Block_14_Description.pdf
PDF 7 KB Posted
- Attached to
- MATSSC Security Project
- Solicitation number
- GS-03-P-16-AZ-C-7026
About this file
SF-30 Block 14 Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MATSSC_Security_Project_Pre_Bid_Q A_10.14.16.docx | DOCX document | |
| Solicitation_Amendment_GS-03-P-16-AZ-C-7026_0005.pdf | ||
| PA5_20161014.pdf | ||
| Solicitation_Amendment_GS-03-P-16-AZ-C-7026_0004.pdf | ||
| PA5_20160930.pdf | ||
| MATSSC_Security_Project_Pre_Bid_Q A_10.5.16.docx | DOCX document | |
| Solicitation_Amendment_GS-03-P-16-AZ-C-7026_0003.pdf | ||
| MATSSC_Security_Project_Pre_Bid_Q A_9.22.16.docx | DOCX document | |
| Solicitation_Amendment_GS-03-P-16-AZ-C-7026_0002.pdf | ||
| OwnerEval.doc | DOC document | |
| Pre-Proposal_Sign-In_Sheets.pdf | ||
| Pre-Proposal_MINUTES_-_MATSSC_Security_Project.pdf | ||
| PA5_20060909.pdf | ||
| Block_14_Description.docx | DOCX document | |
| Solicitation_Amendment_GS-03-P-16-AZ-C-7026_0001.pdf | ||
| C101-SB.pdf | ||
| C301.doc | DOC document | |
| C201-SB.pdf | ||
| GSA527-15a.pdf | ||
| GS-03-P-16-AZ-C-7026__Form1442.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number GS-03P-16-AZ-C-7026 Amendment Number 0002 Description Block 14:
The solicitation is hereby amended to include the following questions and answers:
Q1) Would it be possible to obtain the name and contact information for the
Contractor that maintains or installed the sprinkler system referenced in the Unit Prices?
Answer: SSA does not want to provide it and would prefer that the bidders hire an actual lawn sprinkler contractor for any required repairs as opposed to their maintenance contractor.
Q2) On drawing AP.1.01 there is no notation about the low protective metal rail along the floor in front of the mural. If this protective assembly is to be constructed as drawn, this railing must be removed. Is it the intention to have this railing removed or the assembly build around it? If it is to be removed, is that in the Art Protection Scope of Work? Answer: The existing protective metal railing would not be required during the phase 1 artwork protection as the artwork would be protected via the plywood wall as drawn. We are not specifying if the existing railing needs to be removed or built around. The offeror should determine this as part of their means and methods. Any work performed that close to the artwork shall be closely supervised by the fine arts professional if not directly performed by this person.
Q3) During Phase 1, the Fine Arts Conservator is required to monitor the artwork the entire time the repairs to the floor and ceiling take place. Is there an estimate for how long this work will require? Answer: The time to complete the work that requires the Phase 1 protection of the artwork will depend on the offerors means and methods for completing the project therefore we cannot provide an estimated duration for this need.
The proposal due date is hereby extended to Wednesday, September 28, 2016, 4:00 PM Eastern Time. Additionally, the due date for all questions to be submitted is extended to Wednesday, September 21, 2016, 4:00 PM Eastern Time. All other solicitation provisions remain unchanged.