170331_Package_4_Addendum_B_Drawing_list.pdf
PDF 67 KB Posted
- Attached to
- Contract 3 for a New Training Center in VA
- Solicitation number
- GS-03-P-17-AZ-C-0002
About this file
AMENDMENT 003 170331_Package 4_Addendum B_Drawing list
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Foreign Affairs Security Training Center General Services Administration / Department of State ADDENDUM B Package 4 – Construction Documents page 1 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
FOREIGN AFFAIRS SECURITY TRAINING CENTER
General Services Administration / U.S. Department of State Package 4 – CONSTRUCTION DOCUMENTS
ADDENDUM B
March 31, 2017
SUMMARY
This addendum collects revisions to the FASTC Package 4 Construction Documents. These revisions include:
(A) Added concrete entry pads at D03 training structures.
(B) Revisions to incorporate direction from VA DEQ resulting from stormwater and E&S permit review
(C) Revisions to incorporate Southside Electrical Cooperative requirements
(D) Revisions resulting from responses to bidder RFIs.
(E) Miscellaneous minor coordination items, graphic improvements.
Edits to previously issued specification sections are indicated in bold and/or underlined for additions / replacements and strikethrough for deletions. Revisions to previously issued drawing sheets are indicated with a revision cloud.
ATTACHMENTS:
The following items are attached and hereby made part of this Addendum.
1. Project Manual
a. 04 22 00 – Concrete Unit Masonry
b. 05 3100 – Steel Decking
c. 06 1600 – Sheathing
d. 07 2700 – Air Barriers
e. 07 4213 – Metal Wall Panels
f. 08 3300 – Coiling Doors and Grilles
g. 10 2239 – Folding Panel Partitions
h. 10 2813 – Toilet Accessories
i. 13 1502 - Ballistic Shooting Stall
j. 13 1510 - Rubber Berm Trap
k. 13 1520 - Wireless Turning Man Target Retriever System
l. 13 1525 - Running Man Target System
m. 13 1530 - Fixed Turning Target System
n. 13 1540 - Range Master Control System
o. 13 3419 – Metal Building Systems
p. 13 3420 – Metal Pedestrian Bridges
q. 13 3440 – Carports
r. 13 6000 – Explosives Storage Magazine
s. 23 0923 – Direct Digital Control (DDC) System for HVAC
t. 230993.11 – Sequence of Operations for HVAC DDC
u. 23 3713 – Diffuser Registers and Grilles
v. 23 8126 – Split-System Air-Conditioners
2. Drawings
a. Refer to List Below
PROJECT MANUAL: Comments and Clarifications
Package 4 – Construction Documents page 2 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
1 04 22 00 CONCRETE UNIT MASONRY MODIFY
2 05 3100 STEEL DECKING MODIFY
3 06 1600 SHEATHING MODIFY
4 07 2700 AIR BARRIERS ADD
5 07 4213 METAL WALL PANELS MODIFY
6 08 3300 COILING DOORS AND GRILLES MODIFY
7 10 2239 FOLDING PANEL PARTITIONS ADD
8 10 2813 TOILET ACCESSORIES MODIFY
9 13 3419 METAL BUILDING SYSTEMS MODIFY
10 13 3420 METAL PEDESTRIAN BRIDGES MODIFY
11 13 3440 CARPORTS ADD
12 13 6000 EXPLOSIVES STORAGE MAGAZINE ADD
13 23 0923 FL DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC ADD
14 230993.11 FL SEQUENCE OF OPERATIONS FOR HVAC DDC ADD
15 23 3713 DIFFUSER REGISTERS AND GRILLES MODIFY
16 23 8126 FL SPLIT-SYSTEM AIR-CONDITIONERS MODIFY
PACKAGE 4 DRAWINGS:
CIVIL DRAWINGS
1 C.00.5.02 SITE & UTILITY DETAILS MODIFY
2 C.00.5.05 SITE & UTILITY DETAILS MODIFY
3 C.00.5.15 SITE & UTILITY DETAILS MODIFY
4 C.00.6.05 STORM STRUCTURES TABLE MODIFY
5 C.00.6.06 SANITARY STRUCTURES TABLE MODIFY
6 C.00.6.07 ELECTRIC AND TELECOMMUNICATIONS STRUCTURES TABLE MODIFY
7 CG.03.1.09 EROSION & SEDIMENT CONTROL PLAN - PHASE 1 MODIFY
8 CG.03.1.10 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
9 CG.03.1.11 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
10 CG.03.1.12 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
11 CU.03.2.04 UTILITY PROFILES MODIFY
12 C.03.4.01 WET TRACK CISTERN AND BIORETENTION AREA PLAN MODIFY
13 C.03.4.03 BIORETENTION AREA PLAN MODIFY
Package 4 – Construction Documents page 3 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
14 CG.04.1.04 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
15 C.04.4.04 COMMUNICATION & ELECTRIC LAYOUT PLAN MODIFY
16 CG.06.1.07 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
17 CG.06.1.08 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
18 C.06.4.01 DRY POND & BIORETENTION AREA PLAN MODIFY
19 C.09.1.06 UTILITY PLAN MODIFY
20 CG.09.1.11 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
21 C.22.1.03 SITE, UTILITY & GRADING PLAN MODIFY
22 CP.22.1.07 RING ROAD PLAN & PROFILE STA 11+00 TO STA 18+00 MODIFY
23 CP.22.1.08 RING ROAD PLAN & PROFILE STA 18+00 TO STA 22+30 MODIFY
24 C.23.1.03 UTILITY & GRADING PLAN MODIFY
25 CS.23.1.04 SITE & LAYOUT PLAN MODIFY
26 CU.23.2.01 UTILITY PROFILES MODIFY
27 CU.23.2.03 UTILITY PROFILES MODIFY
28 CU.23.2.04 UTILITY PROFILES MODIFY
29 CU.23.2.05 UTILITY PROFILES MODIFY
30 CU.23.2.06 UTILITY PROFILES MODIFY
31 C.31.1.01 UTILITY, & GRADING PLAN MODIFY
32 C.31.1.02 UTILITY & GRADING PLAN MODIFY
33 CU.31.7.01 SEPTIC SYSTEM DESIGN PLAN & NOTES MODIFY
34 CU.31.7.02 SEPTIC SYSTEM DESIGN DETAILS MODIFY
35 C.32.1.03 UTILITY & GRADING PLAN MODIFY
36 C.33.1.01 UTILITY & GRADING PLAN MODIFY
37 CU.33.2.01 UTILITY PROFILES MODIFY
38 C.34.1.01 UTILITY & GRADING PLAN MODIFY
39 CU.34.2.01 UTILITY PROFILES MODIFY
40 C.41.1.03 UTILITY & GRADING PLAN MODIFY
41 CU.41.2.01 UTILITY PROFILES MODIFY
42 CU.41.7.01 SEPTIC SYSTEM DESIGN PLAN & NOTES MODIFY
43 CU.41.7.02 SEPTIC SYSTEM DESIGN DETAILS MODIFY
44 C.42.1.03 UTILITY & GRADING PLAN MODIFY
45 CS.42.1.06 SITE & LAYOUT PLAN MODIFY
46 CG.42.1.08 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
47 CU.42.2.01 UTILITY PROFILES MODIFY
Package 4 – Construction Documents page 4 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
48 CU.42.2.02 UTILITY PROFILES MODIFY
49 CU.42.7.01 SEPTIC SYSTEM DESIGN PLAN & NOTES MODIFY
50 CU.42.7.02 SEPTIC SYSTEM DESIGN DETAILS MODIFY
51 C.51.1.03 SITE, UTILITY & GRADING PLAN MODIFY
52 C.51.1.04 SITE, UTILITY & GRADING PLAN MODIFY
53 CU.51.7.01 SEPTIC SYSTEM DESIGN PLAN & NOTES MODIFY
54 CU.51.7.02 SEPTIC SYSTEM DESIGN DETAILS MODIFY
55 C.56.1.03 SITE, UTILITY & GRADING PLAN MODIFY
56 C.56.1.04 SITE, UTILITY & GRADING PLAN MODIFY
57 CG.56.1.05 EROSION & SEDIMENT CONTROL PLAN - PHASE 1 MODIFY
58 CG.56.1.06 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 MODIFY
59 CJ.03.1.03 HIGH SPEED TRACK WEST DESIGN MODIFY
60 CJ.03.2.17 HIGH SPEED TRACK WEST STORM PROFILES MODIFY
61 CJ.04.1.01 MOCK URBAN DRIVING TRACK DESIGN MODIFY
62 CJ.04.1.02 MOCK URBAN DRIVING TRACK DESIGN MODIFY
63 CJ.04.1.03 MOCK URBAN DRIVING TRACK DESIGN MODIFY
64 CJ.04.1.04 MOCK URBAN DRIVING TRACK DESIGN MODIFY
65 CJ.04.1.05 MOCK URBAN DRIVING TRACK DESIGN MODIFY
66 CJ.04.4.01 MOCK URBAN DRIVING TRACK DETAIL MODIFY
67 CJ.04.4.02 MOCK URBAN DRIVING TRACK DETAIL MODIFY
68 CJ.04.4.03 MOCK URBAN DRIVING TRACK DETAIL MODIFY
69 CJ.06.5.01 OFF-ROAD DETAILS MODIFY
70 CJ.06.5.02 OFF-ROAD DETAILS MODIFY
71 CJ.06.5.03 OFF-ROAD DETAILS MODIFY
72 CJ.06.5.04 OFF-ROAD DETAILS MODIFY
73 CJ.06.5.05 OFF-ROAD DETAILS MODIFY
74 CJ.06.5.07 OFF-ROAD DETAILS MODIFY
75 CJ.06.5.08 OFF-ROAD DETAILS MODIFY
76 CJ.06.5.09 OFF-ROAD DETAILS MODIFY
77 CJ.06.5.10 OFF-ROAD DETAILS MODIFY
78 CJ.06.5.11 OFF-ROAD DETAILS MODIFY
79 CJ.06.5.12 OFF-ROAD DETAILS MODIFY
80 CJ.09.1.01 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN MODIFY
81 CJ.09.1.02 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN MODIFY
Package 4 – Construction Documents page 5 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
LANDSCAPE DRAWINGS
1 L.00.1.61 PLANTING PLAN - ROAD ENDS MODIFY
2 L.00.5.01 SITE DETAILS MODIFY
3 L.04.1.21 MATERIALS PLAN MODIFY
4 L.04.1.23 MATERIALS PLAN MODIFY
5 L.04.1.63 PLANTING PLAN MODIFY
6 L.04.5.01 SITE DETAILS MODIFY
7 L.06.1.12 TREE PROTECTION PLAN EAST MODIFY
8 L.06.1.62 PLANTING PLAN EAST MODIFY
9 L.06.5.61 PLANTING SCHEDULE AND DETAILS MODIFY
10 L.09.1.26 MATERIALS PLAN MODIFY
11 L.09.1.46 LAYOUT PLAN - E04A MODIFY
12 L.09.5.02 SITE DETAILS MODIFY
13 L.22.1.21 MATERIALS PLAN MODIFY
14 L.22.1.22 MATERIALS PLAN ADD
15 L.22.1.41 LAYOUT PLAN MODIFY
16 L.22.1.42 LAYOUT PLAN ADD
17 L.22.1.61 PLANTING PLAN MODIFY
18 L.22.1.62 PLANTING PLAN ADD
19 L.22.2.01 WALL ELEVATIONS MODIFY
20 L.22.2.02 WALL ELEVATIONS MODIFY
21 L.22.2.11 RAIL ELEVATIONS MODIFY
22 L.22.5.02 SITE DETAILS ADD
23 L.22.5.61 PLANT SCHEDULE AND DETAILS MODIFY
24 L.51.1.11 TREE PROTECTION PLAN MODIFY
