Amendment_002.pdf

PDF 834 KB Posted

Attached to
DEA Lab Upgrade
Solicitation number
GS-05-P-16-FB-C-7002
Issued by

About this file

Amendment 002

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Neal Deodhar

SEE PAGE 2 FOR AMENDMENT DESCRIPTION.

R5 AMD Customer Projects Contracting Team 230 S. Dearborn, Room 3300 Chicago, IL. 60604

See box 6.

GS05P16FBC7002

03/07/2016

02/10/2016

DEA Labs Upgrade PBS Region 5

536 S. Clark St. GS05P16FBC7002

Chicago, IL

14. DESCRIPTION OF AMENDMENT/MODIFICATION

Amendment #002 is issued to make the following changes:

1.) The attached Questions and Answers are incorporated. The Answers provided in the attached supersede any inconsistent provisions contained in the solicitation, including the specifications and drawings.

2.) Specification Section 23 7328 Factory Fabricated Custom Air Handling Units.

Paragraph 2.1, Item B. Add the words “Engineered Air” after the words “Climate

Craft”.

3.) Delete paragraph 2.15 and 3.14 from spec 232116 Pipe and Piping Fittings.

4.) Refer to revisions on sheet MH 502, reissued with this amendment.

5.) The due date for receipt of proposals is extended to Tuesday, March 15, 2016, at 2

PM (Central Time). Address proposals to:

Neal Deodhar

U.S. General Services Administration

Acquisition Management Division

John C. Kluczynski Federal Building

230 South Dearborn Street, Room 3300

Chicago, Illinois 60604

All other solicitation terms and conditions remain unchanged.

DEA Labs Upgrade PBS Region 5

QUESTIONS and ANSWERS

Question 1

Please provide contact information for the existing building fire alarm contractor

Fire Alarm System:

David Jackson

Affiliated Fire Systems, Inc

630-434-7900 djackson@affiliated.com www.affiliatedinc.com

Question 2

Please provide contact information for the existing building chemical treatment contractor. Will this contractor be acceptable as they are not listed in the mechanical specification?

Water Treatment:

Michael Byerly, Vice President

Global Water Technology, Inc.

708-349-9991

312-720-0887 (cell) mbyerley@gwt-inc.com www.gwt-inc.com

Yes they are acceptable.

Question 3

Glycol water piping is specified to be welded. It was noted during the pre-bid meeting that welding will not be permitted on the roof

Welding will not be permitted for galvanized structural steel. It will be allowed for glycol water piping provided roof protections and fire watch requirements are put in place.

tel:630-434-7900 mailto:djackson@affiliated.com http://www.affiliatedinc.com/ tel:708-349-9991 tel:312-720-0887 mailto:mbyerley@gwt-inc.com http://www.gwt-inc.com/

DEA Labs Upgrade PBS Region 5

Question 4

Will Victaulic fittings be permitted on the roof in lieu of welding?

No.

Question 5

Is the loading dock available for material and equipment deliveries after hours and on weekends?

Access to the dock after-hours can be coordinated on an as needed basis if it is outside of the normal dock hours (8PM-4PM). Delays should be expected.

Question 6

Does detail 6 on MH 5 01 infer that the existing louvers and bird screens are to be replaced?

The existing bird screen and louver are to remain.

Question 7

Does the existing exhaust ductwork contain any hazardous material or residue that needs to be removed or encapsulated prior to demolition or cleaning?

The existing ductwork has not been tested for hazardous materials.

Question 8

MH-5-03 detail 16 – there is a note that ¾” Rigid conduit with drains are required for instrument signal wiring. Please clarify if the low voltage control wiring can be ran in open plenum cable above accessible ceilings and in EMT conduit in mechanical rooms. Or if Rigid and/or EMT conduit is required for all temperature control wiring. Rigid would be used for outside applications. (I believe this was discussed at the pre-bid meeting, but I did not see a follow-up correspondence.)

DEA Labs Upgrade PBS Region 5

Per spec 230901.3.7.E: Low voltage wiring concealed above accessible ceilings does not require raceway. Run cable in EMT in mechanical rooms.

Question 9

230901-3 states that all new BAS controllers shall communicate Bacnet. The existing fume hood controllers remaining communicate using Siemens P1 protocol. It is not recommended to control the new supply/exhaust units serving areas with fume hoods through a different communication protocol. Is it acceptable if the controllers for the new supply/exhaust units

(serving areas with fume hoods) utilize Siemens P1 protocol for better operation? The AHU controllers will remain BACnet IP.

It is acceptable for the controllers for the new supply/exhaust units located on field level networks with fume hood controllers to utilize Siemens P1 protocol.

Question 10

I am under the impression that we are to fill out the questionnaires and supplemental forms as much as we can, then our references are to fill in the survey portion and email all pages to your attention. Is that correct ?

Fill out the section titled “Contract Identification,” The reference should fill out the rest of the form.

Question 11

Since our references are to submit their documentation directly to you via email, do we still include the blank versions of those forms with our bid or are we to have our references send that documentation to us as well for inclusion with our bid forms?

Forms must be received directly from the references. You may include a blank form (or one that is partially filled out) with your proposal but that is not mandatory.

Question 12

In regards to the Phased Projects that are to be turned in, is the Supplemental Information Form the only page required for Factor 3 (phased projects) or do we need to provide additional documentation with the Supplemental Information Form? I noticed that the Supplemental

DEA Labs Upgrade PBS Region 5

Information Form for phased projects does not include a section for a description of work, so I just wanted to clarify what you require.

Yes. Please include the description of work and any other information required on a separate page.

Question 13

Just to confirm, we are allowed to use a specific project for Factor 1 ($3M similar projects) and use that same specific project in Factor 2 (crane lifts) and/or Factor 3 (phased projects), correct?

My understanding is that we can’t double up on a project or reference within the same Factor.

Correct.

Question 14

Do you consider public/state-run high schools and universities governmental entities?

Yes.