4_GLEN131403_AF_Form_66.xls
XLS spreadsheet 128 KB Posted
- Attached to
- B500 HVAC Federal contract opportunity
- Solicitation number
- GLEN13-1403_Solicitation
About this file
AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Questions_3_Jul_2018.docx | DOCX document | |
| FA255018R1012_GLEN_13-1403_Amendment_002.pdf | ||
| M-101_-_MECHANICAL_DUCTWORK_FLOOR_PLAN_13-1403.PDF | ||
| Amendment_002_Information.pdf | ||
| GLEN_13-1403_SOW_Addendum.pdf | ||
| Amendment_Information.docx | DOCX document | |
| 1_GLEN131403_SOW.pdf | ||
| 0_FA2550-18-R-1012.pdf | ||
| 3_Specifications.pdf | ||
| 5_Wage_Determination.pdf | ||
| 2_GLEN131403_Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| GLEN 13-1403 | Repair HVAC, B500 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | Note: 3 copies required per submittal. Government will retain all submittals. | CERTIFICATE OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS |
| GENERAL | ||||||||||||||||||||||
| 1 | AF Form 3064, Contract Progress Schedule | X | NTP+10 Days | |||||||||||||||||||
| 2 | AF Form 3065, Contract Progress Report | X | Per Contract | |||||||||||||||||||
| 3 | Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval Form | X | Prior to Project Start | |||||||||||||||||||
| 4 | Specification Section 01 57 20.00 10, Appendix B: Green Products Determination Form | X | Prior to Project Start | |||||||||||||||||||
| 5 | Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification Form | X | Prior to Project Start | |||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 6 | Specification Section 23 05 93: TAB Firm | X | NTP+15 Days | |||||||||||||||||||
| 7 | Specification Section 23 05 93: TAB Report | X | Prior to Closeout | |||||||||||||||||||
| 8 | Specification Section 23 07 00: Pipe Insulation | X | NTP+15 Days | |||||||||||||||||||
| 9 | Specification Section 23 08 00.00 10 - Commissioning Report | X | Prior to Closeout | |||||||||||||||||||
| 10 | Specification Section 23 09 23.13 20: Controls Drawings and Hardware | X | X | NTP+15 Days | ||||||||||||||||||
| 11 | Specification Section 23 09 23.13 20: Variable Frequency Drives | X | NTP+15 Days | |||||||||||||||||||
| 12 | Specification Section 23 64 26: Pumps, Valves, and Fittings | X | NTP+15 Days | |||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 13 | Specification Section 26 05 00.00 40: Wiring, conduit, and fittings | X | NTP+15 Days | |||||||||||||||||||
| 14 | Specification Section 26 05 00.00 40: Circuit Breakers | X | NTP+15 Days | |||||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 15 | As-Built Drawings | X | Prior to Closeout | |||||||||||||||||||
| 16 | O&M Manuals | X | Prior to Closeout |
&F
File details come from the government source that posted it.