25 L.51.1.13 TREE PROTECTION PLAN MODIFY
26 L.51.1.21 MATERIALS PLAN MODIFY
82 CJ.09.1.03 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN ADD
83 CJ.09.1.04 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN ADD
84 CJ.09.1.05 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN ADD
85 CJ.09.1.06 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN ADD
86 CJ.09.1.07 EXPLOSIVES SIMULATION ALLEY TRACK DESIGN ADD
87 CJ.09.2.01 URBAN SIMULATION ALLEY PROFILES MODIFY
Package 4 – Construction Documents page 6 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
27 L.51.1.23 MATERIALS PLAN MODIFY
28 L.51.1.41 LAYOUT PLAN MODIFY
29 L.51.1.43 LAYOUT PLAN MODIFY
30 L.51.1.61 PLANTING PLAN MODIFY
31 L.51.1.63 PLANTING PLAN MODIFY
STRUCTURAL DRAWINGS
1 S.00.5.01 TYPICAL FOUNDATION DETAILS MODIFY
2 S.04.1.01 FOUNDATION PLANS AND DETAILS MODIFY
3 S.04.1.02 FOUNDATION PLAN MODIFY
4 S.04.1.03 FOUNDATION PLAN AND SCHEDULES MODIFY
5 S.09.1.01 SITE/AREA PLAN MODIFY
6 S.09.1.02 FOUNDATION PLAN AREA A MODIFY
7 S.09.1.04 FOUNDATION PLAN AREA B MODIFY
8 S.09.1.05 FOUNDATION PLAN AREA C MODIFY
9 S.09.1.06 FOUNDATION PLAN AREA D MODIFY
10 S.09.1.07 FOUNDATION PLAN AREA E MODIFY
11 S.09.1.08 FOUNDATION PLAN AREA F MODIFY
12 S.22.1.01 FOUNDATION PLAN MODIFY
13 S.22.1.02 FRAMING PLANS MODIFY
14 S.22.2.01 ELEVATIONS AND SCHEDULES MODIFY
15 S.22.3.01 SECTIONS AND DETAILS MODIFY
16 S.23.1.01 FOUNDATION PLAN MODIFY
17 S.36.1.01 FOUNDATION AND FRAMING PLAN MODIFY
18 S.51.1.02 FOUNDATION AND GROUND FLOOR PLAN – AREA A MODIFY
19 S.51.1.03 FOUNDATION AND GROUND FLOOR PLAN – AREA B MODIFY
20 S.51.1.04 FOUNDATION AND GROUND FLOOR PLAN – AREA C MODIFY
21 S.51.1.22 ROOF FRAMING PLAN – AREA A MODIFY
22 S.51.1.24 ROOF FRAMING PLAN – AREA C MODIFY
23 S.51.6.12 SPECIAL JOIST LOADING DIAGRAMS MODIFY
24 S.51.6.14 CONCRETE WALL AND FOOTING SCHEDULE MODIFY
25 S.53.1.01 FOUNDATION PLAN MODIFY
ARCHITECTURAL DRAWINGS
Package 4 – Construction Documents page 7 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
1 A.00.4.01 TYPICAL MOUNTING HEIGHTS AND ACCESSORIES DIAGRAM MODIFY
2 A.00.5.07 TYPICAL ROOF DETAILS MODIFY
3 A.00.5.08 TYPICAL CANOPY DETAILS MODIFY
4 A.00.5.14 TYPICAL CEILING DETAILS MODIFY
5 A.00.601 DOOR SCHEDULES MODIFY
6 A.00.6.02 DOOR SCHEDULES MODIFY
7 A.00.6.20 ROOM FINISH SCHEDULES – A08, A09, D02A, D02B, D02C,
D03
MODIFY
8 A.04.1.01 MOUT – PLAN AND AXON MODIFY
9 A.04.1.02 MOUT – PLAN – LEVEL 2 AND 3 MODIFY
10 A.04.1.03 MOCK EMBASSY – PLAN AND ELEVATION MODIFY
11 A.04.1.04 MOCK EMBASSY – ENLARGED PLAN MODIFY
12 A.04.1.05 CONTAINER EXTERIOR ELEVATION MODIFY
13 A.04.2.01 STAIR AND RAILING MODIFY
14 A.09.1.02 LEVEL 1 PLAN – AREA A MODIFY
15 A.09.1.03 LEVEL 1-4 PLAN – AREA A.1 MODIFY
16 A.09.1.04 LEVEL 1 PLAN – AREA B MODIFY
17 A.09.1.05 LEVEL 1 PLAN – AREA C MODIFY
18 A.09.1.06 LEVEL 1 PLAN – AREA D MODIFY
19 A.09.1.07 LEVEL 1 PLAN – AREA E MODIFY
20 A.09.1.08 LEVEL 1 PLAN – AREA F MODIFY
21 A.09.1.10 LEVEL 2 PLAN – AREA A MODIFY
22 A.09.1.11 LEVEL 2 PLAN – AREA B MODIFY
23 A.09.1.12 LEVEL 2 PLAN – AREA C MODIFY
24 A.09.1.13 LEVEL 2 PLAN – AREA D MODIFY
25 A.09.1.14 LEVEL 2 PLAN – AREA E MODIFY
26 A.09.1.15 LEVEL 2 PLAN – AREA F MODIFY
27 A.09.1.16 LEVEL 3 PLAN – AREA A MODIFY
28 A.09.1.17 LEVEL 3 PLAN – AREA B MODIFY
29 A.09.1.18 LEVEL 3 PLAN – AREA C MODIFY
30 A.09.1.19 LEVEL 3 PLAN – AREA D MODIFY
31 A.09.1.20 LEVEL 3 PLAN – AREA E MODIFY
32 A.09.1.21 LEVEL 3 PLAN – AREA F MODIFY
33 A.09.1.22 LEVEL 4 PLAN – AREA A MODIFY
34 A.09.1.23 LEVEL 4 PLAN – AREA F MODIFY
Package 4 – Construction Documents page 8 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
35 A.09.2.03 EXTERIOR ELEVATIONS – AREA A.1 MODIFY
36 A.09.4.00 LARGE SCALE STAIR PLANS AND SECTIONS MODIFY
37 A.09.4.01 LARGE SCALE STAIR PLANS AND SECTIONS MODIFY
38 A.09.4.02 WALL SECTIONS – AREA A.1 MODIFY
39 A.22.4.07 ENLARGED PLANS & ELEVATIONS – LOBBY, VESTIBULE &
BATHROOM
MODIFY
40 A.31.1.01 FLOOR PLAN – LEVEL 1, ROOF PLAN MODIFY
41 A.32.1.01 FLOOR PLAN – LEVEL 1 & ROOF PLAN MODIFY
42 A.33.1.01 FLOOR PLAN – LEVEL 1, ROOF PLAN MODIFY
43 A.34.1.01 FLOOR PLAN – LEVEL 1, ROOF PLAN MODIFY
44 A.41.1.01 FLOOR PLAN – LEVEL 1 & ROOF PLAN MODIFY
45 A.42.1.01 FLOOR PLAN – LEVEL 1, ROOF PLAN MODIFY
46 A.51.1.03 RANGE LAYOUT PLAN MODIFY
47 A.51.1.11 BALLISTIC DETAILS MODIFY
48 A.51.1.12 BALLISTIC DETAILS MODIFY
MECHANICAL, ELECTRICAL & PLUMBING DRAWINGS
1 F.00.0.02 FIRE PROTECTION DETAILS MODIFY
2 F.31.1.01 FIRE PROTECTION FIRST FLOOR PLAN MODIFY
3 F.41.1.01 FIRE PROTECTION FIRST FLOOR PLAN MODIFY
4 F.42A.1.01 FIRE PROTECTION PLAN, SCHEDULE AND RISER DIAGRAM MODIFY
5 P.23.1.01 PLUMBING FIRST FLOOR PLAN MODIFY
6 M.00.5.04 MECHANICAL DETAILS SHEET 4 MODIFY
7 M.00.9.01 MECHANICAL CAMPUS BAS INTEGRATION DIAGRAM MODIFY
8 M.23.1.01 MECHANICAL DUCTWORK FIRST FLOOR PLAN MODIFY
9 M.23.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
10 M.31.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
11 M.32.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
12 M.33.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
13 M.34.1.01 MECHANICAL DUCTWORK FIRST FLOOR PLAN MODIFY
14 M.34.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
15 M.34.3.01 MECHANICAL SECTIONS MODIFY
16 M.42.1.10 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
17 M.51.6.01 MECHANICAL SCHEDULES - SHEET 1 MODIFY
Package 4 – Construction Documents page 9 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
18 M.51.6.13 MECHANICAL PRESSURIZATION DIAGRAM MODIFY
19 M.51.9.01 MECHANICAL CONTROLS - SHEET 1 MODIFY
20 M.51.9.02 MECHANICAL CONTROLS - SHEET 2 MODIFY
21 M.53.1.11 MECHANICAL PIPEWORK FIRST FLOOR PLAN MODIFY
22 M.53.9.02 MECHANICAL CONTROLS MODIFY
23 E.00.5.03 ELECTRICAL STORAGE AND VIEWING PLATFORM PLAN MODIFY
24 E.04.1.01 ELECTRICAL SITE PLAN MODIFY
25 EP.04.5.01 ELECTRICAL DETAILS MODIFY
26 E.22.1.01 ELECTRICAL SITE PLAN MODIFY
27 E.23.1.01 ELECTRICAL SITE PLAN MODIFY
28 E.31.1.01 ELECTRICAL SITE PLAN MODIFY
29 E.31.6.01 ELECTRICAL DIAGRAMS MODIFY
30 EP.31.1.01 ELECTRICAL POWER FIRST FLOOR PLAN MODIFY
31 E.32.1.01 ELECTRICAL SITE PLAN MODIFY
32 E.32.6.01 ELECTRICAL DIAGRAMS MODIFY
33 EP.32.1.01 ELECTRICAL POWER FIRST FLOOR PLAN MODIFY
34 E.33.1.01 ELECTRICAL SITE PLAN MODIFY
35 E.33.6.01 ELECTRICAL DIAGRAMS MODIFY
36 EP.33.1.01 ELECTRICAL POWER FIRST FLOOR PLAN MODIFY
37 E.34.1.01 ELECTRICAL SITE PLAN MODIFY
38 E.34.3.01 ELECTRICAL SCHEDULES MODIFY
39 E.34.3.02 ELECTRICAL PANEL SCHEDULES MODIFY
40 E.34.6.01 ELECTRICAL DIAGRAMS MODIFY
41 EP.34.1.01 ELECTRICAL POWER FIRST FLOOR PLAN MODIFY
42 E.41.1.01 ELECTRICAL SITE PLAN MODIFY
43 E.41.6.01 ELECTRICAL DIAGRAMS MODIFY
44 EP.41.1.01 ELECTRICAL POWER PLAN MODIFY
45 E.42.1.01 ELECTRICAL SITE PLAN MODIFY
46 E.42.6.01 ELECTRICAL DIAGRAMS MODIFY
47 EP.42.1.01 ELECTRICAL POWER FIRST FLOOR PLAN MODIFY
48 E.42A.1.01 ELECTRICAL PLANS MODIFY
49 E.51.5.01 CONTROL PANEL DETAIL MODIFY
50 E.51.5.02 CONTROL PANEL DETAIL MODIFY
51 E.51.6.02 ELECTRICAL DIAGRAMS MODIFY
Package 4 – Construction Documents page 10 31 March 2017
SENSITIVE BUT UNCLASSIFIED / DESTROY BY SHREDDING
52 E.51.6.04 ELECTRICAL PANEL SCHEDULES MODIFY
53 EL.51.1.01 ELECTRICAL 25M RANGE LIGHTING FIRST FLOOR PART PLAN MODIFY
54 EL.51.1.02 ELECTRICAL 100M RANGE LEFT LIGHTING FIRST FLOOR PART
PLAN
MODIFY
55 EL.51.1.03 ELECTRICAL 100M RANGE RIGHT LIGHTING FIRST FLOOR PART
PLAN
56 EP.51.1.01 ELECTRICAL 25M RANGE POWER FIRST FLOOR PART PLAN
57 EP.51.1.03 ELECTRICAL 100M RANGE RIGHT POWER FIRST FLOOR PART
PLAN
58 E.53.1.01 ELECTRICAL SITE PLAN
TELECOM DRAWINGS
1 ET.00.0.01 TELECOM SCHEDULES AND RISER DIAGRAMS MODIFY
2 ET.31.1.01 ELECTRICAL TELECOM FLOOR PLAN, ENLARGED PLAN AND
ELEVATION
MODIFY
3 ET.32.1.01 ELECTRICAL TELECOM FLOOR PLAN, ENLARGED PLAN AND
ELEVATION
MODIFY
4 ET.33.1.01 ELECTRICAL TELECOM FLOOR PLAN, ENLARGED PLAN AND
ELEVATION
MODIFY
5 ET.34.1.01 ELECTRICAL TELECOM FLOOR PLANS, ENLARGED PLAN AND
ELEVATIONS
MODIFY
6 ET.41.1.01 ELECTRICAL TELECOM FLOOR PLAN, ENLARGED PLAN AND
ELEVATION
MODIFY
7 ET.42.1.01 ELECTRICAL TELECOM FLOOR PLAN, ENLARGED PLAN AND
ELEVATION
MODIFY
8 ET.51.1.01 ELECTRICAL TELECOM FLOOR PLANS MODIFY
SECURITY DRAWINGS
1 X.00.5.01 SECURITY DETAILS MODIFY
X.00.5.01 SECURITY DETAILS MODIFY
2 X.00.5.02 SECURITY DETAILS MODIFY
3 X.51.1.01 FIRST FLOOR SECURITY DEVICE PLAN MODIFY
4 X.51.6.01 SECURITY RISER DIAGRAMS MODIFY
END OF ADDENDUM B
File details come from the government source that posted it. Updated .