Attachment 1 - Product Description - Multifunctional Doors_14Feb22.docx
DOCX document 36 KB Posted
- Attached to
- Multifunctional Doors and Supporting Material
- Solicitation number
- H92240-21-R-0003
- Issued by
-
United States Special Operations Command
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 - Product Description Multifunctional Doors and Supporting Material Naval Special Warfare Command 14 February 2022
1.0 BACKGROUND: Multifunctional Doors and Supporting Material required for ‘Breacher’ Door training at various training facilities throughout the Naval Special Warfare Command.
2.0 OBJECTIVE: To establish a five (5) year Blanket Purchase Agreement (BPA) for multifunctional door types and supporting materials.
3.0 DESCRIPTION OF REQUIREMENT: The vendor shall provide various types of multifunctional doors and support material as identified below. All metal and screen doors shall require primer painted surfaces only. All wooden type doors shall be un-finished. All other Class IV materials in specifications shall be Commercial Off The Shelf (COTS); no items will require special finishes or primer covering of any kind. Any exceptions to this will be identified and negotiated at the Call Order level. Materials provided shall meet commercial standards for quality. This Product Description encompasses a variety of commercial items of a general hardware store nature, but is not all inclusive. The intent of this requirement is to provide the ability to purchase a wide variety of commercial items of a general hardware store nature, therefore other items of a same/similar nature may be added throughout the duration of the contract.
3.1 Specifications/Salient Characteristics:
3.1.1 Support Doors A
a) 36” x 84” Fiberglass Covered Residential, Pre-Hung, Right and Left Openings
b) 36” x 84” Solid Plank, Pre-Hung, Right and Left Openings
c) 36” x 84” Hollow Core, Pre-Hung, Right and Left Openings
d) 30” x 80” Metal Security Screen, Pre-Hung, Right and Left Openings
e) 30” x 80” Hollow Core, Pre-Hung, Right and Left Openings
f) 32” x 80” Solid Plank, Pre-Hung, Right and Left Openings
g) 26” x 57” Steel Door, Pre-Hung, Right and Left Openings
h) 30” x 66” Steel Door, Pre-Hung, Right and Left Openings
i) 32” x 80” Metal Security Screen Doors, Pre-Hung, Right and Left Openings
j) 32" x 80" Steel Doors, Pre-Hung, Right and Left Openings
k) 36" x 80" Solid Plank, Exterior Pre-Hung, Right and Left Openings
3.1.2 Support Materials A
a) Plywood, Pressure Treated - 4’ x 8’ x ¼”
b) Plywood, Pressure Treated – 4’ x 8’ x ½”
c) Plywood, Pressure Treated – 4’ x 8’ x ¾”
d) Plywood, Non-Treated - 4’ x 8’ x ¼”
e) Plywood, Non-Treated – 4’ x 8’ x ½”
f) Plywood, Non-Treated – 4’ x 8’ x ¾”
g) Steel Galvanized Pipe – 2” x 7’
h) Drywall Screws 1-5/8” length (5lb package/bucket)
i) Drywall Screws 3” length (5lb package/bucket)
j) Door Knobs - Rotating with Locking Devices, Satin or No Finish, Must fit All Exterior Doors listed in para 3.1.1
k) Door Knobs – Dummy (for Closets), Satin or No Finish, Must fit All Interior Doors listed in para 3.1.1
l) Concrete block 8”x8”x16”
m) 20' sticks of Re-bar 3/8”
n) Concrete ready mix 40lb. bags
o) Steel "I" Beams (for cutting) 6”x3”, 10’ in length
p) Steel "I" Beams (for cutting) 8”x1/4”, 10’ in length
q) 4'x8'x1/4" Metal Sheets
r) 4'x8'x1/8" Metal Sheets
s) Standard Windows - Dual Pane, 36” x 36”
t) Standard Windows - Dual Pane, 32” x 36”
u) 2” x 2” x 10’ Stick Lumber, Pressure Treated
v) 2” x 2” x 12’ Stick Lumber, Pressure Treated
w) 2”x 4”x 8’ Stick Lumber, Pressure Treated
x) 2”x 4”x 10’ Stick Lumber, Pressure Treated
y) 2”x 4”x 12’ Stick Lumber, Pressure Treated
z) 2”x 6”x 8’ Stick Lumber, Pressure Treated
