SCOPE OF WORK | SOLICITATION NUMBER: GS-08-P-17-JF-C-0001
USDA CONSOLIDATION PROJECT | WALLACE F. BENNETT FEDERAL BUILDING
CONTRACT PRICE SHEET
WALLACE F. BENNETT FEDERAL BUILDING
USDA CONSOLIDATION PROJECT | BID PACKAGE 2
PROJECT IDENTIFICATION:
BIDDING FIRM NAME:
| PROJECT NAME |
| USDA CONSOLIDATION PROJECT | BID PACKAGE 2 |
| SOLICITATION NUMBER |
| GS-08-P-17-JF-C-0001 |
| BUILDING NAME |
| WALLACE F. BENNETT FEDERAL BUILDING |
| BUILDING ADDRESS |
| 125 SOUTH STATE STREET, SALT LAKE CITY, UT |
MASTER SUMMARY - BASE PROPOSAL
| SECTION |
| COST/SF |
| TOTAL |
| 01 |
| GENERAL REQUIREMENTS |
| 02 |
| EXISTING CONDITIONS |
| 03 |
| CONCRETE |
| 04 |
| MASONRY |
| 05 |
| METALS |
| 06 |
| WOODS & PLASTICS |
| 07 |
| THERMAL & MOISTURE PROTECTION |
| 08 |
| DOORS & WINDOWS |
| 09 |
| FINISHES |
| 10 |
| SPECIALTIES |
| 11 |
| EQUIPMENT |
| 12 |
| FURNISHINGS |
| 21 |
| FIRE SUPPRESSION |
| 22 |
| PLUMBING |
| 23 |
| HEATING, VENTILATING, & AIR CONDITIONING |
| 26 |
| ELECTRICAL |
| 27 |
| COMMUNICATIONS |
| 28 |
| ELECTRONIC SAFETY & SECURITY |
SUB-TOTAL (CONSTRUCTION)
| CONTRACTOR GENERAL CONDITIONS |
| % |
| CONTRACTOR BOND |
| % |
| CONTRACTOR OVERHEAD & PROFIT |
| % |
TOTAL CONSTRUCTION COST
MASTER SUMMARY - ALTERNATES
| ALTERNATES |
| COST/SF |
| TOTAL |
| 01 |
| ADDITIONAL CORRIDOR DOORS |
| 02 |
| FUTURE TENANT ROUGH SHELL |
| 03 |
| REPLACE DAMPERS 6TH FL & 7TH FLOORS |
| 04 |
| DUCT REPLACEMENT UNIT PRICE |
TOTAL BID OPTIONS
MASTER SUMMARY - BASE DETAILED
| SECTION |
| QUAN. |
| UNIT |
| COST |
| TOTAL |
| 01 |
| GENERAL CONDITIONS |
Administrative Requirements
General Conditions Other
| 02 |
| EXISTING CONDITIONS |
Demolition
Hazardous Materials Abatement
Existing Conditions Other
| 03 |
| CONCRETE |
Concrete Patch & Repair
Concrete Cutting & Boring
Concrete Other
| 04 |
| MASONRY |
CMU Wall
Masonry Other
| 05 |
| METALS |
Structural Metal Framing & Reinforcement
Metal Joists
Metal Decking
Metal Fabrications
Metals Other
| 06 |
| WOOD & PLASTICS |
Rough Carpentry
Finish Carpentry
Architectural Woodwork
Plastic Fabrications
Wood & Plastic Other
| 07 |
| THERMAL & MOISTURE PROTECTION |
Vapor Barrier
Damproofing & Waterproofing
Fire & Smoke Protection
Joint Protection
Thermal & Moisture Protection Other
| 08 |
| DOORS & WINDOWS |
Doors & Frames
Entrances, Storefronts & Curtain Walls
Windows
Hardware
Glazing
Doors & Windows Other
| 09 |
| FINISHES |
Mtl. Stud Framing and Furring
Plaster & Gypsum Board
Tiling
Ceilings
Flooring
Base
Wall FinisheS
Acoustic Treatment
Painting & Coating
Finishes Other
| 10 |
| SPECIALTIES |
Building Signage
Toilet Partitions
Bath Accessories
Fire Extinguisher w/ Cabinet
Planter Boxes, Plantings w/ Irrigation & Lining/Green Wall
Hanging Wall System
DIRTT Fabricated Materials & Installation Total
Specialties Other
| 11 |
| EQUIPMENT |
Projection Screen
Building Equipment Misc. i.e Corner Guards, Appliances
Equipment Other
| 12 |
| FURNISHINGS |
Roller Window Shades, Motorized
Furnishings Other
| 21 |
| FIRE SUPPRESSION |
Fire Sprinkler System Clean Agent-Scanning & Basement
Fire Sprinkler System
Fire Suppression Other
| 22 |
| PLUMBING |
Plumbing Piping and Pumps
Plumbing Equipment
Plumbing Fixtures
Plumbing Other
| 23 |
| HEATING, VENTILATING & AIR CONDITIONING (HVAC) |
Ductwork, Insulation, & Devices
Grilles, Registers & Diffusers
Fire/Smoke Dampers
HVAC Air Devices
HVAC Equipment
HVAC Control System
HVAC Test & Balance
HVAC Other
| 26 |
| ELECTRICAL |
Electrical Service Rough In, Distribution Panel
Electrical Distribution Low-Volt
Electrical Distribution Medium-Volt
Lighting
Electrical Devices
Cable Tray System
Feeder & Branch Circuitry
Lighting Control System
Electrical Specialties
Electrical Other
| 27 |
| COMMUNICATIONS |
Telecom/Data System
Structured Cabling
Audio Visual System
Sound Masking System
Communications Other
| 28 |
| ELECTRONIC SAFETY & SECURITY |
Security / Card Reader
Fire Alarm System
Electronic Safety & Security Other
SUB-TOTAL
| CONTRACTOR GENERAL CONDITIONS |
| % |
| CONTRACTOR BOND |
| % |
| CONTRACTOR OVERHEAD & PROFIT |
| % |
TOTAL CONSTRUCTION COST