4_GLEN131403_AF_Form_66.xls

XLS spreadsheet 128 KB Posted

Attached to
B500 HVAC Federal contract opportunity
Solicitation number
GLEN13-1403_Solicitation
Issued by
Department of the Air Force Space Command

About this file

AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to B500 HVAC, newest first.
File Type Posted
RFI_Questions_3_Jul_2018.docx DOCX document
FA255018R1012_GLEN_13-1403_Amendment_002.pdf PDF
M-101_-_MECHANICAL_DUCTWORK_FLOOR_PLAN_13-1403.PDF PDF
Amendment_002_Information.pdf PDF
GLEN_13-1403_SOW_Addendum.pdf PDF
Amendment_Information.docx DOCX document
1_GLEN131403_SOW.pdf PDF
0_FA2550-18-R-1012.pdf PDF
3_Specifications.pdf PDF
5_Wage_Determination.pdf PDF
2_GLEN131403_Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN 13-1403Repair HVAC, B500
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERNote: 3 copies required per submittal. Government will retain all submittals.CERTIFICATE OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1AF Form 3064, Contract Progress ScheduleXNTP+10 Days
2AF Form 3065, Contract Progress ReportXPer Contract
3Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval FormXPrior to Project Start
4Specification Section 01 57 20.00 10, Appendix B: Green Products Determination FormXPrior to Project Start
5Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification FormXPrior to Project Start
MECHANICAL
6Specification Section 23 05 93: TAB FirmXNTP+15 Days
7Specification Section 23 05 93: TAB ReportXPrior to Closeout
8Specification Section 23 07 00: Pipe InsulationXNTP+15 Days
9Specification Section 23 08 00.00 10 - Commissioning ReportXPrior to Closeout
10Specification Section 23 09 23.13 20: Controls Drawings and HardwareXXNTP+15 Days
11Specification Section 23 09 23.13 20: Variable Frequency DrivesXNTP+15 Days
12Specification Section 23 64 26: Pumps, Valves, and FittingsXNTP+15 Days
ELECTRICAL
13Specification Section 26 05 00.00 40: Wiring, conduit, and fittingsXNTP+15 Days
14Specification Section 26 05 00.00 40: Circuit BreakersXNTP+15 Days
CLOSEOUT
15As-Built DrawingsXPrior to Closeout
16O&M ManualsXPrior to Closeout

&F