0002 SF 30.pdf

PDF 519 KB Posted

Attached to
Building 53 Asbestos Containing Material Removal and Space Demolition
Solicitation number
GS-08P-09-JA-C-0043
Issued by

About this file

Amendment 0002 - Clarifies existing drawings incorporates additional drawings revises Davis Bacon Wage Determination

View the file

Other files

File Type Posted
0004.pdf PDF
SF 30 0004.pdf PDF
0003.pdf PDF
Proposal Template for Contractors.xls XLS spreadsheet
Final Solicitation.pdf PDF
0001.pdf PDF
Request for Sensitive but Unclassified Building.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Solicitation GS-08P-09-JA-C-0043 Amendment 0002

1. The purpose of this Amendment is to provide revised drawings and incorporate additional drawings into the solicitation, clarify the Figures’ Legend and to incorporate the revised Davis Bacon Wage Determination dated June 5, 2009.

2. Attachment (1), Drawing (A) is revised to show the scale and is re-named Figure 1.1.

3. Attachment (1), Drawing (B) is revised to show the scale and is re-named Figure 1.2.

4. Attachment (1), Drawing (C) is revised to show the scale and is re-named Figure 1.9.

5. Figure 2.1.1 is incorporated into Attachment (1).

6. Figure 2.1.2 is incorporated into Attachment (1).

7. Figure 2.1.3 is incorporated into Attachment (1).

8. Figure 2.1.4 is incorporated into Attachment (1).

9. Figure 2.1.5 is incorporated into Attachment (1).

10. Figure 2.2.1 is incorporated into Attachment (1).

11. Figure 2.2.2 is incorporated into Attachment (1).

12. Figure 2.2.3 is incorporated into Attachment (1).

13. Figure 2.2.4 is incorporated into Attachment (1).

14. Figure 2.2.5 is incorporated into Attachment (1).

15. Figure 2.9.1 is incorporated into Attachment (1).

16. Figure 2.9.2 is incorporated into Attachment (1).

17. Figure 2.9.3 is incorporated into Attachment (1).

18. Figure 2.9.4 is incorporated into Attachment (1).

19. Figure 2.9.5 is incorporated into Attachment (1).

20. The legend for the Figures is as follows:

Green- Gypsum wall board walls up to drop ceiling Red- Bathroom partitions and fixtures Orange- Masonry and metal

Yellow- Full height gypsum board walls

21. Remove Pages 35 and 37 of 56 and replace with the attached Replacement Pages 35 and 37 of 56.

22. The drawings will be provided electronically as “.pdf” files to individual contractors which have provided Sensitive But Unclassified Building Information Requests (SBU) to Beverly Carey, Contract Specialist. Contractors in attendance at the Site Visit on June 10, 2009 will receive an electronic copy of the to-scale drawing, to be confirmed upon receipt.

23. If a Contractor did not attend the site visit, but wishes to receive the drawings, the Contractor must provide completed SBU to Beverly Carey at beverly.carey@gsa.gov.

Electronic copies will be provided upon receipt of a completed SBU.

24. Section 00800.8. Davis Bacon Wage Determination is revised as follows:

Remove Solicitation Pages 17 through 21 of 56.

Replace with the attached replacement Pages 18 through 21 of 56.

mailto:beverly.carey@gsa.gov

Section 00800 Special Contract Requirements Page 35 of 56, Replacement Page

00800.15. ATTACHMENTS

(1) Drawings: Drawings will be provided at the Site Visit on June 10, 2009. Each offeror submitting a completed Request for Sensitive but Unclassified Building Document will receive a set a of drawings. The legend for the Figures is as follows:

Green- Gypsum wall board walls up to drop ceiling Red- Bathroom partitions and fixtures Orange- Masonry and metal Yellow- Full height gypsum board walls

Figure 1.1.

Figure 1.2

Figure 1.9

Figure 2.1.1 Figure 2.1.2 Figure 2.1.3 Figure 2.1.4 Figure 2.1.5 Figure 2.2.1 Figure 2.2.1 Figure 2.2.2 Figure 2.2.3 Figure 2.2.4 Figure 2.2.5 Figure 2.9.1 Figure 2.9.2 Figure 2.9.3 Figure 2.9.4 Figure 2.9.5

(2) Request for Sensitive But Unclassified Building Document

(3) Disposal Statement

(4) Environmental Procedures

(5) Electronic Excel Proposal Preparation Spreadsheet

(6) Asbestos Inspection Report Building Number 53

Page 37 of 56, Replacement Page

Attachment (2)

REQUEST FOR SENSITIVE BUT UNCLASSIFIED BUILDING (SBU) INFORMATION

Attachment(s) Figure 1.1, Figure 1.2, Figure 1.9, Figure 2.1.1, Figure 2.1.2, Figure 2.1.3, Figure 2.1.4, Figure 2.1.5, Figure 2.2.1, Figure 2.2.1, Figure 2.2.1, Figure 2.2.2, Figure 2.2.3, Figure 2.2.4, Figure 2.2.5, Figure 2.9.1, Figure 2.9.2, Figure 2.9.3, Figure 2.9.4, Figure 2.9.5

Solicitation/Contract No. __GS-08P-09-JA-C-0043______________________________

DOCUMENT SECURITY AGREEMENT

NOTICE TO PROSPECTIVE BIDDERS/OFFERORS

This solicitation/contract includes Sensitive but Unclassified (SBU) building information. SBU information provided under this solicitation/contract is intended for use by authorized users only.

In support of this requirement, General Services Administration (GSA) requires bidders/offerors/contractors to exercise reasonable care when handling SBU building information per the solicitation. To receive SBU building information related to this solicitation/contract, please provide the information requested herein and execute the agreement.

Valid identification for non-Government users. Non-Government users shall provide valid identification/information to receive SBU building information. The identification/information shall be presented and verified for each dissemination of SBU information and shall include items stated in (1. a.) through (1. d.).

(a) A copy of a valid business license, articles or certification of formation, or other documentation granted by the state or local jurisdiction to conduct business. The license or other documentation at a minimum shall provide the name, address, phone number of the company, state of formation, and the name of the individual legally authorized to act for the company. If a business license or other documentation is not available from the jurisdiction, a statement testified to by the submitter shall be provided; and

(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and

(c) A valid Employer ID Number/Federal Tax ID Number of the company requesting the information; and,

(d) A valid picture state driver's license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not supplied the documentation required by this Agreement.

http://www.fpdc.gov/

Page 17 of 56, Replacement Page

00800.8. Davis Bacon Wage Determination

GENERAL DECISION: CO20080007 06/05/2009 CO7

Date: June 5, 2009 General Decision Number: CO20080007 06/05/2009

Superseded General Decision Number: CO20070007

State: Colorado

Construction Type: Building

Counties: Jefferson and Mesa Counties in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/04/2008 3 05/02/2008 4 07/04/2008 5 08/15/2008 6 09/05/2008 7 10/03/2008 8 10/24/2008 9 12/05/2008 10 01/02/2009 11 04/03/2009 12 05/01/2009 13 06/05/2009

BRCO0007-008 01/01/2009

JEFFERSON COUNTY

Rates Fringes

BRICKLAYER.......................$ 22.95 9.07

CARP9901-005 05/01/2008

Rates Fringes

CARPENTER

All Other Work..............$ 25.75 8.49

* ELEC0068-006 06/01/2009

Page 18 of 56, Replacement Page

JEFFERSON COUNTY

Rates Fringes

ELECTRICIAN

(Including Low Voltage Wiring and Installation of Fire Alarms, Telephones, Communications Systems and Temperature Controls).......$ 31.00 11.40

ELEC0969-004 06/01/2007

MESA COUNTY

Rates Fringes

ELECTRICIAN

(Including Low Voltage Wiring and Installation of Fire Alarms, Telephones, Communications Systems and Temperature Controls)...................$ 20.31 8.56

ELEV0025-002 01/01/2009

Rates Fringes

Elevator Constructor.............$ 35.71 18.285

FOOTNOTE:

a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit.

PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day.

IRON0024-001 11/01/2008

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 24.80 8.86

LABO0720-002 05/01/2003

Rates Fringes

Laborers:

Brick Tender/Finisher.......$ 14.20 4.55

PAIN0079-003 12/02/2008

Page 19 of 56, Replacement Page

PAINTER

(Excluding Drywall

Finishing/Taping)

Brush and Roller............$ 17.99 5.59 Spray.......................$ 18.99 5.59

PAIN0930-001 07/01/2008

Rates Fringes

GLAZIER..........................$ 27.55 6.75

PLAS0577-001 05/01/2007

Rates Fringes

Cement Mason/Concrete Finisher...$ 23.80 8.25

PLUM0003-007 08/02/2008

JEFFERSON COUNTY

Rates Fringes

PLUMBER

(Excluding HVAC work).......$ 33.02 10.20

PLUM0145-003 05/01/2008

MESA COUNTY

Rates Fringes

PLUMBER

(Excluding HVAC work) &

PIPEFITTER (Including

HVAC pipe)..................$ 23.90 9.10

PLUM0208-006 06/01/2008

JEFFERSON COUNTY

Rates Fringes

PIPEFITTER

(Including HVAC pipe).......$ 32.95 10.27

SHEE0009-001 07/01/2008

Page 20 of 56, Replacement Page

Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 29.30 11.32

SUCO2001-017 12/20/2001

Rates Fringes

Carpenters:

Acoustical, Drywall Hanging/ Framing and Metal Studs.................$ 15.95 1.31 Formbuilding/Formsetting....$ 17.55 3.70

Drywall Finisher/Taper...........$ 14.43

Laborer, common..................$ 10.40 2.62

Mechanical Insulator/Asbestos Worker (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 12.05 .48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

Page 21 of 56, Replacement Page

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

IDCode:
EffDate: JUN 12, 2009
ReqNo: 8PD-09-0293
ProjNo:
IssuedBy: GSA PBS DFC SVS CTR 8PD

BLDG 41 DFC PO BOX 25546

W 6TH AVE & KIPLING ST

DENVER CO 80225-0546

AdminBy: See Block 6
NoCopies: 1
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: Building 53 ACM Removal and Demolition, Denver Federal Center, Lakewood, Colorado

See page 2 for description.

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-08P-09-JA-C-0043
SolDate: JUN 03, 2009
AwdNo:
IssuedByCode: 8PD
AdminByCode:
ContrOfficerInfo:
DocNo: 0002
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 10
Page: 1

File details come from the government source that posted it. Updated .