RFQ Amend 03 - JFB.doc
DOC document 81 KB Posted
- Solicitation number
- GS-10P-09-LT-R-0114
About this file
SF30 Amendment 03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09LTR0114JFB.ARRA.DB.RFQ.Amd3.doc | DOC document | |
| RFQ Amend 02 - JFB.doc | DOC document | |
| 09LTR0114JFB.ARRA.DB.RFQ.Rev3.Amd2.doc | DOC document | |
| jfb.phaseone.sitevisit.roster.pdf | ||
| 09LTR0114JFB.ARRA.DB.RFQ.Rev2.Amd01.doc | DOC document | |
| 3490.1A_01June2009_Signed.pdf | ||
| RFQ Amend 01 - JFB.doc | DOC document | |
| JFB Phase One Site Visit Agenda and Notes.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF30 Continuation of Block Narrative
| Page |
| 2 |
| of |
| 2 |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| 03 |
| October 16, 2009 |
| 6. Issued By |
| Code 10PDC |
| 7. Administered By (If other than Item 6) |
| Code |
| GSA Property Development Br |
| SEE BLOCK 6 |
| Capital Projects Branch (10P2PCPQ) |
| GSA Ctr 400 15th St SW |
| Auburn, WA 98001-6599 |
Kimberlee Wallentine, 253 931-7195
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| GS-10P-09-LT-R-0114 |
Vendor ID: 0000
9B. Date (See Item 11)
DUNS:
September 25, 2009
10A. Modification of Contract/Order No.
| CAGE: |
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
| E. IMPORTANT: Contractor |
| x |
| is not, |
is required to sign this document and return 3 copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
RECOVERY – JACKSON FEDERAL BUILDING MODERNIZATION
DESIGN/BUILD CONSTRUCTION PROJECT
SEATTLE, WA
See next page for details.
ATTACHMENTS
(1) Revised RFQ (see Section 00110)
A. GENERAL.
The RFQ is changed/clarified as follows:
1) Errors noted in Amendment 02 – The answer to question 12 indicates the Lead Designer should be from MEP design background, however on page 16 of the RFQ the Proposed Lead Designer shall be a registered architect/engineer. On page 15 of the RFQ under section c. Factor 3, Standard Evaluation, item 2 Resumes, item g - Lead Engineers (Mechanical, Electrical and Plumbing) are listed however, on page 17 the submittal requirements for Lead Engineers request (Mechanical, Structural, Civil, Electrical, Fire Protection). In addition, on page 18 under Tab 4; Factor 3 Technical Approach section the same disciplines are listed (Mechanical, Structural, Civil, Electrical, Fire Protection).
Answer: The change on page 15 is correct; the additional listings on Pages 17 and 18 were inadvertently overlooked. The attached Revised RFQ (see Section 00110) has corrected the additional citation to reflect the requirement for information on Lead Engineers for mechanical, electrical and plumbing.
--END OF AMENDMENT--
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .