FY26 HP-ITD NOFO.pdf

PDF 546 KB Posted

Attached to
FY2026 High Priority Program - Innovative Technology Deployment (HP-ITD)
Opportunity number
FM-MHP-26-002
Issued by

About this file

This is a Notice of Funding Opportunity (NOFO) for the High Priority – Innovative Technology Deployment (HP-ITD) Grant Program administered by the Federal Motor Carrier Safety Administration (FMCSA), U.S. Department of Transportation. The program provides grants to eligible States, the District of Columbia, Puerto Rico, Northern Mariana Islands, American Samoa, Guam, and the U.S. Virgin Islands to advance technological capabilities and deploy intelligent transportation system applications for commercial motor vehicle (CMV) operations. The total expected funding is $52.7 million for FY 2026, with approximately 35 awards anticipated. The maximum funding request per application is $2 million, though exceptional projects above this threshold may be submitted for FMCSA Administrator discretionary approval. Applications must be submitted electronically through Grants.gov by June 17, 2026, at 5 p.m. Eastern Time.

To be eligible, applicants must have an approved Program Plan/Top Level Design (PP/TLD) as outlined in the Fixing America's Surface Transportation (FAST) Act; certify that their CMV information systems and network deployment activities are consistent with national intelligent transportation systems architectures and standards; agree to execute interoperability tests developed by FMCSA; and either be the lead State agency for the PP/TLD or provide a Memorandum of Understanding with the ITD lead agency. The NOFO covers eligible activities in categories including Core Compliance (CVIEW development, credential automation, electronic vehicle identification), Truck Parking, Work Zone notifications, Federal and Vehicle Out-of-Service detection, Data Quality, electronic inspection capabilities, Enhanced Data Sharing, and FMCSA IT modernization. Applicants must submit detailed project narratives (limited to 35 pages total per application, with a maximum of four projects), budget narratives with itemized cost breakdowns, SF-424 and SF-424A forms, assurances, lobbying certifications, and an Indirect Cost Rate agreement if claiming indirect costs. No matching share or cost-sharing is required. Awards will be issued as grants or cooperative agreements following evaluation based on technical merit, budget cost analysis, program-specific criteria, past performance, and alignment with DOT Order 2100.7 on sound economic analysis. Post-award requirements include compliance with 2 CFR Part 200, Federal wage rate requirements, civil rights obligations including Title VI compliance, cybersecurity and resilience considerations, quarterly financial and performance reporting through GrantSolutions, and participation in program evaluations as determined by DOT.

FY26 HP-ITD NOFO

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGH-PRIORITY – INNOVATIVE TECHNOLOGY DEPLOYMENT

GRANT PROGRAM

NOTICE OF FUNDING OPPORTUNITY

Table of Contents

SECTION A – BASIC INFORMATION

SECTION B – ELIGIBILITY

SECTION C - PROGRAM DESCRIPTION

SECTION D - APPLICATION CONTENTS AND FORMAT

SECTION E - SUBMISSION REQUIREMENTS AND DEADLINES

SECTION F - APPLICATION REVIEW INFORMATION

SECTION G - AWARD NOTICES

SECTION H - POST-AWARD REQUIREMENTS AND ADMINISTRATION

SECTION I - OTHER INFORMATION

APPENDIX A – APPLICATION PACKAGE REQUIREMENT CHECKLIST .. 29

APPENDIX B – PROJECT NARRATIVE GUIDANCE

APPENDIX C – BUDGET NARRATIVE GUIDANCE

Page | 2

SECTION A – BASIC INFORMATION

Federal Agency Name: U.S. Department of Transportation (USDOT) Federal Motor Carrier Safety Administration (FMCSA) 1200 New Jersey Avenue SE West Building Washington, DC 20590

Funding Opportunity Title: High Priority Program – Innovative Technology Deployment Program (HP-ITD)

Announcement Type: Initial

Funding Opportunity Number: FM-MHP-26-002

Assistance Listing: 20.245

Funding Details:

Key Dates:

$52.7 million expected total amount to award

Application Due Date – June 17, 2026 5 p.m. Eastern Time

Executive Summary:

Eligible Applicants:

The objective of the HP-ITD program is to advance the technological capability and promote the deployment of intelligent transportation system applications for CMV operations, including CMV, commercial driver, and carrier-specific information systems and networks, and to support/maintain CMV information systems and networks to

(i) link Federal motor carrier safety information systems with State CMV systems; (ii) improve safety and productivity of CMVs and commercial drivers; (iii) and reduce costs associated with CMV operations and regulatory requirements.

States, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, American Samoa, Guam, and the U.S. Virgin Islands

Agency Contact Information:

Financial application concerns:

James Ross 202-960-5176 james.ross@dot.gov

Programmatic application concerns:

Quinton Lane 405-206-9104 Quinton.Lane@dot.gov (and cc FMCSAHPGrants@dot.gov) mailto:james.ross@dot.gov mailto:leroy.taylor@dot.gov mailto:FMCSAHPGrants@dot.gov

Page | 3

SECTION B – ELIGIBILITY

1 Eligible Applicants

1.1 General

The HP-ITD awards are available to States, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, American Samoa, Guam, and the U.S. Virgin Islands. FMCSA may award HP-ITD funds to eligible applicants that have an approved program plan as outlined in the Fixing America’s Surface Transportation (FAST) Act. Individuals and businesses are not eligible to apply for HP-ITD funding.

To be eligible for HP-ITD funding, the State applicant shall:

• Have a commercial motor vehicle information systems and networks program plan (the Program Plan/Top Level Design (PP/TLD)) approved by the Secretary that describes the various systems and networks at the State level that need to be refined, revised, upgraded, or built to accomplish deployment of commercial motor vehicle information systems and network capabilities;

• Certify that the State’s current PP/TLD was approved by the Secretary as outlined in FAST Act (Pub. L. No. 114-94);

• Certify to the Secretary that its commercial motor vehicle information systems and network deployment activities, including hardware procurement, software and system development, and infrastructure modifications:

• Are consistent with the national intelligent transportation systems and commercial motor vehicle information systems and networks architectures and available standards; and

• Promote interoperability and efficiency to the extent practicable.

• Agree to execute interoperability tests developed by FMCSA to verify that its systems conform with the national intelligent transportation systems architecture, applicable standards, and protocols for commercial motor vehicle information systems and networks; and

• Certify that the State agency is the lead agency responsible for the PP/TLD, or if it is not the State agency responsible for the PP/TLD, demonstrate that it has a Memorandum of Understanding (MOU), or other agreement with the ITD lead agency and confirm that the applicant has coordinated with the ITD lead agency regarding all projects requested in the application to ensure State-wide effectiveness and efficiency and to avoid any duplication of effort or other wastefulness in Federal funding initiatives.

2 Cost-Sharing and Matching Requirements FMCSA will not require a matching share for awards under this NOFO.

3 Other The below are specific items that must be completed for your application package to move forward to the Merit Review process. (See: Eligibility Criteria outlined in Section F.1) If one of these items is not fulfilled, the application will not be considered eligible.

Page | 4

A complete application includes:

• The application was submitted by the deadline.

• The application was submitted by an eligible applicant, as described in Section B.1.

• The application has a completed Federal Assistance (SF-424) form.

• The application has a completed Budget information for Non-Construction form (SF-424A).

• The application has a completed Assurances for Non-Construction form (SF-424B).

• The application has a completed grant.gov Certification Regarding Lobbying form.

• The application has a completed Lobbying activities (SF-LLL) form, if applicable.

• The application includes a complete Budget Narrative.

• The application includes a complete Project Narrative.

• The application’s projects support the purpose of the grant program and statutes.

NOTE: Do not include a copy of the PP/TLD in the application.

Page | 5

SECTION C - PROGRAM DESCRIPTION

1 Overview and Authorizing Statutes, Regulations and Order

The U.S. Department of Transportation’s (DOT) Federal Motor Carrier Safety Administration (FMCSA) announces the Fiscal Year (FY) 2026 High Priority - Innovative Technology Deployment (HP-ITD) grant program Notice of Funding Opportunity (NOFO), Funding Opportunity Number FM-MHP-26-002 , to solicit applications from eligible entities to support HP-ITD activities.

The Department seeks to fund projects that advance the priorities of this Administration as described in DOT’s mission statement and across executive orders. To the extent permitted by law and to the extent applicable, priority will be given to grant applications in accordance with DOT Order

2100.7 on Ensuring Reliance Upon Sound Economic Analysis in DOT’s Policies, Programs and Activities when evaluating applications and making award selection.

The HP grant program is governed by 49 U.S.C. § 31102(l)(3), as modified by Sections 23001(b) and 23003 through 23004 of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. No. 117-58 (2021), and 49 CFR Part 350.

For FY 2026, FMCSA anticipates awarding approximately $109.2 million combined under the HP-CMV and HP-Innovative Technology Deployment (HP-ITD) programs. The HP-CMV program will be advertised under a separate NOFO.

2 HP-ITD Goals and Objectives As the lead government agency responsible for the regulation and safety oversight of commercial motor vehicles (CMVs), FMCSA awards HP-ITD funds to support innovative and impactful projects that advance its mission to reduce crashes, injuries, and fatalities involving large trucks and buses.

The objective of the HP-ITD program is to advance the technological capability and promote the deployment of intelligent transportation system applications for CMV operations, including CMV, commercial driver, and carrier-specific information systems and networks, and to support and maintain CMV information systems and networks to (i) link Federal motor carrier safety information systems with State CMV systems; (ii) improve safety and productivity of CMVs and commercial drivers; (iii) and reduce costs associated with CMV operations and regulatory requirements.

HP-ITD awards may be used for the deployment of new and innovative advanced technology solutions that support CMV information systems and networks, for planning activities, including the development, or updating of program or top-level design plans in order to become eligible or maintain eligibility for the HP-ITD awards; and for the operation and maintenance costs associated with innovative technology.

This NOFO provides important information about the HP-ITD safety priorities, highlighting the critical information related to preparing and submitting an application.

3 HP-ITD Award Performance Goals and Indicators https://www.transportation.gov/mission/ensuring-reliance-upon-sound-economic-analysis-department-transportation-policies-programs https://www.transportation.gov/mission/ensuring-reliance-upon-sound-economic-analysis-department-transportation-policies-programs https://www.transportation.gov/mission/ensuring-reliance-upon-sound-economic-analysis-department-transportation-policies-programs https://www.govinfo.gov/content/pkg/USCODE-2022-title49/pdf/USCODE-2022-title49-subtitleVI-partB-chap311-subchapI-sec31102.pdf https://www.congress.gov/117/plaws/publ58/PLAW-117publ58.pdf https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-350

Page | 6

Applicants should include expected performance goals under the following subsections:

3.1 Sources of Data

FMCSA will measure the success of a HP-ITD award’s performance goals by examining data available in roadside inspection data collection systems, Commercial Vehicle Information Exchange Window (CVIEW), FMCSA’s Safety and Fitness Electronic Records (SAFER) database, Motor Carrier Management Information System (MCMIS), crash and safety statistics reported by the applicant, and any other data reported by the applicant for consideration.

