GLEN_13-1403_SOW_Addendum.pdf

PDF 47 KB Posted

Attached to
B500 HVAC Federal contract opportunity
Solicitation number
GLEN13-1403_Solicitation
Issued by
Department of the Air Force Space Command

About this file

SOW Addendum

View the file

Other files for this federal contract opportunity

Other files attached to B500 HVAC, newest first.
File Type Posted
RFI_Questions_3_Jul_2018.docx DOCX document
FA255018R1012_GLEN_13-1403_Amendment_002.pdf PDF
M-101_-_MECHANICAL_DUCTWORK_FLOOR_PLAN_13-1403.PDF PDF
Amendment_002_Information.pdf PDF
Amendment_Information.docx DOCX document
1_GLEN131403_SOW.pdf PDF
4_GLEN131403_AF_Form_66.xls XLS spreadsheet
0_FA2550-18-R-1012.pdf PDF
3_Specifications.pdf PDF
5_Wage_Determination.pdf PDF
2_GLEN131403_Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Addendum 1

Project Number: GLEN 13-1403

Repair HVAC, B500

Schriever AFB, Colorado

12 June 2018

GLEN 19-2102

1.0 BACKGROUND:

An amendment for a SOW Addendum is necessary due to changes to the requirement.

2.0 SCOPE OF WORK:

The Contractor shall provide all labor, tools, and materials to complete all work represented by these changes. The Contractor shall still adhere to the original contract documents, including the original Statement of Work and the USACE final design Drawings and Specifications. All material and testing requirements from the original contract scope remain unchanged. The Contractor shall provide the Government with complete construction, and warranty for this project, to include both original and modified requirements.

3.0 MODIFIED REQUIREMENTS:

5.2.1 Demolition:

a. Demolish existing relief and return air dampers and actuators as indicated on the project drawings M-101.

b. Demolish the existing outside air and economizer dampers and actuators as indicated on the project drawings.

c. Demolish existing condensing unit CU-SSB-101 as shown project drawing M-101.

d. Demolish existing insulation on chilled water and steam lines in the mechanical room.

5.2.2 New Work:

a. Install new relief air damper actuator and return air camper actuator as indicated on the project drawings.

b. Install new outside air and economizer dampers as indicated on the project drawings.

c. Install new condensing unit comparable to the existing unit CU-SSB-101and associated valves and fittings.

d. Install new CO2, humidity, and differential pressure sensors as indicated on the project drawings. Update control sequence and graphics as necessary. Current controls contractor in B500 is HSQ.

e. Repair any damage to the facility and/or landscaping that is caused by the contractor.

f. Replace pipe insulation on chilled water and steam lines in the mechanical room.

g. Repaint piping on chilled water and steam lines in the mechanical room.

h. Replace relief air damper and return air damper. See keyed notes 1 & 2 on project drawing M-101.

Statement of Work Addendum 1
1.0 BACKGROUND:
2.0 SCOPE OF WORK:
3.0 MODIFIED REQUIREMENTS: