This document consists of a scope of work and general notes for the reconstruction of Forest Road 133 located in the Marienville Ranger District of the Allegheny National Forest in Pennsylvania. The project includes the removal and installation of drainage culverts, reconditioning the roadway template and drainage features, placing and compacting road base and surface aggregates, and seeding and mulching all disturbed areas. General notes specify requirements for utility locates, limestone materials, road maintenance during hauling, culvert cleaning and repair, traffic control signage, road grading, soil spreading and revegetation, material stockpiling, stream crossing protections, and load limits for a bridge. The related federal contract opportunity is being solicited by the US Department of Agriculture Forest Service for the road reconstruction work defined in the scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12445521B0002_PreBidMeeting_Notes 06152021.docx | DOCX document | |
| UPDATED_Bid Schedule06162021.docx | DOCX document | |
| 133Map.pdf | ||
| 12445521B0002 FR 133 ReConstruction_IFB_.docx | DOCX document | |
| 12445521B0002 SF 1442.pdf | ||
| Wage Decision pa2.txt | TXT text file | |
| FR133_WorkDescription.pdf | ||
| FR133_FP14_FSSS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021 ALLEGHENY NATIONAL FOREST – MARIENVILLE RANGER DISTRICT – FR 133 RECONSTRUCTION
ROAD WORK SUMMARY
A. ROAD WORK
Reconstruction: Forest Road 133 Location: Marienville Ranger District Intersection: Water Street x Scenic Drive Coordinates: 41.728030, -78.947866
Directions: From the Allegheny National Forest Supervisor’s Office (4 Farm Colony Drive, Warren PA 16365). Turn right on US-62 S. Follow US-62 S/Market St. and US-6 E to T314/Water St. in Hamilton Township for 24 miles. Continue on T314/Water St. to Scenic Drive. Scenic Drive ends and FR 133 begins and the center of the railroad tracks.
General:
All work will be completed in accordance with Project Specification and work descriptions. The work includes: all labor, material and equipment necessary to perform all operations for the work specified in the Project Specification and work descriptions. All work performed will be completed according to the Standard Specification for Roads and Bridges on Federal Highway Projects FP-14, and the Forest Service Supplemental Specification to the FP-14 included as part of this contract.
Scope of Work:
This project consists of completing road maintenance and reconstruction items. To include:
1. Removal and installation of new and existing drainage culverts.
2. Reconditioning the roadway template and reconstructing all drainage features including ditch lines, culvert inlets/outlets, tail ditches and lead outs.
3. Placing and compacting road base and surface aggregates.
4. Seeding and mulching all disturbed areas.
2021 ALLEGHENY NATIONAL FOREST – MARIENVILLE RANGER DISTRICT – FR 133 RECONSTRUCTION
GENERAL NOTES
-Prior to any earth disturbing activities, contractor shall call the Pennsylvania One Call System (800-242-1776) and all Oil & Gas Operators in the work area to determine locations of any underground utility lines.
-All limestone material should have CaCO3 content of 83%.
-Contractor is responsible for maintenance of all Forest Service roads over which pit run or commercial stone material is hauled. Roads shall be bladed or shaped to restore travel way to the condition found prior to haul.
-Culvert cleaning and repair will be considered incidental to road reconditioning.
-Contractor shall install “ROAD CLOSED, TRUCK TRAFFIC and ROAD CONSTRUCTION AHEAD” signs on all roads worked on in this project. Signs shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Contractor’s sign plan must be approved by Forest Service prior to work. Signs will be covered on weekends, holidays and any days when contractor is not working.
-Roads shall be completed in such a manner that water shall not pond on roadbed or in ditch lines.
-All removed corrugated metal pipe culverts shall be hauled off Federal lands and become the property of the contractor, unless otherwise indicated for salvage. Steel pipe casings shall be returned to Sheffield Work Center unless otherwise directed by Engineer.
-Contouring, topsoil re-spreading, seeding and mulching of disturbed areas as determined by the Forest Service is required.
-DSA Limestone shall be shipped at optimum moisture content not exceeding 15%. Limestone loads that fail field test parameters will be rejected.
-When replacing culverts in live streams, contractor shall install silt fence and straw bales at approaches to live stream crossings to eliminate sediment in the stream course. When culverts are located on High Quality and Exceptional Value streams, contractor shall install compost filter socks. Any sediments collected will be removed and ground will be stabilized with seed and mulch. Dewatering pups will be used to redirect water out of stream course at the time of stream crossing installation. Silt fence and straw bales will be removed only after vegetation is clearly re-established as determined by the Engineer.
-Roadway sod encountered during road reconditioning operations will be spread and leveled outside road template avoiding piles. Natural terrain depressions and opening are the preferred waste locations.
Seeding and mulching may be required to supplement natural revegetation.
-Aggregate stockpiled for culver replacement will be located on the existing road surface to assure maximum utilization of the material and eliminate disturbance of existing vegetated areas.
-Contractor shall install silt fence and straw bales at live stream crossings to eliminate sediment in the stream course. Any sediment collected will be removed and stabilized with seed and mulch.
-The bridge at MP 3.93 has a weight limit of 6 tons. Contractor will need to coordinate mobilization and haul accordingly.
Jo Jo
Ludlow
Kane
Sheffield
¬«SR6
FR 133 LUDLOW JOJO
FR 133 RECONSTRUCTION
Legend Basic Ownership
Forest Service Ownership Non-FS Ownership Populated Place
Roads Municipal Road Forest Road Other Road Decommissioned
FR 133
ALLEGHENY NATIONAL FOREST
LOCATION MAP
KANE
SHEFFIELD
WARREN
DATE: 01/08/2021
CREATED BY: AMP
0 1 2 3 40.5 Miles
1:75,000
| ROAD WORK SUMMARY |