3.2 Performance Indicators

FMCSA will also measure whether an HP-ITD award meets the performance goals outlined in the application by assessing performance indicators. In general, performance indicators of successful HP- ITD award projects may include, but are not limited to:

a. CMV Safety Improvement: Activities conducted under the HP-ITD award that demonstrate CMV safety and regulatory compliance using performance metrics, including out-of-service (OOS) carrier and vehicle detection rates using electronic screening systems.

Improvement of Data Sharing: HP-ITD award activities that enhance data quality among safety, credentialing, and screening systems. FMCSA promotes the sharing of program safety data across jurisdiction boundaries to ensure Federal and State regulatory compliance and the overall efficiency of CMV operations. FMCSA also monitors all ITD transaction data submitted to the SAFER system and publishes a monthly data quality report for use by all program jurisdictions.

b. Electronic Credentials Administration: States should be handling at least 10 percent of transaction volume electronically. The capability to accept both vehicle registration and fuel tax renewals online, with ability to extend that capability to other CMV credentials or permitting systems, is a core element of the ITD program.

In addition to the performance indicators above, all States (including other eligible applicants) have specific performance indicators tailored to their performance goals included in the State’s Program Plan/Top Level Design (PP/TLD). FMCSA approves each of these State PP/TLDs as part of grant eligibility. The PP/TLD is a technical document that provides management framework and system architecture to guide program deployment and to advise policy and decision makers regarding the funding and technical resources required for successful program implementation. The PP/TLD describes the various systems and networks at the State level that must be refined, revised, upgraded, or built to accomplish Core or Expanded capabilities. This PP/TLD is tailored to each State’s performance goals, projects to achieve those goals, performance indicators, and schedules and milestones. Grant applications should, where possible, relate their application performance goals to their currently approved PP/TLD.

Finally, performance indicators may vary based on the national priority outlined in Section C(4). If applicable, those performance indicators are more specifically addressed under the national priority descriptions.

4 National Priority Descriptions Below are descriptions of the programmatic activities listed in order of priority. The national priorities

Page | 7 support the HP-ITD goals and objectives.

All applications must advance a public purpose in accordance with 31 U.S. Code § 6101 and 6302-6304.

FMCSA may not use grants or cooperative agreements to acquire property or services for FMCSA’s or a pass-through entity's direct benefit or use.

Please note that additional information regarding cost eligibility may be found within the Motor Carrier Safety Assistance Program (MCSAP) Comprehensive Policy (MCP) Version 4.0. An electronic copy of the MCP may be found at: https://www.fmcsa.dot.gov/mission/grants/motor-carrier-safety-assistance-program-grant-comprehensive-policy.

Note: A project consists of one or more activities that work towards achieving a defined goal and objective(s). If an applicant chooses to propose multiple HP-ITD projects within a single application, each application must contain separate and distinct project subtitles, project narratives, budget narratives, and line-item budgets for each subproject proposed in that application. Additionally, each project should cross-reference the corresponding activity in the State’s approved PP/TLD.

Note: All Core ITD performance measures related to electronic safety information exchange, electronic screening, and electronic credential administration must be maintained for the State to remain Core-certified.

The applications received for HP-ITD projects will be given consideration for funding as follows:

4.1 HP-ITD Program Priorities

a. Core Compliance. Applications received from State agencies to meet Core compliance (as defined within Section 6 of the MCP), which include, but are not limited to, the following activities:

1. Projects that develop or update a PP/TLD that describes the various systems and networks that must be refined, revised, upgraded, or built to accomplish Core capabilities as defined in the MCP.

2. Projects that include the development of a CVIEW which houses the national SAFER database. CVIEW is a key mechanism to share CMV credential and safety information within the State and with other jurisdictions across the country. This interstate data exchange enables numerous critical safety programs to check for high-risk motor carriers and Federal OOS orders. This also provides real-time electronic screening of interstate vehicles for safety, International Fuel Tax Agreement (IFTA) status, International Registration Plan (IRP) compliance, oversize/overweight (OS/OW) permits, and other compliance information critical to a State’s safety program.

3. Projects that automate the application, processing, and issuance of commercial vehicle operating credentials, including IRP license renewals and IFTA license renewals/IFTA quarterly taxes.

4. Projects that electronically identify a commercial vehicle, verify its size, weight, and credentials information, and review its carrier’s past safety performance while the vehicle is in motion and then communicate safely to the driver to either pull in or bypass the roadside inspection station.

b. Truck Parking. Projects that safely demonstrate real-time dissemination to CMV drivers of parking space availability by using dynamic message signs, interactive voice recognition, smartphone app, or other proven technology.

c. Work Zone. Projects that deploy or maintain a work-zone, incident, or traffic queue electronic https://uscode.house.gov/view.xhtml?req=granuleid:USC-1999-title31-section6101&num=0&edition=1999 https://www.govinfo.gov/content/pkg/USCODE-2011-title31/html/USCODE-2011-title31-subtitleV-chap63-sec6302.htm https://www.fmcsa.dot.gov/mission/grants/motor-carrier-safety-assistance-program-grant-comprehensive-policy https://www.fmcsa.dot.gov/mission/grants/motor-carrier-safety-assistance-program-grant-comprehensive-policy

