 2.
The due date/time for receipt of proposals remains 7 September 2010, Tw elve O'Clock noon, Pacific Time.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H94003-10-T-0011
X 9B. DATED (SEE ITEM 11)
16-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2010
CODE
DEFENSE MICROELECTRONICS ACTIVITY
CONTRACTING DIVISION
4234 54TH STREET
MCCLELLAN CA 95652-2100
H94003 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
doster@dmea.osd.milEMAIL:(916)231-1521TEL:
DAWN B. DOSTER / CONTRACTING OFFICER
H94003-10-T-0011 Amendment 0002
0002SOW 10-0F0 Replacement Page 2
2.0 GOVERNMENT FURNISHED EQUIPMENT/INFORMATION (GFE/GFI): The government will provide the schematic diagram, physical board dimensions, bill of materials, and any additional data necessary for the contractor to complete the layout, fabrication, assembly, and packaging. The data will be furnished in the Cadence Or CAD format.
Nomenclature Date Available
Initial Miniaturization Schematic and BOM At contract award Ramtron F-RAM 2Mb – FM25H20-DG (QTY 5) At contract award Measurement Specialties Barometer Module – MS5540-CM (QTY 5) At contract award Hittite Microwave GaAs MMIC 10W SPDT Failsafe Switch – HMC546LP2E (QTY 5) At contract award Texas Instruments IC Step-down Converter – TPS62051DGS (QTY 5) At contract award SignalQuest Omnidirectional Tilt and Vibration Sensor – SQ-SEN-200-ICT (QTY 8) At contract award Linear Technology IC TXRX RS485/RS422 – LTC2850IMS8#PBF (QTY 5) At contract award Hittite Microwave Failsafe ISM Band Switch – HMC646LP2E (QTY 5) At contract award Vishay/Siliconix MOSFET N/P-CH 12V – SI7540DP-T1-GE3 (QTY 5) At contract award BOURNS Power Inductor, 10μH – SRR1260-100M (QTY 5) At contract award National Semiconductor Wide Voltage Range Buck-Boost Controller –
LM5118Q1MH/NOPB (QTY 5)
At contract award
Iridium Transceiver Module and Physical Specifications (QTY 1) At contract award Global Positioning System (GPS) Navman Wireless Jupiter 32 xLP Module (QTY 1) At contract award Global System for Mobile Communications (GSM) Leon-G100 Module (QTY 1) At contract award Texas Instruments MSP430 Mixed Signal Microcontroller – MSP430F5438A (QTY as specified for all deliveries)
At contract award
Final Miniaturization Schematic and BOM 20 business days After
Initial Miniaturization Delivery
Iridium Transceiver Modules (QTY as specified for enclosure assembly) At start of Final
Miniaturization GPS Navman Wireless Jupiter 32 xLP Modules (QTY as specified for all production) At start of Final
Miniaturization GSM Leon-G100 Modules (QTY as specified for all production) At start of Final
Miniaturization Internal battery (QTY as specified for Miniaturization Phase production) At start of Final
Miniaturization
2.1 OTHER DOCUMENTS:
DoD Test Method Standard: Environmental Engineering Considerations and Laboratory Tests
MIL-STD-810G
Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
MIL-STD-461E
File details come from the government source that posted it. Updated .