Q-A 3.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- FP1024054
About this file
This is a Questions and Answers document for Solicitation FP1024054, which addresses clarifications on the construction of a 40' x 60' prefabricated metal building at Vance Air Force Base, Oklahoma. The Q&A file contains seven questions and corresponding responses that provide technical guidance on project requirements and specifications.
Key clarifications include: intumescent coating is not required on spray foam as walls do not need to be fire-rated per the International Building Code; liner panels are not required per the Statement of Work; silt fence requirements and maintenance are referenced in SOW Section 1.04.G with location details on plan sheet CS101; spoils from excavation may be placed on an adjacent lot northeast of the construction site or as directed by the ASRC Construction Manager; concrete mix requirements for drives and sidewalks are specified in Appendices B and C; tree removal is permanent with no replacement requirement; and Metal-Clad (MC) cable is permitted for electric unit heaters only, while outlets and light fixtures must use standard conduit as specified in the SOW. These responses provide offerors with essential technical details necessary for accurate proposal development and cost estimation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q-A 1.xlsx | XLSX spreadsheet | |
| Q-A 2.xlsx | XLSX spreadsheet | |
| Q-A 4.xlsx | XLSX spreadsheet | |
| Insurance Provisions - Vendor Requirements 2024.docx | DOCX document | |
| Sign in Sheet Metal Bldg.pdf | ||
| FP1024054 SoW Package - F5067 Construct Metal Building.pdf | ||
| Q-A.xlsx | XLSX spreadsheet | |
| Vendor Authorization Request Template 1.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questionnaire
| COMMENT / QUESTION FORM |
| Project ID: FP1024054 Construct Metal Building |
| All submitted questions will be added to this document once received and reviewed by the requester. Once questions are answered, they will be posted by the indicated date. |
| Question # | Reference Document | Question | Response |
| 1 | Will intumescent coating be required to be applied on the spray foam for this project? | The Walls do not need intumescent coating. The IBC does not require the walls to be fire rated. | |
| 2 | Will liner panels be required for the interior of the building? If so, 8’ liner panels or full height? | Liner panels are not required per the SOW. | |
| 3 | What are the silt fence requirements? Will there be an erosion control plan? Are there any inlets that will need to be protected? | Refer to SOW, Section 1.04.G for silt fence requirements. The contractor will be responsible for maintaining the silt fence during duratin of this project and ensure that it remains in place after a storm event. The silt fence will need to be repaired, placed back after a weather event. Refer to plan sheet CS101 Conceptual Site Plan for location of storm drain manholes. No inlets on the job site. | |
| 4 | Is there a borrow pit nearby with adequate soil if needed? Where will the spoils need to be hauled to? | No borrow pit onsite suitable for select fill. Spoils can be placed on adjacent lot northeast of construction site, or as directed by the ASRC Construction Manager. | |
| 5 | What are the concrete mix requirements for the drive and sidewalks? | Refer to Appendix B- Specifications, and Appendix C-Drawings. | |
| 6 | For the tree removal, will the tree need to be removed from base permanently or is there a place on base that will need to be disposed? Is there a requirement to replace the tree. | The tree will be removed permanently and there is no requirement to plant a new tree. | |
| 7 | Can MC (metal clad cable) be used for devices located in the ceilings and walls or is it required to be all conduit? | Metal-Clad (MC) cable can be used for the electric unit heaters. But outlets and light fixtures are to be standard conduit as specified in the SOW |