Pembina ND - Project Requirements Amendment 5.20.2010.doc
DOC document 75 KB Posted
- Attached to
- RECOVERY- 1MW Wind Generator Federal contract opportunity
- Solicitation number
- GS-08P-10-JC-C-0023
About this file
Warranty Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Subpart Buy American Act.doc | DOC document | |
| 8 step Pembina wt process.pdf | ||
| Potential Turbine Location.PDF | ||
| Pembina ND - Project Requirements Amendment 5.25.2010.doc | DOC document | |
| Final CATEX Checklist Pembina POE 4_1_10.pdf | ||
| USFWS response.pdf | ||
| Pembina ND - Project Requirements Amendment Date Change 5.20.2010.doc | DOC document | |
| Pembina ND - Solicitation Q A Amendment 5.20.10.doc | DOC document | |
| Pembina Borning Test Layout 1994.pdf | ||
| Pembina ND - Project Requirements Amendment 5.13.2010.doc | DOC document | |
| SF 1442 Document.pdf | ||
| Pembina ND - Project Requirements.doc | DOC document | |
| Pembina ND-Attachment-Proposal Submission.doc | DOC document | |
| Pembina ND-Attachment-Proposal Submission.doc | DOC document | |
| Pembina ND - Project Requirements.doc | DOC document | |
| SF 1442.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOVERY – Request for Proposal Wind Turbine
GS-08P-10-JCC-0023
Land Port f Entry Border Station
Pembina, North Dakota RECOVERY- Request for Proposal Wind Turbine
GS-08P-10-JC-C-0023
Land Port of Entry Border Station
Pembina, North Dakota
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED
Do not remove this notice
Properly destroy documents when no longer needed
PROJECT OVERVIEW/STATEMENT OF WORK AND PROGRAM REQUIREMENTS
Amendment 5.20.2010 Request for Proposals Design/Builder
GS-08P-10-JC-C-0023
Project No: RND00056 RECOVERY – DESIGN AND CONSTRUCTION WIND TURBINE- LAND PORT OF ENTRY BORDER STATION - PEMBINA, NORTH DAKOTA Prepared by:
U.S. General Services Administration
Public Buildings Service
Rocky Mountain Region Denver, Colorado
With regard to the above listed project and the solicitation, the following items are hereby amended:
Section 3.3 Project Closeout Stage
Sub-section 3.3.1 Final Record Documents Warranties and Guarantees:
Submit specific warranties and guarantees, final certifications and similar documents upon `substantial completion and prior to final payment. As part of the system design a life of the turbine system Operations and Maintenance Service agreement shall be included in the proposal as an Option. O&M agreement shall include complete system equipment, inverters and other components, to maintain total system operation and warranty. Resulting in a Total System Warranty capable of meeting a minimum of 90% of the intended design output / capacity for a period of no less than 5 years, with three 5 years options resulting in a system warranty of 20 years. All warranties shall be signed by a Principal of the Contractor’s firm and sealed if a corporation.
Amendment Action:
Removal of the entire paragraph currently listed under Warranties and Guarantees.
The following statement is hereby incorporated into the solicitation:
The contractor shall provide a minimum two (2) year service contract warranty, including but not limited to maintenance, service, parts and labor.