Page | 8 notification system that will inform the driver within the cab of the CMV of an active work zone, traffic congestion, or an incident ahead. This includes support that enables the sharing of real-time traffic data to existing roadway traffic advisory systems. The alerts must be designed or engineered to be safely broadcast through the CMVs’ transponders, electronic on-board systems, cell phones, and/or motor carrier routing and dispatching systems. Applications should consider using national work zone data exchange standards, such as Work Zone Data Exchange (WZDx) (https://ops.fhwa.dot.gov/wz/wzdx/index.htm) to detect vehicles under a Federal OOS Order and assure immediate and appropriate action by a Certified CMV Inspector.

d. Federal OOS Detection. Projects that deploy electronic screening technology to detect vehicles under a Federal OOS Order.

e. Vehicle OOS Detection. Projects that deploy electronic screening technology used in detecting vehicle OOS issues, including, but not limited to, inoperable, defective, or deficient brakes, tires, exhaust systems, or any defect that may cause an unsafe condition. This electronic screening technology would be used while the vehicle is in motion and would provide the ability to alert or provide an indicator to an electronic screening system.

f. Data Quality. Projects that improve credentialing data quality between the State and FMCSA’s SAFER system. Grant applications should include projects that ensure CVIEW systems capture updates sent to and from the SAFER system in real time, or near real time. Such applications should describe the performance measures used to ensure the accuracy and quality of the data exchanged, promote efficient system communication, and prevent system corruption or performance degradation, and have the functionality to link the electronic screening technology to inspection results.

g. Technologies associated with the deployment of electronic inspection capabilities.

Projects that implement technologies associated with the deployment of electronic inspection capabilities of CMVs, including CMV driver authentication, and sharing that inspection data with FMCSA’s SafeSpect system.

h. Enhanced Data Sharing. Applications that conduct a model deployment of enhanced data sharing via the CVIEW/SAFER interface amongst other jurisdictions that would minimize delays of safe and legal trucks as they cross State borders. Such data may include inspection, permitting, weight or other electronic screening results.

i. FMCSA IT modernization. Projects that implement or enhance technologies associated with FMCSA IT modernization initiatives. Grant applications should include projects that involve the enhancement of state- FMCSA network protocol and application credentials, adaptation of CVIEW or equivalent software to ensure seamless application interaction and information integrity.

4.2 Other ITD Program Priorities

Other typical projects and costs associated with HP-ITD funded by FMCSA are outlined Appendix H of the MCP (April 2026, Version 4.0).

Any innovative technology solutions meeting the goals established within the ITD program, but not listed in the MCP, may be submitted for consideration if the particular project is in the approved PP/TLD.

However, the presence of a project in an approved PP/TLD is not an indication that any funding requested for that project within an application will be automatically approved.

Page | 9

Applicants are required to outline evaluation activities as part of their grant projects.

Page | 10

SECTION D - APPLICATION CONTENTS AND FORMAT

1 Content and Form of Application Submission The application package must contain the elements listed below to be considered for an award.

1.1 Formatting

The application must follow the format and limitation guidance stated below.

a. Application must be prepared in 8 1/2 x 11-inch format.

b. Margins (Top, Bottom, Right and Left) no smaller than 1” on all pages (Header and Footer are allowed in the margins).

c. Time New Romans 12pt. font must be used for all text, including tables and graphs.

d. Application must be submitted in a format readable by Microsoft (MS) Word, Excel, or in text searchable PDF formats (as applicable).

e. The application narrative is limited to 35 total pages, even if more than one project is included.

FMCSA will not read or consider any materials beyond the specified page limit in the application review process. NOTE: The 35 total page limit is inclusive of the introduction, problem statement(s), performance objective(s), project/performance activity(s), performance measurement(s) plan, monitoring and reporting plan, and budget narrative. Submission of documentation and forms described in Appendix A will not count against the application page limit.

f. The application package must contain the elements listed in subsections 1.2 and 1.3 below and all applicable documentation described in Appendix A to be considered for an award. Appendix B contains budget narrative guidance.

g. The application shall not include more than four projects.

1.2 Project Narrative Section Requirements

Application project narrative packages are limited to 35 total pages. This requirement is per application, not per project. Submission of all required SF-forms, key contact, attachment forms, and indirect cost agreements do not count against the page limitation.

While supplemental attachments are allowed, the application’s project and budget narratives must include all required information. The project narrative sections must indicate when a supplemental attachment needs to be referenced.

To learn more about requirements and to assist with writing a successful narrative, please refer to the HP Grant Application Best Practices document, which includes examples of each section below.

The application must include the following sections in consecutive order for each of the proposed projects:

a. Brief Introduction – up to 5 pages maximum Provide a description of the purpose(s) for the project and reference the applicable priority(s) being met as described in Section C.4 - National Priority Descriptions. This section must include the intended outcome(s) of the proposed project.

https://ai.fmcsa.dot.gov/downloadFile.axd/HP_Best_Practices_20190628.pdf

Page | 11

b. Problem Statement – up to 5 pages maximum

Provide a qualitative and quantitative description which demonstrates the problem(s) the project will address. Include details on the performance data used to identify the problem and to establish the baseline. Requested projects for electronic safety screening technologies must include baseline violation data from previous years for requested location(s).

Applicants must include an objective data source, source date, and trend analysis; and also explain how the applicant collects, maintains, and analyzes the data. Data must include clear and concise information directly related to the problem(s). The required trend analysis must include the previous three-year performance metrics for the location of the identified problem(s), driver behaviors that contribute to the problem(s), and targeted location(s) (i.e., targeted State, county and/or county, highway and/or the mile markers involved).

c. Performance Objective - up to 5 pages maximum Provide a description of the applicant’s anticipated quantifiable objective(s) related to the problem statement. This can be measured in numbers, percentages, or other forms that accurately measure the outputs and outcomes the applicant anticipates will result from implementing the strategies and activities proposed. Objectives must be SMART: Specific, Measurable, Achievable, Realistic, and Time-bound.

Performance objectives must include an examining of data available in FMCSA’s information systems and/or other relevant and timely sources as provided by the applicant. Information on Performance and Registration Information Systems Management (PRISM) status, State Safety Data Quality ratings, crash and safety statistics may be found on FMCSA’s Analysis & Information website https://ai.fmcsa.dot.gov. Specific performance indicators may vary based on the national priority as listed in Section C.4. Applicants should carefully review this information.

d. Performance Activity Plan - up to 5 pages maximum Provide a description of the activities the applicant will conduct to help mitigate the identified problem(s), achieve the performance objective(s) and outcome(s). The description must include specific enforcement strategies which will be used to reduce the problem identified in the problem statement.

Information must include: (1) Personnel summary inclusive of the number of personnel assigned to the project, their percentage of time dedicated to the project and total number of hours needed to complete the project; (2) Level of effort summary inclusive of the number and frequency of activities, number of enforcement details; (3) A project timeline including dates, tasks, milestones, and project end-date associated with meeting the performance objectives; and (4) Requested projects for electronic safety screening technologies should also include baseline violation data and metrics for collecting violations data after implementation for each identified location(s). This data must be readily available and reported to FMCSA ITD Program Office.

e. Performance Measurement Plan- up to 5 pages maximum Provide a description of how the applicant determined the data that will measure progress towards achieving the performance objective(s) goal. The measurements must be quantifiable with measurable outcomes and outputs. The measures must include specific targets/benchmarks that can be reported on in the quarterly progress report, if practicable, or as annual outcomes that will gauge the progress being made on achieving the objectives and activities identified for each project.

f. Monitoring and Timeline/Milestone Plan - up to 5 pages maximum Provide a description of the applicant’s method for ongoing monitoring of the progress of the project. This should include who will conduct the monitoring, the frequency with which it will be

Page | 12 carried out, and how and to whom reports will be made.

Each report must provide concise statements concerning activities relevant to the project, including activity and performance metrics directly relating to the performance of grant activities during that period. Applicants must state as specifically as possible, what metrics they anticipate reporting within this section of their application. Applicants should also detail the types and frequencies of enforcement actions taken when a commercial carrier/vehicle has been identified for inspection by the Inspection Selection System score.

g. Budget Narrative - up to 5 pages maximum Provide a description, by budget category (object class), that details the costs necessary to complete the proposed projects. A well-written budget narrative ensures that the applicant has properly documented proposed costs. In order to allow reviewers to evaluate the reasonableness, necessity, and allocability of all costs, budget narratives must include budget justifications broken out by individual objectives. The level of detail must be sufficient to justify the funding requested. Please do not give bundled cost for expenses such as travel, equipment, supplies, conferences, etc. For example, travel cost must be broken out to show per person itemized cost of airfare, lodging, miles, etc.

Each project must have its own budget narrative which matches the SF-424A Budget Categories Columns for each project. DO NOT include cents for Federal costs on the SF- 424, SF-424A, and budget narrative.

The budget narrative must reflect the allocability of project activities to the grant. Budgets must reflect the appropriate Federal amounts, as stated under the priorities in Section C.4. FMCSA may adjust the applicant’s budget, which will require an updated SF-424, SF- 424A, and budget narrative to be provided post award.

For instructions on completing the SF-424 and SF-424A, please go to Grants.gov, https://www.grants.gov/forms/forms-repository/sf-424-family.

SF-424 and SF-424A forms below provides exceptions to the instructions and highlights key areas of the form.

Budget narrative template is included with the HP-ITD application package on Grants.gov.

Applicants are strongly encouraged to use the template to aid with developing a responsive budget narrative.

Please refer to the following links for additional information:

• MCP Appendix H - High Priority-ITD Cost Eligibility Table

• FMCSA's HP-ITD Best Practices Guide

1.3 SF-424 and SF-424A forms

SF-424, Item (8), Entry (f) – Must reflect the first and last name (required); prefix, middle name, suffix, title. The individual listed here is designated by the applicant entity as the point of contact (POC) for matters involving this application. It is critical that the applicant correctly designate and list its intended POC, in addition to the authorized representative/signatory listed under Item (21), as these names will be used to generate the Notice of Grant Agreement (NGA).

SF-424, Item (12) – Must reflect the Funding Opportunity Number and title of the opportunity under which assistance is requested, as found in the program announcement.

SF-424, Item (18) – Entry (a) – Must reflect the total estimated Federal funding requested to complete the project plan. As no match/cost sharing is required under this NOFO, enter “0” in Entry (b). Entry

(g) must equal the total project amount, which is the sum of entries (a) and (b). The value of in-kind http://www.grants.gov/forms/forms-repository/sf-424-family https://ai.fmcsa.dot.gov/downloadFile.axd/HP-ITD-Best-Practices.pdf

Page | 13 contributions should be included on the appropriate lines, as applicable. All costs must be rounded to the nearest whole dollar amount.

