FY27ENGCP_003_2_CypressLakeRdBridgeProject_Q_.pdf
PDF 551 KB Posted
- Solicitation number
- PE-61600-NONST-2026-000000056
- Issued by
- Brooks County, Georgia
About this file
Summary of FY27ENGCP_003_2_CypressLakeRdBridgeProject
This is a project description and bid package document for the Bulloch County Board of Commissioners in Georgia regarding the FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project. The project encompasses comprehensive bridge construction services including demolition and removal of an existing damaged bridge structure at the Dry Branch Creek crossing on Cypress Lake Road, approximately 1,500 feet east of the intersection with Country Club Road (coordinates: Latitude 32.393779, Longitude -81.856229). Construction scope includes new bridge structure installation, roadway construction items such as embankment and subgrade construction, graded aggregate base construction, asphalt pavement construction, new approach slab construction, new guardrail installation, signing and marking, erosion and sediment control measures, water quality monitoring, and permanent grassing and stabilization. Sealed bids from GDOT Prequalified Contractors are due July 17, 2026, at 2:00 PM EDT to the Bulloch County Procurement Office. Bid packages may be requested via email at Procurementeng@bullochcounty.net, the Bulloch County website, or the Georgia Procurement Registry.
All contractors must submit evidence of current active approval as GDOT Prequalified Contractors in Work Class 500 Concrete Structures as verified in GDOT's Directory of Prequalified Contractors as of the bid submission deadline. Bidders are responsible for delivery of sealed bids during normal business hours to the Bulloch County Procurement Office, with original bids and one copy plus supporting documents required in a sealed, clearly marked envelope addressed to Peyton Fuller, Procurement Director. No specific pricing terms, funding amounts, or award information is detailed in the project description documentation provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06/25/2026 NOTICE OF SOLICITATION: INVITATION TO BID
#FY27-ENGCP-003-2 CYPRESS LAKE ROAD BRIDGE REPLACEMENT PROJECT
Bulloch County Board of Commissioners Engineering Department
DATE: 06/25/2026
PROJECT: FY27-ENGCP-003-2, Cypress Lake Road Bridge Replacement Project QUESTIONS/RESPONSES: Round 1
NO. QUESTION RESPONSE REMARKS
The bid due date is 07/17/2026, which happens to be the same date as the GDOT July-2026 Letting. With there being so many GDOT bids on 07/17/2026 would Bulloch County consider pushing back the bid due date to Friday 07/24/2026?
Yes. Bulloch County will revise the Bid Submission Deadline and Bid Opening Date to 07/24/2026. See forthcoming Addendum.
Final response.