Amendment_0004.pdf

PDF 92 KB Posted

Attached to
Structured Cable Upgrade Ribicoff Federal Building
Solicitation number
GS-01P-13-BZ-D-0005
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Tab_10_Amendment_0002.pdf PDF
Tab_10_Amendment_0001.pdf PDF
Tab_10_Amendment_0003.pdf PDF
Tab_10_Amendment_0002.docx DOCX document
STRUCTURED_CABLING_DRAWINGS_29_NOV_12.pdf PDF
Reps_and_Certs_Cabling.pdf PDF
Solicitation_Cabling.pdf PDF
SOW_AND_SPECIFICATIONS_29_NOV_2012.pdf PDF
GSA527_Form.pdf PDF
Wage_Determination_CT130021_1.18.13.pdf PDF
Agreement_Cabling.pdf PDF
FormSF1442.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

Kimberly Yates

Contracting Officer

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 1

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

0004 03-12-2013

6. Issued By Code 1PSA 7. Administered By (If other than Item 6) Code 1PSA

Acquisition Branch, Service Centers Division See block 6

GSA/PBS

10 Causeway Street, Rm 1100

Boston, MA 02222-1077

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

GS-01P-13-BZ-D-0005

9B. Date (See Item 11)

2/22/2013

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, x is required to sign this document and return 1 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation No. GS-01P-13-BZ-D-0005 for Structured Cable Upgrades at the A.A. Ribicoff Federal Building and U.S. Courthouse in

Hartford, CT is hereby amended as follows:

1. As a result of this amendment, the offer receipt date and time is not extended and remains Thursday, March 14, 2013 at 2:00 p.m.

2. Attached are GSA’s responses to questions received from contractors, ‘Questions and Answers #3’

Questions and Answers #3

1.) Q: Do the participating contractors need to be bonded?

A: Yes, per Solicitation Section I.F. Far 52.228-1 (b)

2.) Q: Will the winning contractor be paid after each completed phase?

A: Payments will be made in accordance with FAR 52.232-5, Payments under Fixed-Price Construction

Contracts. Please refer to Section III.N. Administrative Matters (3) Payments.

3.) Q: Is there any special type of permit needed for a contractor that is base out of state. Ie: NYC.

A: Minimum requirements for installers is noted on section 27 10 00 page 1 para B. Installation crew shall have BICSI certification Level 1 (one installer) and one Level 2 (one installater) and project shall be managed by a Registered Communications Distribution Designer (RCDD).

4.) Q: Where is the Representations and Certifications Document C301 located?

A: The ‘Offeror Representations and Certifications Document C301/Feb 2013’ is included in the

Package attachments as ‘Reps and Certs Cabling’

File details come from the government source that posted it. Updated .