SF-424A, Section A - Budget Summary – Must reflect the Federal share in column (e), and the total cost per project in column (g). Each project in the application should be shown on lines (1) through (4), as applicable with the total for each column on line 5. Note line 5 columns (e), (f), and (g) must reconcile with SF-424 field 18, as described above. All costs must be rounded to the nearest whole dollar amount.

SF-424A, Section B - Budget Categories - Capture the total amount per object class categories, as applicable. In columns (1) through (4), enter the titles, that match narrative title, for each of the proposed projects that match the title in Section A and the project plan.

Please note, the SF-424A covers the life of the project costs, and not just the first year (as stipulated in the SF-424A instructions). Section B must be completed. All costs must be rounded to the nearest whole dollar amount.

1.4 Requirements when One or More Projects are Proposed

A project consists of one or more of the priorities described in Section(C.4) - National Priority Descriptions, which work towards achieving a defined objective(s). If an applicant chooses to propose multiple projects within a single application, each project must contain separate and distinct project narratives, budget narratives, line-item budgets, and titles for each project proposed within that application package. The maximum 35-page limit also applies if multiple projects are included.

When there are multiple projects, each project must include the following sections in consecutive order:

Brief Introduction, Problem Statement, Performance Objectives, Project/Performance Activity Plan, Performance Measurement Plan, Monitoring and Reporting Plan, and Budget Narrative. For example, with multiple projects, project 1 includes the above sections in consecutive order, followed by project 2 including the above sections in consecutive order.

Applications with multiple projects must also contain a comprehensive or summary budget that includes expenses per project/per line item. The comprehensive budget must match the application’s SF-424 and SF-424a.

A HP-ITD application shall not include more than four (4) projects. FMCSA will not review or consider any projects beyond the maximum four projects per application. An applicant may submit more than one grant application under this program.

1.5 Guidance for Submitting Multiple Applications from One

Applicant

An applicant may submit more than one grant application under this NOFO. Applicants that submit more than one application (for different projects) are strongly encouraged to include a priority ranking list of the submitted applications with each application package submitted. Each application name should be distinguished by a unique overall application project title. Please include this information in the Introduction section of the Project Narrative, if it does not interfere with the 35-page limit; otherwise, please include it in a supplemental attachment.

1.6 Grant Funds, Sources and Uses of Project Funds

Page | 14

This budget must list the amount and percent of both the total Federal funding requested and any additional non-Federal funds, if any, that will be used to complete the project.

Page | 15

SECTION E - SUBMISSION REQUIREMENTS AND DEADLINES

1 Address to Request Application Package Potential applicants may obtain all forms included in this Notice at www.grants.gov.

If you require paper copies of materials, you may request copies at:

Email: FMCSA_GrantMgmtHelpdesk@dot.gov

Mail: U. S. Department of Transportation Federal Motor Carrier Safety Administration Grants Management Office (MC-BG) 1200 New Jersey Ave, SE Washington, DC 20590

2 Questions about the NOFO

For questions about this NOFO, please contact FMCSA’s Grants Management Office:

Email: FMCSA_GrantMgmtHelpdesk@dot.gov

Mail: U. S. Department of Transportation Federal Motor Carrier Safety Administration Grants Management Office (MC-BG) 1200 New Jersey Ave, SE, West Building Washington, DC 20590

Office hours: 9 a.m.to 5 p.m., Eastern Time Monday through Friday, except Federal holidays.

3 Unique Entity Identifier and System for Award Management (SAM)

The applicant must:

• Be registered in the System for Award Management (SAM) before submitting an application at https://www.sam.gov;

• Obtain and use a unique entity identifier (UEI) created in SAM.gov; and

• Accept the financial assistance certifications and representations required for (non-Federal entities) during the SAM.gov registration and/or renewal process per 2 CFR § 200.209.

The applicant must maintain an active SAM registration with current information at all times during which it has an active Federal award or an application under consideration. To remain registered in the SAM database after the initial registration, the applicant is required to review and update the registration http://www.grants.gov/ mailto:FMCSA_GrantMgmtHelpdesk@dot.gov mailto:FMCSA_GrantMgmtHelpdesk@dot.gov http://www.sam.gov/

Page | 16 at least every 12 months from the date of initial registration or subsequently update its information in the SAM database to ensure it is current, accurate, and complete.

If an applicant has not fully complied with these requirements by the time FMCSA is ready to make a Federal award, FMCSA may determine that the applicant is not qualified to receive a Federal award and use that determination as a basis for making a Federal award to another applicant.

4 Submission Dates and Times

4.1 Deadline

FULL AND COMPLETE APPLICATIONS FOR HP-ITD Financial Assistance ARE DUE ON June 17, 2026 by 5 p.m. Eastern Time. Once Grants.gov has received your submission, you will receive email messages to advise you of the progress of your application through the system. Over the next two business days, you should receive two emails: 1) confirming application receipt by the Grants.gov system; and 2) indicating that the application has either been successfully validated by Grants.gov prior to transmission to FMCSA or has been rejected due to errors. The applicant assumes all responsibility for a timely and complete application submission. Learn more about the grant application process on https://www.grants.gov/.

4.2 Consideration of Applications

Only applicants who comply with all submission deadline requirements described in this NOFO and electronically submit valid applications through Grants.gov will be eligible for consideration of award.

