Tab_10_Amendment_0001.pdf
PDF 88 KB Posted
- Solicitation number
- GS-01P-13-BZ-D-0005
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Tab_10_Amendment_0002.pdf | ||
| Tab_10_Amendment_0003.pdf | ||
| Tab_10_Amendment_0002.docx | DOCX document | |
| STRUCTURED_CABLING_DRAWINGS_29_NOV_12.pdf | ||
| Reps_and_Certs_Cabling.pdf | ||
| Solicitation_Cabling.pdf | ||
| SOW_AND_SPECIFICATIONS_29_NOV_2012.pdf | ||
| GSA527_Form.pdf | ||
| Wage_Determination_CT130021_1.18.13.pdf | ||
| Agreement_Cabling.pdf | ||
| FormSF1442.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
Kimberly Yates
Contracting Officer
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 1
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
0001 03-06-2013
6. Issued By Code 1PSA 7. Administered By (If other than Item 6) Code 1PSA
Acquisition Branch, Service Centers Division See block 6
GSA/PBS
10 Causeway Street, Rm 1100
Boston, MA 02222-1077
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
GS-01P-13-BZ-D-0005
9B. Date (See Item 11)
2/22/2013
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers x is extended x is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation No. GS-01P-13-BZ-D-0005 for Structured Cable Upgrades at the A.A. Ribicoff Federal Building and U.S. Courthouse in
Hartford, CT is hereby amended as follows:
1. As a result of this amendment, the offer receipt date and time is not extended and remains Wednesday, March 13, 2013 at 2:00 p.m.
2. In Section 13. “Additional Solicitation Requirements” on SF1449, change:
FROM: “(b) An offer guarantee is not required.”
TO: “(b) An offer guarantee is required.”
3. Attached are GSA’s responses to some questions received from contractors, ‘Questions and Answers #1’
Questions and Answers #1
1.) Q: Please verify all data, no POTS lines?
A: Correct no POTS lines.
2.) Q: Are all ground bus bars existing- do they need to be interconnected?
A: They are existing and tied to building ground- contractor will not be required to add or connect them.
3.) Q: Please verify - Specifications call for angled patch panels - is this correct?
A: Yes, see Section 2.02 ADMINISTRATION SUBSYSTEM, Section (A)(1)(e); panels shall be angled to directly allow access to vertical managers.
4.) Q: What phase is the center area of the 2nd level going to be considered as it is not marked as a phase on the drawing?
A: Phase 2.
5.) Q: The cover drawing notes show Phase 5 as the Annex Floor but the diagram is showing it to be Phase 4 on the second floor?
A: Annex first floor will be Phase 5.
6.) Q: In the clerks office; who will be responsible for relocating the systems furniture that is currently against the walls?
A: GSA will have the furniture moved.
7.) Q: In the area where core boring is required- will the contractor be responsible for x-ray testing to verify obstructions?
A: No- construction drawings indicate no obstructions in this area.