GAOA23_ToiletPlans.pdf

PDF 9 MB Posted

Attached to
GAOA Accessible Upgrade, Toilet Replacement (STF), Stanislaus National Forest, Calif.
Solicitation number
1094899
Issued by

About this file

This package includes design plans and specifications for accessible upgrades to toilet facilities on the Stanislaus National Forest in California. The project involves demolishing existing restroom structures at six campground locations and installing new prefabricated vault toilets that meet accessibility standards.

Work will include demolishing and removing existing toilet buildings and vaults, excavating for new vault installations, installing prefabricated single and double-unit vault toilets, constructing concrete pads and walkways, and site restoration. Some sites offer optional items like parking improvements, boulder barriers, and aggregate base paths. Structures must withstand 250psf snow loads and incorporate sweet-smelling ventilation technology.

The solicitation number provided is 1094899 for accessible upgrade and toilet replacement services on the Stanislaus National Forest in California. The contracting agency is listed as the Department of Agriculture Forest Service. The package includes design drawings, specifications, general notes, and location details for the scope of work.

View the file

Other files

File Type Posted
Amendment No. 1 (1) Toilet Upgrade.docx DOCX document
GAOA23Toilets_Specifications.doc DOC document
127EAW23R0026.pdf PDF
4_SECTION_C_const.docx DOCX document
Section J PAL Fire Plan.doc DOC document
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

United States Department of Agriculture

Forest Service

ACCESSIBLE UPGRADE - TOILET REPLACEMENT (STF)

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

FOREST SUPERVISOR DATE

3/7 /23

:3

5 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\C

OV

ER

SH

EE

T.

DW

G;

CALIFORNIA

ALPINE, CALAVERAS, AND TUOLUMNE COUNTIES

(R05) PACIFIC SOUTHWEST REGION

STANISLAUS NATIONAL FOREST

CALAVERAS, SUMMIT/MIWOK DISTRICTS

MULTIPLE SITES WITHIN THE STANISLAUS NATIONAL FOREST.

LOCATED VIA HWY 4 - HERMIT VALLEY CAMPGROUND, MOSQUITO LAKES

CAMPGROUND, SAND FLAT 4WD CAMPGROUND, LODGEPOLE CAMPGROUND

LOCATED VIA HWY 108 - CRABTREE XC TRAILHEAD, CASCADE CAMPGROUND

DISTRICT RANGER DATE

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:3

5 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\C

OV

ER

SH

EE

T.

DW

G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS, SUMMIT/MIWOK

AREA MAP

01/26/2023

N. THOMPSON

N. THOMPSON

N. THOMPSON

G-02 1 9

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:3

5 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\C

OV

ER

SH

EE

T.

DW

G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS, SUMMIT/MIWOK

GENERAL NOTES

01/26/2023

N. THOMPSON

N. THOMPSON

N. THOMPSON

G-03 2 9

GENERAL NOTES:

1. WORK CANNOT BE PERFORMED BETWEEN MAY 21 AND SEPTEMBER 7 EXCEPT AT CRABTREE XC TRAILHEAD LOCATION. WORK AT CRABTREE XC TRAILHEAD MAY COMMENCE WHEN GROUND

CONDITIONS PERMIT.

2. CONTRACTOR SHALL FURNISH PORTABLE TOILETS FOR THE PUBLICS USE FROM START OF DEMO UNTIL ACCEPTANCE OF TOILET AND ALL SITE WORK. PORTABLE TOILETS ARE REQUIRED AT ALL

SITES EXCEPT FOR CRABTREE XC TRAILHEAD.

3. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE CONTRACT TO THE CO FOR APPROVAL PRIOR TO THE START OF WORK.

4. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED SUBIDIARY TO OTHER PAY ITEMS.

5. BEFORE ANY EXCAVATION ACITIVIES BEGIN, THE CONTRACTOR SHALL CONTACT A SERVICE TO LOCATE ANY BURIED UTILITIES. USA = 1-800-642-2444, THE NATIONAL 811 NUMBER, OR THE

WEBSITE WWW.USANORTH811.ORG

6. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS, SHALL BE CURRENTLY LICENCED

7. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION HANDBOOK, DATED DECEMBER

2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL 2012.

8. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET

9. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE

WORK NOTES:

1. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGES BY CONTRACTOR DURING CONSTRUCTION SHALL BE REPAIRED BY

CONTRACTOR.

2. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.

3. WASTE AREAS WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.

4. WATER SOURCES, IF NEEDED, SHALL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.

5. UTILITIES: CONTACT 811 PRIOR TO DIGGING. DO NOT BEGIN GROUND DISTURBING WORK UNTIL A MEETING IS HELD WITH THE FOREST

SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE UTILITIES THAT NEED TO BE PROTECTED.

6. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM COMMERCIAL SOURCES. AGGREGATE SHALL BE

OBTAINED FROM AN APPROVED SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25% ASBESTOS TO

BE IN COMPLIANCE WITH CALIFORNIA HEALTH AND SAFETY CODE SECTIONS 93105 AND 93106

7. ANY DISTURBANCE (SUCH AS BORROW SITES AND STAGING AREAS) SHALL BE RESTORED.

ABBREVIATIONS:

AB AGGREGATE ROAD BASE

AC ASPHALT CONCRETE

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S REPRESENTATIVE

CY CUBIC YARD

LF LINEAR FOOT

SF SQUARE FOOT

STA STATION

SY SQUARE YARD

TYP TYPICAL

(N) NEW

(E) EXISTING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS DISTRICT

CASCADE CREEK

CAMPGROUND

1/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B.,J.N.

C-01 3 9

DEMOLISH RESTROOM STRUCTURE

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE,

INCLUDING VAULT

2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY

REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND

DISPOSED OF IN A LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) TOILET UNIT

2. CONTRACTOR TO INSTALL 1-UNIT PREFABRICATED VAULT TOILET. THE

BUILDING SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL

AND CEDAR SHAKE TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH

POLYETHYLENE VAULT LINER INSERT, MINIMUM VOLUME OF 1000 GALLON

PER TOILET COMPARTMENT, AND A HINGED VAULT CLEANOUT LID ABLE

TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH CHASE, SOLAR VENT STACK FAN (OPTIONAL ITEM),

VENT SCREEN, AND COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL

KEYED THE SAME (SCHLAGE OR EQUAL). CONTRACTOR SHALL PROVIDE 10

KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN

OF THE VENTILATION SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING

CONCRETE, SEALING JOINTS, AND COMPLETING ALL PREPARATION

NECESSARY FOR THE BUILDING TO BE OPEN FOR PUBLIC USE

4. TOILET SHALL BE INSTALLED ROUGHLY IN EXISTING FOOTPRINT -- LOCATION

TO BE STAKED BY COR. CONTRACTOR SHALL USE (E) VAULT DEPRESSION FOR

PLACING (1) UNIT WHEN APPLICABLE. REMOVE ADDITIONAL MATERIAL AS

NEEDED. AN AREA FOR EXCESS EXCAVATION MATERIAL SHALL BE

DESIGNATED ON SITE BY COR.

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR

PLASTIC MESH FENCE SECURED TO STEEL POSTS TO COMPLETELY

SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER

MANUFACTURER'S INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL AND

ABA REQUIREMENTS. BACKFILL AROUND NEW BUILDINGS TO 95%

COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES

INSTALL VAULT TOILET

To Strawberry, CA

ACCESSIBILITY

SITE WORK NOTES:

1. CREATE CONCRETE ADA COMPLIANT THRESHOLD AT ENTRANCE TO VAULT

TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS SLOPE 2%

2. CONCRETE MIX PER SPECIFICATIONS

3. PROVIDE SMOOTH TRANSITION BETWEEN PATHWAY AND ENTRANCE INTO

VAULT TOILET.

