Proposal_Breakdown.pdf
PDF 74 KB Posted
- Attached to
- CDC Equipment and Excess Move
- Solicitation number
- GSACDC20171
About this file
Proposals should match attached proposal breakdown. This will be the only accepted format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions&Answers_2.8.17_(2).pdf | ||
| Revised_CDC_Move_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| Amedment_0003_Signed.pdf | ||
| Amedment_0002_Signed.pdf | ||
| Amedment_0001_Signed.pdf | ||
| CDC_SOW_Equipment_and_Excess_Moves_Metro_IV-Rev_1-17-17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantity Description Crew Labor
30 Trucks – Tractor Trailers Pick Up and Delivery 1 16
30 Trucks – Tractor Trailers Storage 1 2
2 Trucks – Disposal to Pick Up and Delivery to Land Fill 1 16
42 Move Labor Furniture and Equipment 10 8
12 Building Protections 4 2
1 Installer Miscellaneous Equipment Breakdown 4 16
1 Fitness Equipment Breakdown Excess Move 4 16
1 Fitness Equipment Breakdown and Reinstall Internal Move 4 16
1 General Conditions 1 40
1 Project Management 1 336
Unit
Truck/Hours
Month/Material/Equip
Truck/Hours/Material
Days/Labor Hours
Labor Hours/material
Labor Hours/Mat/Equip
Labor Hours/Mat/Equip
Labor Hours/Mat/Equip
Labor Hours
Labor Hours
File details come from the government source that posted it. Updated .