Pembina ND - Project Requirements Amendment 5.20.2010.doc

DOC document 75 KB Posted

Attached to
RECOVERY- 1MW Wind Generator Federal contract opportunity
Solicitation number
GS-08P-10-JC-C-0023
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Warranty Information

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY- 1MW Wind Generator, newest first.
File Type Posted
Subpart Buy American Act.doc DOC document
8 step Pembina wt process.pdf PDF
Potential Turbine Location.PDF PDF
Pembina ND - Project Requirements Amendment 5.25.2010.doc DOC document
Final CATEX Checklist Pembina POE 4_1_10.pdf PDF
USFWS response.pdf PDF
Pembina ND - Project Requirements Amendment Date Change 5.20.2010.doc DOC document
Pembina ND - Solicitation Q A Amendment 5.20.10.doc DOC document
Pembina Borning Test Layout 1994.pdf PDF
Pembina ND - Project Requirements Amendment 5.13.2010.doc DOC document
SF 1442 Document.pdf PDF
Pembina ND - Project Requirements.doc DOC document
Pembina ND-Attachment-Proposal Submission.doc DOC document
Pembina ND-Attachment-Proposal Submission.doc DOC document
Pembina ND - Project Requirements.doc DOC document
SF 1442.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECOVERY – Request for Proposal Wind Turbine

GS-08P-10-JCC-0023

Land Port f Entry Border Station

Pembina, North Dakota RECOVERY- Request for Proposal Wind Turbine

GS-08P-10-JC-C-0023

Land Port of Entry Border Station

Pembina, North Dakota

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

PROJECT OVERVIEW/STATEMENT OF WORK AND PROGRAM REQUIREMENTS

Amendment 5.20.2010 Request for Proposals Design/Builder

GS-08P-10-JC-C-0023

Project No: RND00056 RECOVERY – DESIGN AND CONSTRUCTION WIND TURBINE- LAND PORT OF ENTRY BORDER STATION - PEMBINA, NORTH DAKOTA Prepared by:

U.S. General Services Administration

Public Buildings Service

Rocky Mountain Region Denver, Colorado

With regard to the above listed project and the solicitation, the following items are hereby amended:

Section 3.3 Project Closeout Stage

Sub-section 3.3.1 Final Record Documents Warranties and Guarantees:

Submit specific warranties and guarantees, final certifications and similar documents upon `substantial completion and prior to final payment. As part of the system design a life of the turbine system Operations and Maintenance Service agreement shall be included in the proposal as an Option. O&M agreement shall include complete system equipment, inverters and other components, to maintain total system operation and warranty. Resulting in a Total System Warranty capable of meeting a minimum of 90% of the intended design output / capacity for a period of no less than 5 years, with three 5 years options resulting in a system warranty of 20 years. All warranties shall be signed by a Principal of the Contractor’s firm and sealed if a corporation.

Amendment Action:

Removal of the entire paragraph currently listed under Warranties and Guarantees.

The following statement is hereby incorporated into the solicitation:

The contractor shall provide a minimum two (2) year service contract warranty, including but not limited to maintenance, service, parts and labor.