GS-08-P-17-JF-C-0001_Attachment_C_-_Contract_Price_Sheet.docx

DOCX document 35 KB Posted

Attached to
Wallace F Bennett Consolidation Construction
Solicitation number
GS-08-P-17-JF-C-0001
Issued by

About this file

Attachment C - Contract Price Sheet

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK | SOLICITATION NUMBER: GS-08-P-17-JF-C-0001

USDA CONSOLIDATION PROJECT | WALLACE F. BENNETT FEDERAL BUILDING

CONTRACT PRICE SHEET

WALLACE F. BENNETT FEDERAL BUILDING

USDA CONSOLIDATION PROJECT | BID PACKAGE 2

PROJECT IDENTIFICATION:

BIDDING FIRM NAME:

PROJECT NAME
USDA CONSOLIDATION PROJECT | BID PACKAGE 2
SOLICITATION NUMBER
GS-08-P-17-JF-C-0001
BUILDING NAME
WALLACE F. BENNETT FEDERAL BUILDING
BUILDING ADDRESS
125 SOUTH STATE STREET, SALT LAKE CITY, UT

MASTER SUMMARY - BASE PROPOSAL

SECTION
COST/SF
TOTAL
01
GENERAL REQUIREMENTS
02
EXISTING CONDITIONS
03
CONCRETE
04
MASONRY
05
METALS
06
WOODS & PLASTICS
07
THERMAL & MOISTURE PROTECTION
08
DOORS & WINDOWS
09
FINISHES
10
SPECIALTIES
11
EQUIPMENT
12
FURNISHINGS
21
FIRE SUPPRESSION
22
PLUMBING
23
HEATING, VENTILATING, & AIR CONDITIONING
26
ELECTRICAL
27
COMMUNICATIONS
28
ELECTRONIC SAFETY & SECURITY

SUB-TOTAL (CONSTRUCTION)

CONTRACTOR GENERAL CONDITIONS
%
CONTRACTOR BOND
%
CONTRACTOR OVERHEAD & PROFIT
%

TOTAL CONSTRUCTION COST

MASTER SUMMARY - ALTERNATES

ALTERNATES
COST/SF
TOTAL
01
ADDITIONAL CORRIDOR DOORS
02
FUTURE TENANT ROUGH SHELL
03
REPLACE DAMPERS 6TH FL & 7TH FLOORS
04
DUCT REPLACEMENT UNIT PRICE

TOTAL BID OPTIONS

MASTER SUMMARY - BASE DETAILED

SECTION
QUAN.
UNIT
COST
TOTAL
01
GENERAL CONDITIONS

Administrative Requirements

General Conditions Other

02
EXISTING CONDITIONS

Demolition

Hazardous Materials Abatement

Existing Conditions Other

03
CONCRETE

Concrete Patch & Repair

Concrete Cutting & Boring

Concrete Other

04
MASONRY

CMU Wall

Masonry Other

05
METALS

Structural Metal Framing & Reinforcement

Metal Joists

Metal Decking

Metal Fabrications

Metals Other

06
WOOD & PLASTICS

Rough Carpentry

Finish Carpentry

Architectural Woodwork

Plastic Fabrications

Wood & Plastic Other

07
THERMAL & MOISTURE PROTECTION

Vapor Barrier

Damproofing & Waterproofing

Fire & Smoke Protection

Joint Protection

Thermal & Moisture Protection Other

08
DOORS & WINDOWS

Doors & Frames

Entrances, Storefronts & Curtain Walls

Windows

Hardware

Glazing

Doors & Windows Other

09
FINISHES

Mtl. Stud Framing and Furring

Plaster & Gypsum Board

Tiling

Ceilings

Flooring

Base

Wall FinisheS

Acoustic Treatment

Painting & Coating

Finishes Other

10
SPECIALTIES

Building Signage

Toilet Partitions

Bath Accessories

Fire Extinguisher w/ Cabinet

Planter Boxes, Plantings w/ Irrigation & Lining/Green Wall

Hanging Wall System

DIRTT Fabricated Materials & Installation Total

Specialties Other

11
EQUIPMENT

Projection Screen

Building Equipment Misc. i.e Corner Guards, Appliances

Equipment Other

12
FURNISHINGS

Roller Window Shades, Motorized

Furnishings Other

21
FIRE SUPPRESSION

Fire Sprinkler System Clean Agent-Scanning & Basement

Fire Sprinkler System

Fire Suppression Other

22
PLUMBING

Plumbing Piping and Pumps

Plumbing Equipment

Plumbing Fixtures

Plumbing Other

23
HEATING, VENTILATING & AIR CONDITIONING (HVAC)

Ductwork, Insulation, & Devices

Grilles, Registers & Diffusers

Fire/Smoke Dampers

HVAC Air Devices

HVAC Equipment

HVAC Control System

HVAC Test & Balance

HVAC Other

26
ELECTRICAL

Electrical Service Rough In, Distribution Panel

Electrical Distribution Low-Volt

Electrical Distribution Medium-Volt

Lighting

Electrical Devices

Cable Tray System

Feeder & Branch Circuitry

Lighting Control System

Electrical Specialties

Electrical Other

27
COMMUNICATIONS

Telecom/Data System

Structured Cabling

Audio Visual System

Sound Masking System

Communications Other

28
ELECTRONIC SAFETY & SECURITY

Security / Card Reader

Fire Alarm System

Electronic Safety & Security Other

SUB-TOTAL

CONTRACTOR GENERAL CONDITIONS
%
CONTRACTOR BOND
%
CONTRACTOR OVERHEAD & PROFIT
%

TOTAL CONSTRUCTION COST

image1.jpg

File details come from the government source that posted it. Updated .