aa) 2”x 6”x 10’ Stick Lumber, Pressure Treated
ab) 2”x 6”x 12’ Stick Lumber, Pressure Treated
ac) 2”x 12“x 8’ Stick Lumber, Pressure Treated
ad) 2”x 12“x 10’ Stick Lumber, Pressure Treated
ae) 2”x 12“x 12’ Stick Lumber, Pressure Treated
af) 2” x 2” x 10’ Stick Lumber, Non-Treated
ag) 2” x 2” x 12’ Stick Lumber, Non-Treated
ah) 2”x 4”x 8’ Stick Lumber, Non-Treated
ai) 2”x 4”x 10’ Stick Lumber, Non-Treated
aj) 2”x 4”x 12’ Stick Lumber, Non-Treated
ak) 2”x 6”x 8’ Stick Lumber, Non-Treated
al) 2”x 6”x 10’ Stick Lumber, Non-Treated
am) 2”x 6”x 12’ Stick Lumber, Non-Treated
an) 2”x 12“x 8’ Stick Lumber, Non-Treated
ao) 2”x 12“x 10’ Stick Lumber, Non-Treated
ap) 2”x 12“x 12’ Stick Lumber, Non-Treated
1.0 2.0 3.0 3.1 3.1.1 3.1.2
3.1.3 Support Doors B
a) 3'0" x 6'8" RH SC Birch Steel Frame Door
b) 3'0" x 6'8" RH 6 Pan Steel Edge Door, Steel Frame
c) 3'0" x 6'8" RH 6 Pan Steel Door, Residential
d) 3'0" x 6'8" Steel Security Storm Door without Mesh, Door Knob Deadbolt Configuration
e) 3'0" x 6'8" RH 6 Pan Steel Door, Residential with Pre-Installed Lock/Deadbolt Combo
3.1.4 Support Materials B
a) 1" x 6" x 8' Stick Lumber, Pressure Treated
b) Steel Plate - 60" x 96" x 1/2"
c) Steel Plate - 60" x 96" x .375"
d) Steel Plate - 35" x 55" x 1/2"
e) Steel Plate - 35" x 55" x 1/4"
f) Steel Plate - 35" x 55" x .375"
g) Steel Plate - 44" x 62" x .375"
h) Steel Plate - 44" x 62" x 1/4"
i) Rebar, Steel, Deformed #4 - 20' (1/2")
j) Rebar, Steel, GR60 #5 - 240" (5/8")
k) Steel "I" Beams - 6” x 20# x 120"
l) Square Tubing - GR B, 2"SQ x 0.250"WA x 240"
m) Square Tubing - A36, 1.50" x 1.50" x 0.250" x 240"
n) Brass Flat Sheet - 0.125" x 8" x 11"
o) Carbon Angle, Steel - A36, 2" x 2" x 0.250" x 240"
p) Chain-Link / Cyclone Fence - 8' (Height) x 50' (Length)
q) Glass Window - Double Hung with Lock - 30 1/2" x 36 1/2"
r) Lock/Deadbolt Combo (Item to fit Doors listed in para 3.1.3)
3.1.5 Support Doors C
a) 36” x 80” x 1 ¾” to include 4 9/16” Primed Jamb, with Casing – Residential RH
b) 36” x 80” x 1 ¾” to include 4 9/16” Primed Jamb, with Casing – Residential LH
c) 64” x 80” - Double Doors, Hollow Core, Luan, Interior Flat Jamb, No Casing, Single Bore, Tastral with Flush Bolts, Top and Bottom Installed, 1 5/16” thickness
d) 30” X 80” Hollow Core, Lauan Interior Door, Primed Jamb, No Casing, RH, 1 5/16” thickness
e) 36” x 80” x 1 ¾” to include 4 9/16” Primed Jamb, No Casing – Residential Insulated RH
f) 36” x 80” x 1 3/8” to include 4 9/16” Primed Jamb, No Casing, - Hollow Core Luan Interior Door RH, 1 5/16” thickness
g) 36” x 80” x 1 3/8” to include 4 9/16” Primed Jamb, No Casing - Solid Core RH
3.1.6 Support Materials C
a) Residential Lock Sets (Knob and Dead Bolt)
b) Deck Screws 1 5/8” length (5lb package/bucket)
c) Deck Screws 2” length (5lb package/bucket)
d) Deck Screws 3” length (5lb package/bucket)
e) 4” Zinc Coated, Steel Barrel Bolts
f) 3 ½” Zinc Coated, Swivel Hasp
g) Steel plate - Hot rolled, ASTM A-36, 48” x 96” – 3/8” thickness
h) Steel plate – Hot rolled, ASTM A-36, 48” x 96” – 1/2” thickness
i) Steel plate - Hot rolled, ASTM A-36, 48” x 96” – 1/4” thickness
j) Steel plate – Hot rolled, ASTM A-36, 48” x 48” – 3” thickness *Vendor will have the ability to cut to size steel plate indicated on the Delivery Order
k) 1" x 4" x 8' Stick Lumber, Yellow Pine
l) 1" x 6" x 8' Stick Lumber, Yellow Pine
m) 1" x 10" x 8' Stick Lumber, Yellow Pine
n) 1" x 12" x 8' Stick Lumber, Yellow Pine
o) Drywall screws, #6 x 1 5/8” - #2 Philips head – 25 lbs. box
p) Drywall screws, #8 x 3” - #2 Philips head -25 lbs. box
q) SMART side 38 series panels – .315 x 48” x 96”
r) ½” PT pine plywood sheathing - .47 x 48” x 96”
s) Galvanized sheet – ASTM- A-653 – #20 gauge x 36” x 96” (approximation in weight 39.74 each).