Applicants are strongly encouraged to make submissions well in advance of the deadline.

4.3 Late Applications

FMCSA will not consider a late application except under extraordinary circumstances. A late application will be accepted only if there is a large-scale natural disaster or a significant Grants.gov system issue that threatens the timely submission of a grant application. Problems with computer systems at the applicant organization (excluding verified cyber-attacks), failure to follow the application instructions, or failure to submit or complete the program application or complete required registrations by the submission deadline are not considered extraordinary circumstances.

5 Intergovernmental Review The HP Program and this funding opportunity are subject to Executive Order 12372, “Intergovernmental Review of Federal Programs.” The States with a Single Point of Contact (SPOC) and therefore a requirement to comply with E.O. 12372 are listed at the Office of Management and Budget's Web site:

https://www.whitehouse.gov/omb/.

6 Funding and Number of Awards FMCSA anticipates making approximately 35 awards resulting from this NOFO. FMCSA anticipates awarding approximately $52.7 million in total during FY 2026. The HP funding pool includes appropriations from the General Fund (Section J from IIJA) as well as the Highway Trust Fund. Please note that the exact amount is not specified as funding is shared with the HP Commercial Motor Vehicle Grant Program. FMCSA reserves the right to allocate additional funds for awards based on the volume and quality of applications. Awards under the HP-ITD program are subject to funding availability.

https://www.grants.gov/ https://www.federalregister.gov/executive-order/12372 http://www.whitehouse.gov/omb/

Page | 17

The maximum HP-ITD funding request for each application is $2 million. Applications with an exceptional project(s) above the $2 million threshold may be submitted for consideration; however, the project must demonstrate a significant impact to reducing crashes, and approval is at the discretion of the FMCSA Administrator, following technical evaluations and recommendations.

7 Type of Award Awards under this NOFO will be issued as a grant or cooperative agreement. FMCSA will determine the appropriate award type based on the proposed project and the degree of Federal involvement.

These award types are for new FMCSA awards only. Applications for renewal or supplementation of existing awards are not eligible.

8 Period of Performance The period of performance begins upon the date of a properly executed grant agreement in the Federal fiscal year in which the award is made plus four additional fiscal years. For the application, all applicants should plan for a four-year timeframe. FMCSA and recipients can make adjustments after award selection, as appropriate.

9 Degree of Federal Involvement

9.1 Cooperative Agreement

In accordance with 31 U.S.C. § 6305, FMCSA will award a cooperative agreement when substantial involvement between FMCSA and the recipient is anticipated when carrying out the activity.

Under a cooperative agreement, FMCSA may assign a FMCSA subject matter expert to: provide technical assistance to the recipient; assist with the exchange of ideas and information as necessary and permissible; and perform other actions relating to the monitoring of performance activities under the award.

The recipient also agrees to designate a project manager or key point of contact to work with FMCSA and act as a liaison between the awardee and the Federal Government.

FMCSA will further outline the nature of Federal involvement at the time of award and include additional details, as relevant, in the award documentation.

9.2 Grant

FMCSA will award a grant when substantial Federal involvement is not expected when carrying out the activity outlined in the agreement. FMCSA provides financial assistance, technical assistance, and oversight. Grant recipients provide the effort and expertise necessary to carry out the approved activities to improve CMV safety.

Grant recipients are responsible for performing the work and achieving the outcomes described in their grant award, complying with the grant requirements laid out in the grant award’s terms and conditions, local administration of the grant, and monitoring and oversight of any sub-recipients and/or sub-contractors.

https://www.govinfo.gov/app/details/USCODE-2020-title31/USCODE-2020-title31-subtitleV-chap63-sec6305

Page | 18

10 Funding Restrictions HP funds are awarded through a competitive evaluation process and are not guaranteed. All funding decisions will be made based on meeting the requirements of the NOFO, FMCSA’s HP national priorities, and the merits of the respective applications.

All cost elements of an application must be necessary, reasonable, allocable, and allowable to accomplish the objective(s) of the project. Cost eligibility standards are described in the applicable cost principles and administrative requirements:

• 2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, and;

• FMCSA’s MCP, as revised.

In accordance with the provisions of 49 CFR 350.415 and 350.417 and the Federal Uniform Administrative Requirements Cost Principles, additional guidance on eligible expenses under HP is included in the MCP. The eligibility of all expenditures is subject to review by FMCSA.

FMCSA is not obligated to approve costs incurred outside the award period of performance. These costs are incurred at the sole risk of the applicant and impose no obligation on FMCSA to make an award or to increase the amount of the approved budget. Pre-award costs are not eligible for reimbursement.

FMCSA will not provide reimbursement for indirect costs (IDC) if an approved indirect cost rate (IDC) agreement was not in place for the period of time the indirect cost expenses were incurred. If claiming indirect cost charges, the grant recipient must include an active approved IDC agreement with the application submitted for funding. Should the grant recipient fail to provide an approved agreement during the pre-award phase and a grant is awarded, the grant recipient will have 90 days from the date of award acceptance to provide a copy of the IDC agreement. If we do not receive the required documentation within the allocated time frame, the grant recipient will not be reimbursed for indirect costs for that fiscal year. Once an approved rate is provided to FMCSA, the grant recipient will then, be allowed to claim indirect costs for the specified budget period(s), per 2 CFR § 200.414(c).

Any non–Federal entity that does not have a current negotiated (including provisional) rate, except for those non–Federal entities described in Appendix VII of 2 CFR Part 200, may elect to charge a de minimis rate of 15% of modified total direct costs, which may be used indefinitely. No documentation is required to justify the 15% de minimis indirect cost rate. 2 CFR § 200.414(f).

All FMCSA grant programs are cost reimbursable, which means that grant recipients must first incur costs before submitting a request for reimbursement to FMCSA for costs associated with approved activities identified in the grant agreement. Recipients will be reimbursed by FMCSA for actual costs incurred provided that the costs are reasonable, approved, allowable, and allocable in accordance with the OMB regulations and FMCSA policy, within the approved budget, and supported by documentation.

Recipients must request reimbursement at least once each quarter.

Consistent with 2 CFR § 200.4582 CFR § 200.458, as applicable, FMCSA will only approve pre-award costs if such costs are incurred pursuant to the negotiation and in anticipation of the cooperative agreement and if such costs are necessary for efficient and timely performance of the scope of work.

Under 2 CFR § 200.458, grant recipients must seek written approval from FMCSA for pre-award https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200?toc=1 https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-350/subpart-D/section-350.415 https://www.ecfr.gov/current/title-49/subtitle-B/chapter-III/subchapter-B/part-350/subpart-D/section-350.417 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRd93f2a98b1f6455/section-200.414 https://www.govinfo.gov/app/details/CFR-2017-title2-vol1/CFR-2017-title2-vol1-part200-appVII https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRd93f2a98b1f6455/section-200.414 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRed1f39f9b3d4e72/section-200.458 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRed1f39f9b3d4e72/section-200.458 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRed1f39f9b3d4e72/section-200.458

Page | 19 activities to be eligible for reimbursement under the grant. Activities initiated prior to the execution of a grant or without FMCSA’s written approval will not be ineligible for reimbursement.

Grant recipients must submit requests for reimbursement electronically through the Delphi eInvoicing System (iSupplier). Additional information is available at: https://einvoice.esc.gov/.

FMCSA will not provide reimbursement for salary-related bonus payments, either as a direct or indirect cost. Bonus costs are not a necessary expense under FMCSA awards. See 2 CFR 200.403-405.

11 Other Submission Requirements Applications must only be submitted electronically via https://www.Grants.gov as described above in this section. In the event of system problems or technical difficulties with the application submittal, please call Grants.gov at 1-800-518-4726 or e-mail support@grants.gov 24 hours a day, 7 days a week (closed on federal holidays).

To submit an application through Grants.gov, applicants must:

• Follow the login process as described on Grants.gov, using the Login.gov option.

• Establish an E-Business point of contact (POC) in order to respond to the registration emails.

• Establish at least one Authorized Organization Representative (AOR).

Please note the registration process in Grants.gov usually takes 2 - 4 business weeks to complete.

FMCSA will not consider late applications due to failure to register or comply with Grants.gov requirements.

11.1 Sharing of Application Information

The Department may share application information within the Department or with other Federal agencies if the Department determines that sharing is relevant to the respective program’s objectives.

https://einvoice.esc.gov/ https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRea20080eff2ea53/section-200.403 http://www.grants.gov/ mailto:support@grants.gov

Page | 20

SECTION F - APPLICATION REVIEW INFORMATION

1 Criteria

1.1 Eligibility Criteria

All applications received by the due date will undergo an initial intake review to determine if the application is eligible. In addition to the eligibility criteria under Section B, FMCSA will review the application for the below criteria.

Eligibility Criteria:

1. Was the application submitted by the deadline?

2. Was the application submitted by an eligible applicant?

3. Is this application a duplicate submission as confirmed by the applicant?

4. Was the Application for Federal Assistance (SF-424) completed?

5. Was the Budget information for Non-Construction form (SF-424A) completed?

6. Was the Assurances for Non-Construction form (SF-424B) completed?

7. Was the Grants.gov Certification Regarding Lobbying form completed?

8. Was the Disclosure of Lobbying activities form (SF-LLL) completed?

9. Do the Key Contact forms include Principal Investigator/Program Director and Authorized Organization Representative contact information?

10. If applicable, was a current Indirect Cost Rate agreement included in the application?

11. For each project, does the application include a complete Budget Narrative? If not, specify the project(s).

12. For each project, does the application include a complete Project Narrative? If not, specify the project(s).

13. Does the project support the purpose of the ITD grant program and statutes?

14. Does the application include a Title VI Program Compliance Plan (including FMCSA Title VI Program Assurance) reviewed and approved by FMCSA’s Office of Civil Rights for the current Federal Fiscal Year? If not, please contact FMCSA’s Office of Civil Rights to coordinate the development/update of a Title VI Program Compliance Plan for its’ review/approval for the current Federal Fiscal Year as soon as possible.

Please note that absence of this document in the funding application will not delay FMCSA’s Intake Review of the funding application.

Page | 21

1.2 Merit Evaluation Criteria

FMCSA subject matter experts will review all eligible applications using the following Merit Evaluation Criteria: Technical Merit Criteria; Budget Cost Analysis Criteria; Program-Specific Criteria; Past Performance Criteria; and Other Review Information.

1.1.1 Technical Merit

The criteria are related to the technical/programmatic merit of an application. FMCSA will consider the extent to which the applications, including projects:

1. Describe an ITD program that will meet the stated objectives of the NOFO to support innovative and impactful projects that advance FMCSA’s mission to reduce crashes, injuries, and fatalities involving large trucks and buses, and achieve the other listed goals of the program;

2. Include components that address specific…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .