Pembina ND - Project Requirements Amendment 5.13.2010.doc

DOC document 76 KB Posted

Attached to
RECOVERY- 1MW Wind Generator Federal contract opportunity
Solicitation number
GS-08P-10-JC-C-0023
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Project Requirement Amendments

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY- 1MW Wind Generator, newest first.
File Type Posted
Subpart Buy American Act.doc DOC document
USFWS response.pdf PDF
8 step Pembina wt process.pdf PDF
Potential Turbine Location.PDF PDF
Pembina ND - Project Requirements Amendment 5.25.2010.doc DOC document
Final CATEX Checklist Pembina POE 4_1_10.pdf PDF
Pembina ND - Project Requirements Amendment 5.20.2010.doc DOC document
Pembina ND - Project Requirements Amendment Date Change 5.20.2010.doc DOC document
Pembina ND - Solicitation Q A Amendment 5.20.10.doc DOC document
Pembina Borning Test Layout 1994.pdf PDF
Pembina ND-Attachment-Proposal Submission.doc DOC document
SF 1442 Document.pdf PDF
Pembina ND - Project Requirements.doc DOC document
Pembina ND-Attachment-Proposal Submission.doc DOC document
Pembina ND - Project Requirements.doc DOC document
SF 1442.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECOVERY – Request for Proposal Wind Turbine

GS-08P-10-JCC-0023

Land Port f Entry Border Station

Pembina, North Dakota RECOVERY- Request for Proposal Wind Turbine

GS-08P-10-JC-C-0023

Land Port of Entry Border Station

Pembina, North Dakota

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

PROJECT OVERVIEW/STATEMENT OF WORK AND PROGRAM REQUIREMENTS

Amendment 5.13.2010 Request for Proposals Design/Builder

GS-08P-10-JC-C-0023

Project No: RND00056 RECOVERY – DESIGN AND CONSTRUCTION WIND TURBINE- LAND PORT OF ENTRY BORDER STATION - PEMBINA, NORTH DAKOTA Prepared by:

U.S. General Services Administration

Public Buildings Service

Rocky Mountain Region Denver, Colorado

With regard to the above listed project, the solicitation and the following items are hereby amended:

APPENDIX A

DESIGN/BUILD PROGRAM OF REQUIREMENTS

B. SCOPE OF DESIGN WORK:

2. Design Guidelines

· Bullet Point #6:

Ability for the LPOE to operate at minimum mission capacity independently of Otter Tail Power in the event of catastrophic and commercial power loss.

Amendment Action: The above listed bullet point has been removed from the solicitation package entirely.

APPENDIX A

DESIGN/BUILD PROGRAM OF REQUIREMENTS

G.

ACCESS/SERVICE ROADWAY:

Service Roadway:

Construct a service/access roadway from the existing state highway to the wind turbine pad location. The roadway shall be approximately 900-feet in length by 20-feet in width. The roadway area will be over-excavated 5-feet and constructed with geo-grid and gravel surfacing. The roadway will be constructed of both fine and coarse aggregate. Roadway shall be designed and constructed to safely and adequately support the trucks, cranes and other equipment necessary to erect and maintain a 1-MW wind turbine on the wind turbine pad.

Amendment Action: The approximate length of the roadway has been changed from 2640 feet to 900 feet.

File details come from the government source that posted it. Updated .