t) Galvanized sheet – ASTM- A-653 – #26 gauge x 36” x 96” – (approximation in weight 39.74 each).
3.1.7 Other
a) Other related items identified at the Call Order level
3.2 Quantity: Specific types and quantities to be ordered will be identified at the Call Order Level and can be an assortment of items from any of the paragraphs identified above.
4.0 DELIVERY INFORMATION
4.1 Required delivery date: All items shall be delivered no later than 30 days after receipt of order, unless otherwise specified and negotiated at the Call Order Level.
4.2 Delivery address: To be specified at the Call Order Level.
Estimated Delivery Locations:
West Coast – California East Coast – Virginia, North Carolina South – Mississippi, Arkansas Mid-East – Kentucky, Indiana
NOTE: The Government reserves the right to utilize additional delivery locations within the United States (to include Alaska and Hawaii) if the mission dictates which will be negotiated at the Call Order Level.
| 4.3 | Special Instructions: | |
| 4.3.1 Vendor must coordinate delivery with site manager or technical representative at least three weeks prior to delivering doors/material. | ||
| 4.3.2 Vendor must be able to timely obtain personnel and vehicle access to military installations. Vendor is responsible for coordinating all necessary access through the local Military Pass and Decal Office. Vendor shall contact the pass and decal office immediately upon delivery order award to determine access paperwork timeline. Vendor will coordinate with Government end users. | ||
| 4.3.3 Vendor shall have items palletized, plastic wrapped, and forklift accessible prior to transporting them to the delivery location. | ||
| 4.3.4 Vendor will ensure palletized items do not exceed 6,000 pound forklift capacity at each delivery location. |
5.0 SECURITY: Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.
6.0 SAFETY: Nothing in the Product Description, nor any Government action or failure to act in performance of the contract shall relieve the Contractor of its responsibility for the safety of the Contractor's personnel and property, the Government's personnel and property, and the general public. Furthermore, nothing in this Product Description (PD) shall relieve the Contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.
7.0 QUALITY CONTROL: The Contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PD. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the BPA.
8.0 QUALITY ASSURANCE:
8.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the BPA terms and performance of the requirements in the PD. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
8.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory Contractor performance, the Contracting Officer will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The Contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the Contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
9.0 COVID-19 CONSIDERATIONS:
9.1 Contractor shall comply with provided guidance relating to the prevention of COVID-19. This may include Presidential Executive Orders, CDC, DOD, local, and federal installation guidelines. Contractor personnel may be subject to quarantine/isolation periods at certain locations and shall comply with any federal, state, or local, including federal installation (command specific) requirements.
10.0 PLACE OF PERFORMANCE
10.1 Supplies shall be delivered to multiple NSW facilities. Specific locations shall be called out at the Call Order Level.
11.0 PERIOD OF PERFORMANCE
11.1 Call Orders may be placed against this contract for 5 years (60 months) from the date of BPA award.
File details come from the government source that posted it. Updated .