Cascade Campground

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

HWY 108

AutoCAD SHX Text 5N28

AutoCAD SHX Text

SINGLE VAULT TOILET

AutoCAD SHX Text

ADA CONCRETE WALKWAY

BOLLARDS AND LOG BARRIER (E)

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

SUMMIT/MIWOK DISTRICT

CRABTREE

CROSS-COUNTRY

TRAILHEAD

01/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B.,J.N.

C-02 4 9

DEMOLISH RESTROOM STRUCTURE

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE, INCLUDING VAULT

2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND DISPOSED OF IN A

LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) TOILET UNIT

2. CONTRACTOR TO INSTALL 1-UNIT PREFABRICATED VAULT TOILET. THE BUILDING

SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL AND

CEDAR SHAKE TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH POLYETHYLENE VAULT

LINER INSERT, MINIMUM VOLUME OF 1000 GALLON PER TOILET COMPARTMENT,

AND A HINGED VAULT CLEANOUT LID ABLE TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH CHASE, SOLAR VENT STACK FAN (OPTIONAL ITEM), VENT

SCREEN, AND COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL KEYED THE SAME

(SCHLAGE OR EQUAL). CONTRACTOR SHALL PROVIDE 10 KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN OF THE

VENTILATION SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING

CONCRETE, SEALING JOINTS, AND COMPLETING ALL PREPARATION NECESSARY FOR

THE BUILDING TO BE OPEN FOR PUBLIC USE

4. EXISTING TOILET AND TANK ARE ABOVEGROUND. NEW EXCAVATION WILL BE NEEDED

FOR INSTALLATION OF NEW TOILET. AN AREA FOR PLACEMENT OF EXCESS

EXCAVATION MATERIAL SHALL BE DESIGNATED BY COR ON SITE.

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR PLASTIC

MESH FENCE SECURED TO STEEL POSTS TO COMPLETELY SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER MANUFACTURER'S

INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL AND ABA REQUIREMENTS.

BACKFILL AROUND NEW BUILDINGS TO 95% COMPACTION. GRADE TO DRAIN AWAY

FROM BUILDINGS ON ALL SIDES

INSTALL VAULT TOILET

ACCESSIBILITY

SITE WORK NOTES:

1. CREATE CONCRETE ADA COMPLIANT THRESHOLD AT ENTRANCE TO VAULT

TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS SLOPE 2%

2. CONCRETE MIX PER SPECIFICATIONS.

3. PROVIDE SMOOTH TRANSITION BETWEEN PATHWAY AND ENTRANCE INTO

VAULT TOILET.

To Dodge Ridge Mountain Resort

To Pinecrest

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text 4N06Y

AutoCAD SHX Text

SINGLE VAULT TOILET

AutoCAD SHX Text

CONCRETE ADA WALKWAY

AutoCAD SHX Text 4N06Y

AutoCAD SHX Text

DODGE RIDGE RD

DODGE RIDGE LOOP RD

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS DISTRICT

HERMIT VALLEY

01/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B,J.N.

C-03 5 9

DEMOLISH RESTROOM STRUCTURE

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE,

INCLUDING VAULT

2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY

REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND

DISPOSED OF IN A LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS

INSTALL VAULT TOILET

ACCESSIBILITY

SITE WORK NOTES:

1. CREATE CONCRETE ADA COMPLIANT THRESHOLD AT ENTRANCE TO VAULT

TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS SLOPE 2%

2. CONCRETE MIX PER SPECIFICATIONS.

3. PROVIDE SMOOTH TRANSITION BETWEEN PATHWAY AND ENTRANCE INTO

VAULT TOILET.

