Amendment 0003 provides the minutes from the Site Visit of June 10 2009 a list of attendees at the site visit and Questions and Answers as a result of the Site Visit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0004.pdf | ||
| SF 30 0004.pdf | ||
| 0002 SF 30.pdf | ||
| Proposal Template for Contractors.xls | XLS spreadsheet | |
| Final Solicitation.pdf | ||
| 0001.pdf | ||
| Request for Sensitive but Unclassified Building.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED
(SEE
ITEM
11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Solicitation GS-08P-09-JA-C-0043 Amendment 0003
1. The purpose of this amendment is to provide the documents listed below and to include two additional drawings in Solicitation Attachment (1) for reference:
A. Minutes from Site Visit and Pre-proposal conference of June 10, 2009 are included as Attachment (1) to Amendment 0003.
B. List of Attendees at Site Visit of June 10, 2009 are included as Attachment (2) to Amendment 0003.
C. Responses to Questions submitted subsequent to the Site Visit on June 10, 2009 through June 15, 2009 are included as Attachment (3) to Amendment 0003.
D. Figure 4-1(a) is incorporated into Attachment (1) of the solicitation.
E. Figure 4-1(b) is incorporated into Attachment (1) of the solicitation.
2. The additional drawings will be provided electronically as “.pdf” files to individual contractors which have provided Sensitive But Unclassified building Information Requests (SBU) to Beverly Carey, Contract Specialist. Contractors in attendance at the Site Visit on June 10, 2009 will receive an electronic copy of the to-scale drawings, to be confirmed upon receipt.
3. Remove Page 35 of 56 and replace with the attached Replacement page 35 of 56.
4. As a result of this amendment, Block 13a. of the Standard Form 1442 is revised as follows:
From: “Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM MT local time JUL 06, 2009…”
To: “Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM MT local time JUL 08, 2009…”
Solicitation GS-08P-09-JA-0043
Attachment (3) to Amendment 0003
Solicitation GS-08P-09-JA-C-0043 ACM Removal and Demolition, Building 53, Denver Federal Center, Lakewood, Colorado
Questions and Answers received through June 15, 2009
1. Question: In the specifications, it states the GSA is contracting the IH for air clearances.
Then the Scope states the abatement contractor, to run the air clearances as TEM on class 1 & II asbestos removal. Who is hiring the IH-independent and what is the clearance criteria for clearances and perimeter is the air monitoring protocol.
Answer: GSA will be hiring the Government Independent Consultant (GIC). Please review XXVII: Project Monitoring, Section D Air Sampling and Analytical Methodology for clearance criteria and protocol.
2. Question: Is Linoleum in the new areas, is it floor tile?
Answer: Please review the Attachment (1) Figures 2.1.1, 2.2.1, 2.9.1 for floor tile locations for abatement. No floor tile or linoleum will be replaced under this project scope.
3. Question: Will this job have to be bonded 100% or can we go in stages according to the project phases.
Answer: The job must be funded at 100%.
In accordance with Federal Acquisition Regulation (FAR) 52.228-15 Performance and Payment Bonds—Construction:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
4. Question: Please advise what size drawings need to be blown up to that will make the scale shown accurate so we can get accurate measurements.
Answer: In order to get the proper scale, the drawings provided are to be printed on an 11”x17” paper size.
5. Question: Can we get full size drawings to scale to perform a take off since walk thru time was less than 1 hr inside the building?
Answer: Posted as part of Amendment 0002 on 06/12/2009. All individuals who submitted the required Sensitive but Unclassified Building Information Request (SBU) received the drawings.
http://www.arnet.gov/far/current/html/FormsStandard4.html#wp1176615 http://www.arnet.gov/far/current/html/FormsStandard5.html#wp1176623
6. Question: Can we get a "legend" indication on the drawing as to SOW requirements such as floor tile, wall board, duct, door removal , etc.?
Answer: Posted as part of Amendment 0002 on 06/12/2009. All individuals who submitted the required Sensitive But Unclassified Building Information Request (SBU) received the drawings.
7. Question: Is there a summary available of quantities of various types of materials such as door frames, floor tile and mastic, sheetrock or plaster type wall materials? Or are drawings available that note these types of materials by room location?
Answer: Yes. A summary is provided in Attachment (6) Asbestos Inspection Report Building Number 53, and Attachment (1), Drawings.
8. Question: The Manager who started the actual tour inside the building said to note raised floors from computer area. How many sq ft of raised flooring must be removed by us as it was not on drawings or pointed out during tour.
Answer: The entire floor in Room B1205 on the First Floor has raised flooring that needs to be removed in order to abate the floor tiles. Contractors are responsible for all quantity takeoffs.
9. Question: Some rooms had carpeting- can we get a list of rooms and sq footage of carpeting that's over floor tile to be removed since their is not another tour of the building planned for further measuring?
Answer: Contractors are responsible for all quantity takeoffs. The following rooms have carpet on top of the floor tile: B- 1102, 1202, 1204, 1206, 1208, 1101, 1102, 1302, 1401- 1406, 1408, 1410, 1412, 1414, 1415, 1416, 1502-1504, 2101, 2102, 2104, 2105, 2105, 2203- 2205, 2207, 2211, 2213, 2214, 2215, 2217, 2301-2304, 2401, 2403, 2405, 2407, 2411, 2413, 2415, 2503, 2507; D- 2000, 2103, 2701, 2703, 2705, 2707, 2709, 2712, 2713, 2715.
10. Question: Some areas of two layers of floor tile were noted. i.e. one layer over another layer? is the amount of floor tile with double layers indicated or known? If so please advise- If not how do you desire us to bid for the additional layer or should it be a change order after job is awarded and top layer is removed showing the second layer?
Answer: Room D- 2204 is the only room noted as having a double layer of floor tile. For reference only, this room is estimated to contain 120 Square Feet of double layer tile.
11. Question: Some walls along the hallways were noted to have two layers of sheet rock or wall board material as well. Again is the amount known or how do we handle the additional costs for labor and disposal of the second layer.?
Answer: Hallway 02000 has one section of one wall, approximately 25’ long, with a double layer of drywall. No other areas are noted as having double layered drywall.
Attachment (3)
12. Question: Is the sign in attendance sheet from the job walk going to be sent to all bidders?
Answer: Included in this amendment.
13. Question: Can the time the proposal is due be extended somewhat to get past the holiday without having to assemble this proposal over the holiday and allow additional time to obtain required sub contractor bids for things like air testing, trucking, disposal roll offs and disposal costs or perhaps additional time to re measure and re walk after receipt of scaled drawings with the legend indicated?
Answer: As part of this Amendment, proposals will be due July 8, 2009.
14. Question: What are the exact working days and hours?
Answer: The scope of work documentation states on Page 24 of 56 under Section 00800.9, IX: Contractor Use of Premises that the working hours are 7am to 5pm.
15. Question: Is it correct GSA will provide all background air testing prior to mobilization as well as all required final clearance visual inspections and air testing?
Answer: Yes. Please see Section 00800.9 XXVII: Project Monitoring Section C.
16. Question: Is it correct fireproofing that may be on ceiling is negative for asbestos in all work areas?
Answer: All spray on fire protection is to be left in place. It is negative for ACM. Please refer to drawings 2.1.4, 2.2.4, and 2.9.4 for reference.
17. Question: Who removes light fixtures and bulbs and ballasts from suspended ceiling grid?
Who disposes of the light tubes and ballasts?
Answer: Any light fixtures left in place shall be removed and disposed of in accordance with all codes and regulations. Contractor shall leave one quarter of the lights in place for temporary lighting for future work.
18. Question: Are there any drawings that show the number of lights presently installed to get a accurate count of light fixtures to be dealt with?
Answer: See Figures 1.1, 1.2, 1.9 (Lighting Count) for the locations and counts of fixtures. All the florescent fixture counts shown on the figures are to be removed and disposed of following Local, State and Federal Regulations. Fixture types and counts:
-1’ x 4’ Florescent, 2 bulb (shown in yellow on the aforementioned figures)= 907 fixtures -2’ x 4’ Florescent, 3 bulb (shown in orange on the aforementioned figures)= 124 fixtures -2’ x 4’ Florescent, 4 bulb (shown in green on the aforementioned figures)= 28 fixtures
19. Question: Is the gypsum wall board to be removed all class Two work with no texture containing asbestos on the outside? Only in the joint compound?
Answer: Please refer to Attachment (6) Asbestos Inspection Report Building Number 53.
20. Question: Are any drawings again to scale - available that show glass wastewater piping and mechanical supply and return duct to be removed?
Please see Figure 4-1a and 4-1b (included with this amendment) for to-scale drawings of the piping. This drawing is to scale when printed on 11”x17” paper. Roof penetrations, (other than vent lines), shall be removed, and return the roof to original state. All roofing work must be coordinated with GSA Roofing Specialist Charly Brown and completed by United Roofing:
Paul Rouse, paul@unitedmtls.net.
21. Question: Bonding for contractor selected is noted Is it correct no bid bond must be submitted with bid?
Answer: It is correct that no bid bond is required to be submitted with the proposal. However, in accordance with Federal Acquisition Regulation (FAR) 28.102-1(a), bonding is required after award, because this requirement will be filled as a construction contract. FAR 28.102- 1(a) requires performance and payment bonds for any construction contract exceeding $100,000. Additionally, FAR 28.102-3 Contract Clauses requires the inclusion of FAR 52.228- 15, Performance and Payment Bonds – Construction “in solicitations and contracts for construction…if the resultant contract is expected to exceed $100,000.” Last, Blocks 12(a) and (b) indicate that Performance and Payment bonds shall be provided within 10 calendar days of award.
For reference purposes, FAR 52.228-15, Performance and Payment bonds – Construction is included in the solicitation by reference. It reads as follows:
Performance and Payment Bonds—Construction (Nov 2006)
(a) Definitions. As used in this clause— “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $100,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
http://www.arnet.gov/far/current/html/Subpart 28_1.html#wp1086421 http://www.arnet.gov/far/current/html/FormsStandard4.html#wp1176615 http://www.arnet.gov/far/current/html/FormsStandard5.html#wp1176623
(c) Furnishing executed bonds. The contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashiers’ check, irrevocable letter of credit, or in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Department regulations, certain bonds or notes of the United States.
Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570.
(e) notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract
(End of Clause)
22. Question: Please advise how passes will be available at gate for employees assigned to abatement and or demo work. Any Costs? and requirements on type of individual regarding their background or what type of security investigation must the typical employee pass?
Answer: There are no costs associated with the background checks that the contractor pays.
However, each employee must take the time to fill out the online questionnaire in its entirety in order to become cleared and badged for work.
23. Question: On Removal and disposal of black iron gas piping instructions say to include in quote a recycle credit to the government. Please advise what type of credit is expected as normally recycling of steel by demo company proceeds are used to pay part of costs of trucking and loading the steel pipe material?
Answer: Please show the expected credit as a specific line item in the Bid Form provided.
This credit will offset the removal and/or trucking costs at the bottom line price.
24. Question: Item VII. Proposal pricing on page 23 of 56 shows forms in section 00800, attachment 5 to be filled out to breakdown prices A quick review of the Bid Format form has CSI Numbers of items that are really not applicable to this job for abatement and or demo.
For example items listed included Concrete, Masonry, Wood Plastics and Composites, thermal and Moisture Protection, openings , finishes and specialties, fire suppression, plumbing, exterior improvements, earthwork, electronic security, havc and electrical which are not all applicable to this type of work for abatement and demolition. Can you provide a revised form for us to fill out specific to abatement and demo that you desire us to breakdown? the form should come from you folks to everyone so everyone submits the breakdown on a apples to apples basis we assume??
http://www.fms.treas.gov/c570
Answer: The Proposal Pricing Form is to ensure equitable comparison of all submitted proposals. GSA will not remove any of the CSI numbers. If a CSI Division does not apply to your proposal, please place an N/A or Numerical Zero (0) in the box. In the CSI numbers that do apply, please remember to type in your own description of the pricing so we know what you are including.
25. Question: Is there to be a specific location for dumpsters, supplies and equipment storage?
Answer: Per Section XXII: Material Removal, these locations will be coordinated with GSA Building Management, Project COR and Environmental Program Group.
26. Question: Will the fire suppression/detection system be deactivated by the Abatement contractor or GSA?
Answer: GSA has not specified anywhere in the SOW that the fire suppression system was to be tampered with. It is not part of the demolition. If the detection system has any smoke sensors in the space dust covers should be used prevent false alarms. If it is found that the system needs to be taken off-line for any reason, the outage would be coordinated with GSA Building Management 72 hours prior to the outage.
Section 00800 Special Contract Requirements Page 35 of 56, Replacement Page
00800.15. ATTACHMENTS
(1) Drawings: Drawings will be provided at the Site Visit on June 10, 2009. Each offeror submitting a completed Request for Sensitive but Unclassified Building Document will receive a set a of drawings. The legend for the Figures is as follows:
Green- Gypsum wall board walls up to drop ceiling Red- Bathroom partitions and fixtures Orange- Masonry and metal Yellow- Full height gypsum board walls
Figure 1.1.
Figure 1.2
Figure 1.9
Figure 2.1.1 Figure 2.1.2 Figure 2.1.3 Figure 2.1.4 Figure 2.1.5 Figure 2.2.1 Figure 2.2.1 Figure 2.2.2 Figure 2.2.3 Figure 2.2.4 Figure 2.2.5 Figure 2.9.1 Figure 2.9.2 Figure 2.9.3 Figure 2.9.4 Figure 2.9.5 Figure 4.1(a) Figure 4.1(b)
(2) Request for Sensitive But Unclassified Building Document
(3) Disposal Statement
(4) Environmental Procedures
(5) Electronic Excel Proposal Preparation Spreadsheet
(6) Asbestos Inspection Report Building Number 53
| IDCode: |
| EffDate: JUN 22, 2009 |
| ReqNo: 8PD-09-0293 |
| ProjNo: |
| IssuedBy: GSA PBS DFC SVS CTR 8PD |
BLDG 41 DFC PO BOX 25546
W 6TH AVE & KIPLING ST
DENVER CO 80225-0546
| AdminBy: See Block 6 |
| NoCopies: 1 |
| Amended: Yes |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: See Page 2 for Description. |
| SignName: |
| SignTitl: |
| ContDate: |
| CODate: |
| OffrExt: Yes |
| OffrNoEx: Off |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| ContractorCode: |
| FacCode: |
| ContractorPOC: |
| AwdChg: Off |
| SolChg: Yes |
| SolNo: GS-08P-09-JA-C-0043 |
| SolDate: JUN 03, 2009 |
| AwdNo: |
| IssuedByCode: 8PD |
| AdminByCode: |
| ContrOfficerInfo: |
| DocNo: 0003 |
| AwdDate: |
| text1: 10B. DATED (SEE ITEM 13) |
| block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) |
| pageblock: PAGE OF PAGES |
| block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| Contractor: |
| ContratorInfo: |
| ModAmount: |
| block12: 12. ACCOUNTING AND APPROPIATION DATA (If required) |
| ApprData: See Schedule |
| Pages: 1 |
| Page: 1 |
File details come from the government source that posted it. Updated .