4. PLACE BOULDER BARRIERS AS SHOWN IN DRAWING (OPTION ITEM)

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) TOILET UNITS

2. CONTRACTOR TO INSTALL 2-UNIT PREFABRICATED VAULT TOILET. THE BUILDING SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL AND CEDAR SHAKE

TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH POLYETHYLENE VAULT LINER

INSERT, MINIMUM VOLUME OF 1000 GALLON PER TOILET COMPARTMENT, AND A HINGED VAULT

CLEANOUT LID ABLE TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH CHASE, SOLAR VENT STACK FAN (OPTIONAL ITEM), VENT SCREEN, AND

COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL KEYED THE SAME (SCHLAGE OR EQUAL).

CONTRACTOR SHALL PROVIDE 10 KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN OF THE VENTILATION

SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING CONCRETE, SEALING

JOINTS, AND COMPLETING ALL PREPARATION NECESSARY FOR THE BUILDING TO BE OPEN FOR

PUBLIC USE

4. TOILET SHALL BE INSTALLED ROUGHLY IN EXISTING FOOTPRINT -- LOCATION TO BE STAKED BY COR.

CONTRACTOR SHALL USE (E) VAULT DEPRESSION FOR PLACING (1) UNIT WHEN APPLICABLE. REMOVE

ADDITIONAL MATERIAL AS NEEDED

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR PLASTIC MESH FENCE

SECURED TO STEEL POSTS TO COMPLETELY SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER MANUFACTURER'S INSTRUCTIONS IN

ACCORDANCE WITH OPERATIONAL AND ABA REQUIREMENTS. BACKFILL AROUND NEW BUILDINGS TO

95% COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES

Hermit Valley Campground

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

ADA CONCRETE WALKWAY

AutoCAD SHX Text

DOUBLE VAULT TOILET

AutoCAD SHX Text

HWY 4

BOULDER BARRIERS (OPTIONAL ITEM)

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

STANISLAUS NATIONAL

FOREST

CALAVERAS DISTRICT

MOSQUITO LAKES

01/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B,J.N.

C-04 6 9

DEMOLISH RESTROOM STRUCTURE

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE,

INCLUDING VAULT

2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY

REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND

DISPOSED OF IN A LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) TOILET UNITS

2. CONTRACTOR TO INSTALL 1-UNIT PREFABRICATED VAULT TOILET. THE

BUILDING SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED

WALL AND CEDAR SHAKE TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH

POLYETHYLENE VAULT LINER INSERT, MINIMUM VOLUME OF 1000

GALLON PER TOILET COMPARTMENT, AND A HINGED VAULT

CLEANOUT LID ABLE TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH CHASE, SOLAR VENT STACK FAN, VENT SCREEN,

AND COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL KEYED THE

SAME (SCHLAGE OR EQUAL). CONTRACTOR SHALL PROVIDE 10 KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE

DESIGN OF THE VENTILATION SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE,

PATCHING CONCRETE, SEALING JOINTS, AND COMPLETING ALL

PREPARATION NECESSARY FOR THE BUILDING TO BE OPEN FOR PUBLIC

USE

4. LOCATION TO BE STAKED BY COR. REMOVE ADDITIONAL MATERIAL AS

NEEDED

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR

PLASTIC MESH FENCE SECURED TO STEEL POSTS TO COMPLETELY

SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE

GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER

MANUFACTURER'S INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL

AND ABA REQUIREMENTS. BACKFILL AROUND NEW BUILDINGS TO 95%

COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES

8. VAULT TOILET MUST BE MINIMUM 100' FROM BODIES OF WATER.

INSTALL VAULT TOILET

ACCESSIBILITY

PARKING AND SITE WORK NOTES:

1. OPTIONAL ITEM: CREATE CONCRETE ADA COMPLIANT PARKING SPOT

ADJACENT TO VAULT TOILET. PARKING SPACE DIMENSIONS TO BE MINIMUM

8'X20' WITH 5' WIDE CONCRETE WALKWAY.

2. OPTIONAL ITEM: CREATE ADA COMPLIANT CONCRETE PATH BETWEEN

PARKING SPOT AND VAULT TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS

SLOPE 2%, MAXIMUM RUNNING SLOPE 5% IN DIRECTION OF TRAVEL.

CONCRETE MIX PER SPECIFICATIONS.

3. CREATE CONCRETE ADA COMPLIANT THRESHOLD AT ENTRANCE TO VAULT

TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS SLOPE 2%

4. PROVIDE SMOOTH TRANSITION BETWEEN PATHWAY AND ENTRANCE INTO

VAULT TOILET.

5. OPTIONAL ITEM: PLACE BOULDER BARRIERS AS SHOWN IN DRAWING.

Mosquito Lakes

Mosquito Lakes Campground

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

CONCRETE ADA WALKWAY AND PARKING (OPTIONAL ITEM)

AutoCAD SHX Text

SINGLE VAULT TOILET

AutoCAD SHX Text 8N14

AutoCAD SHX Text 8N14

AutoCAD SHX Text

HWY 4

AutoCAD SHX Text

BOULDER BARRIERS (OPTION ITEM)

ADA ENTRANCE THRESHOLD

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

STANISLAUS NATIONAL

FOREST

CALAVERAS DISTRICT

SAND FLAT 4WD

CAMPGROUND

01/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B.,J.N.

C-05

7 9DEMOLISH RESTROOM STRUCTURES

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURES (2), INCLUDING VAULTS

2. PUMP (E) VAULTS AND DISPOSE OF WASTEWATER PER REGULATORY REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND DISPOSED OF IN A LANDFILL CERTIFIED FOR

CONSTRUCTION DEBRIS

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) DOUBLE TOILET UNIT.

2. CONTRACTOR TO INSTALL 2-UNIT PREFABRICATED VAULT TOILET. THE BUILDING SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL AND CEDAR SHAKE TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH POLYETHYLENE VAULT LINER INSERT, MINIMUM VOLUME OF 1000 GALLON PER

TOILET COMPARTMENT, AND A HINGED VAULT CLEANOUT LID ABLE TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH CHASE, SOLAR VENT STACK FAN, VENT SCREEN, AND COMMERCIAL GRADE LOCKABLE DOORKNOBS ALL KEYED THE SAME

(SCHLAGE OR EQUAL). CONTRACTOR SHALL PROVIDE 10 KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN OF THE VENTILATION SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING CONCRETE, SEALING JOINTS, AND COMPLETING ALL PREPARATION

NECESSARY FOR THE BUILDING TO BE OPEN FOR PUBLIC USE

4. TOILET SHALL BE INSTALLED AT LOCATION TO BE STAKED BY COR. EXITING VAULT TOILETS ARE LOCATED WITHIN MEADOW AREA, AN AREA OUTSIDE

OF THIS MEADOW IS TO BE USED FOR THE NEWLY INSTALLED TOILET.

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR PLASTIC MESH FENCE SECURED TO STEEL POSTS TO COMPLETELY

SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER MANUFACTURER'S INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL AND ABA

REQUIREMENTS. BACKFILL AROUND NEW BUILDINGS TO 95% COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES

INSTALL VAULT TOILET

SITE WORK

SITE WORK NOTES:

1. OPTION ITEM: CONSTRUCT DESIGNATED PARALLEL PARKING AREA ADJACENT TO TOILET (N). PARALLEL PARKING AREA SHOULD BE 12 FEET

MINIMUM WIDTH AND 240 FEET IN LENGTH. LOCATION OF PARKING AREA TO BE STAKED BY COR. CONTRACTOR TO CLEAR AND GRUB AREA ONCE

STAKED. GRADE TO MAXIMUM 5% SLOPE, COMPACT TO 90%.

2. OPTION ITEM: PLACE NATIVE ROCKS AND LOGS TO DELINEATE PARALLEL PARKING AREA, APPROX 250 LINEAR FEET. MATERIAL TO BE SOURCED

FROM SITE AND APPROVED BY COR PRIOR TO INSTALLATION. SEE SHEET D-01.

3. OPTION ITEM: PLACE NATIVE ROCKS AND LOGS TO DELINEATE MEADOW EDGE FROM ROAD AND PARKING AREA, APPROX 350 LINEAR FEET.

MATERIAL TO BE SOURCED FROM SITE AND APPROVED BY COR PRIOR TO INSTALLATION. SEE SHEET D-01.

4. OPTION ITEM: PLACE 5 CY OF

" MINUS AGGREGATE BASE AS SHOWN TO CREATE HARDENED PATH BETWEEN PARKING AREA AND TOILET.

COMPACT TO 90%.

Sand Flat 4WD Campground

To Camp Wolfeboro BSA

To HWY 4

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

PARALLEL PARKING 240' (OPTION ITEM)

AutoCAD SHX Text

PLACE LOGS AND BOULDERS TO PROTECT EDGE OF MEADOW (OPTION ITEM)

AutoCAD SHX Text

PLACE AND COMPACT 5 CY " 34" MINUS AB (OPTION ITEM)

AutoCAD SHX Text

DOUBLE VAULT TOILET

7N02

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:4

6 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\T

OI

LE

T

DE

SI

GN

_R

EC

OV

ER

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS DISTRICT

LODGEPOLE OVERFLOW

CAMPGROUND

(OPTION ITEM)

1/26/2023

N.THOMPSON

N.THOMPSON

T.H.,K.B.,J.N.

C-06 8 9

DEMOLISH RESTROOM STRUCTURE

DEMOLITION WORK NOTES:

1. CONTRACTOR TO DEMOLISH EXISTING RESTROOM STRUCTURE,

INCLUDING VAULT

2. PUMP (E) VAULT AND DISPOSE OF WASTEWATER PER REGULATORY

REQUIREMENTS

3. ALL DEBRIS TO BE REMOVED FROM FOREST SERVICE LANDS AND

DISPOSED OF IN A LANDFILL CERTIFIED FOR CONSTRUCTION DEBRIS

INSTALLATION WORK NOTES:

1. CONTRACTOR TO PREPARE INSTALLATION SITE FOR (1) TOILET UNITS

2. CONTRACTOR TO INSTALL 2-UNIT PREFABRICATED VAULT TOILET. THE

BUILDING SHALL:

2.1. WITHSTAND 250 PSF SNOW LOADING

2.2. HAVE HORIZONTAL LAP SIDING/RIVER ROCK EXTERIOR TEXTURED WALL

AND CEDAR SHAKE TEXTURED ROOF OR APPROVED EQUAL

2.3. HAVE A MINIMUM

ROOF PITCH

2.4. HAVE A CONCRETE PREFABRICATED UNIFORM VAULT WITH

POLYETHYLENE VAULT LINER INSERT, MINIMUM VOLUME OF 1000 GALLON

PER TOILET COMPARTMENT, AND A HINGED VAULT CLEANOUT LID ABLE

TO BE LOCKED WITH A PADLOCK

2.5. UNIT TO COME WITH OPTIONAL WASTEBASKETS, CHASE, SOLAR VENT

STACK FAN, VENT SCREEN, AND COMMERCIAL GRADE LOCKABLE

DOORKNOBS ALL KEYED THE SAME (SCHLAGE OR EQUAL). CONTRACTOR

SHALL PROVIDE 10 KEYS

2.6. INCORPORATE SWEET SMELLING TECHNOLOGY (SST) INTO THE DESIGN

OF THE VENTILATION SYSTEM

3. FINAL INSTALLATION INCLUDES REMOVING RIGGING HARDWARE, PATCHING

CONCRETE, SEALING JOINTS, AND COMPLETING ALL PREPARATION

NECESSARY FOR THE BUILDING TO BE OPEN FOR PUBLIC USE

4. TOILET SHALL BE INSTALLED ROUGHLY IN EXISTING FOOTPRINT -- LOCATION

TO BE STAKED BY COR. CONTRACTOR SHALL USE (E) VAULT DEPRESSION FOR

PLACING (1) UNIT WHEN APPLICABLE. REMOVE ADDITIONAL MATERIAL AS

NEEDED

5. EXCAVATIONS LEFT OPEN OVERNIGHT SHALL BE FENCED WITH WIRE OR

PLASTIC MESH FENCE SECURED TO STEEL POSTS TO COMPLETELY

SURROUND EXCAVATION

5.1. THE BOTTOM OF FENCE SHALL FOLLOW THE CONTOUR OF THE GROUND

5.2. MAXIMUM SPACING OF STEEL POSTS SHALL BE 8'

5.3. MINIMUM HEIGHT OF FENCE SHALL BE 36"

6. ALL NATIVE MATERIALS EXCAVATED SHALL BE STORED AT EACH SITE

7. UNIT SHALL BE PLACED AT GRADE SPECIFIED BY COR AND PER

MANUFACTURER'S INSTRUCTIONS IN ACCORDANCE WITH OPERATIONAL AND

ABA REQUIREMENTS. BACKFILL AROUND NEW BUILDINGS TO 95%

COMPACTION. GRADE TO DRAIN AWAY FROM BUILDINGS ON ALL SIDES

INSTALL VAULT TOILET

To Lake Alpine

ACCESSIBILITY

SITE WORK NOTES:

1. CREATE CONCRETE ADA COMPLIANT THRESHOLD AT ENTRANCE TO VAULT

TOILET. MINIMUM WIDTH 5', MAXIMUM CROSS SLOPE 2%

2. CONCRETE PER SPECIFICATIONS.

3. PROVIDE SMOOTH TRANSITION BETWEEN PATHWAY AND ENTRANCE INTO

VAULT TOILET.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

HWY 4

AutoCAD SHX Text 7N12Y

AutoCAD SHX Text 7N12Y

AutoCAD SHX Text

DOUBLE VAULT TOILET

ADA CONCRETE WALKWAY

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/7 /23

:3

5 N

IC

OL

ET

HO

MP

SO

N

C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

EN

GI

NE

ER

IN

G\

FY

C

ON

TR

AC

TS

\A

CC

ES

SI

BL

E

UP

GR

AD

E

- T

OI

LE

T

RE

PL

AC

EM

EN

T

- H

IG

H

SI

ER

RA

T

OI

LE

TS

ST

F\

DE

SI

GN

\C

OV

ER

SH

EE

T.

DW

G;

(R05)

PACIFIC SOUTHWEST REGION

ACCESSIBLE

UPGRADE -

TOILET

REPLACEMENT

(STF)

STANISLAUS NATIONAL

FOREST

CALAVERAS, SUMMIT/MIWOK

DETAILS

01/26/2023

N. THOMPSON

N. THOMPSON

T.H.,K.B.,J.N.

D-01 9 9

CONCRETE DETAILS

CONCRETE NOTES

1. REFER TO SPECIFICATION 03 30 10 CAST-IN-PLACE CONCRETE FOR MIX

REQUIREMENTS.

BOULDER AND LOG BARRIER DETAILS

AutoCAD SHX Text

ELEVATION VIEW (NTS) (NTS)

AutoCAD SHX Text

NATIVE SOIL

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

6X6 W1.4XW1.4 WWF AT MID-DEPTH

4" GRAVEL FILL COMPACTED AT 95%

Sheets and Views
Coversheet-Coversheet
Coversheet-Area Map
Coversheet-General Notes
Toilet Design_recover-Cascade Creek
Toilet Design_recover-Crabtree XC
Toilet Design_recover-Hermit Valley
Toilet Design_recover-Mosquito Lakes
Toilet Design_recover-Sand Flat 4WD
Toilet Design_recover-Lodgepole CG
Coversheet-Details
2023-03-20T10:08:52-0700
TIMOTHY HUGHES
2023-03-20T11:53:03-0700
RAYMOND CABLAYAN
2023-03-20T18:33:30-0700
JAMES JUNETTE
2023-03-22T07:24:36-0700
ELIZABETH MARTINEZ

File details come from the government source that posted it. Updated .