First_Article_Requirements.pdf

PDF 146 KB Posted

Attached to
C-130 Electrical Control Panel/Intercommunication Set Control C-6567/AIC-25
Solicitation number
SPRWA125R0005
Issued by

About this file

This is a First Article Requirements form (AFMC IMT 260) detailing the testing and approval requirements for NSN 1680014111338LG, requiring 2 first article units that will be part of the production quantity and serve as a manufacturing standard. The contractor is responsible for testing, with a test plan due 45 calendar days from contract date and test report required within 45 days.

The first article delivery is due within 120 calendar days of contract award to DLA Central Receiving at Robins AFB, with 14 days advance notification required before shipment. The government will provide approval/disapproval within 90 days of receipt. Approved articles will be forwarded to USAF supply while disapproved articles will be returned to the contractor. The estimated cost of government testing/inspection evaluation is $10,026. The cognizant engineering organization responsible for approving and conducting tests is Christopher Hardaway from the 409 C130/EN B unit. First article testing will not be waived, though there are provisions for waiver if less than 60 months have elapsed since completion of a previous contract.

View the file

Other files

File Type Posted
SPRWA125R0005 Q and A 11 March 2025.docx DOCX document
SPRWA125R0005 Amd 02.pdf PDF
FAT NSN 1680014111338.docx DOCX document
SPRWA1-25-R-0005 AMD 01.pdf PDF
SPRWA1-25-R-0005.pdf PDF
FD20602500141 CDRLs A001-A005 Combined.pdf PDF
Packaging Requirements.pdf PDF
Trans Requirement.pdf PDF
ENGINEERING DATA LIST.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

02 JAN 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

98897 / 3341091-1

4. NSN

1680014111338LG

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM item

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

FAT NSN 1680-01-411-1338.docx

B. The detailed technical requirements for First Article approval tests are contained in

FAT NSN 1680-01-411-1338.docx

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

409 SCMS/GUEA/C-130 Avionics Engineering

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

Christopher Hardaway

235 Byron St., STE 19A

Robins AFB, 31098 christopher.hardaway@us.af.mil

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

DI-NDTI-80809B

DI-NDTI-80566A

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 3Generated by PRPS using Jasper Reports on 13 Feb 2025

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 120 calendar days from date contract.

(2) Notify 14 calendar days prior to shipment.

(3) Delivered to government at

DLA Central Receiving DDWG FB2060

Special Handling First Article Unit

455 Byron St. Robins AFB, GA 3098-1887

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$10,026.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

USAF supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 3Generated by PRPS using Jasper Reports on 13 Feb 2025

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Hardaway, Christopher

409 C130 / EN B

770-468-7975

497-2636

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Hardaway, Christopher

409 C130 / EN B

770-468-7975

497-2636

AFMC IMT 260, 20230316, V-5,

Version 3Generated by PRPS using Jasper Reports on 13 Feb 2025

1 DATE 02 JAN 2025:
2 PR MIPR NUMBER:
3 CAGE REFERENCE NUMBER 98897 33410911:
4 NSN 1680014111338LG:
THE FIRST ARTICLE IS 2:
IN ADDITION TO PRODUCTION QUANTITY: Off
6 ARTICLES X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD:
undefined: Off
7 LONG LEAD TIME ITEMS REQUIRED X NOT REQUIRED See FAR 522093 OR 4 alternate II:
REQUIRED: Off
REQUIRED_2: Off
GOVERNMENT TESTING: Off
9 TEST INSPECTION REQUIREMENTS A X CONTRACTOR TESTING GOVERNMENT TESTING Performance or other characteristics which the First Articles must meet are FAT NSN 1680014111338docx B The detailed technical requirements for First Article approval tests are contained in FAT NSN 1680014111338docx Cite Spec and Para number C X TEST PLAN REQUIRED 3 Number of days for government approval disapproval 45 days 1 DD Form 1423 ELIN 2 Delivery due calendar days from date of contract D Contractors notification to ACO and 409 SCMSGUEAC130 Avionics Engineering Requesting Activity of test time and location due 30 days prior to start of testing E X TEST REPORT REQUIRED 3 Forwarded to Christopher Hardaway 235 Byron St STE 19A Robins AFB 31098 christopherhardawayusafmil 4 Government written notice of approval disapproval due 45 2 Due 1 DD Form 1423 ELIN days after receipt of contractors report 45 45 DINDTI80809B DINDTI80566A calendar days from date contractRow1:
1 DATE 02 JAN 2025_2:
455 Byron St Robins AFB:
Approved First Articles will be forwarded to:
undefined_2:
USAF supply:
undefined_3: Off
will be retained by: Off
will be returned to the contractor:
First Articles will be installed on aircraftequipment to determine proper fitfunction Approved article will remain on the aircraftequipment and will not be forwarded: Off
will be retained by_2: Off
will be returned to the contractor_2:
On purchase requests designated as direct shipments the following disposition will apply NOTE Always applicable on Foreign Military Sales FMS: Off
undefined_4: Off
Other Disposition:
Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the: On
Offerors who have previously furnished production quantities of the same or similar articles to the: On
Provided not more than: On
First Article testing will not be waived: Off
See Remarks in block 12 below: Off
Government: On
DoD: On
Air Force: On
Government_2: On
DoD_2: On
Air Force contract and who have received First Article: On
Government_3: On
DoD_3: On
Air Force provided articles: On
thus furnished have exhibited satisfactory performance in service in the opinion of the Air Force: 60
A PROCURING OFFICE:
B CONTRACT NUMBER:
C DATE OF CONTRACT:
D SPECIFICATION NUMBER AND REVISION:
11 CONDITIONS FOR WAIVER OF FIRST ARTICLE APPROVAL a Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government DoD Air Force b Offerors currently in production of the same or similar article for a Government DoD Air Force contract and who have received First Article approval under the existing contract c Offerors who have previously furnished production quantities of the same or similar articles to the Government DoD Air Force provided articles thus furnished have exhibited satisfactory performance in service in the opinion of the Air Force d Provided not more than months have elapsed since completion of the contract e First Article testing will not be waived f See Remarks in block 12 below NOTE TO BUYER UNDER CONDITIONS A AND C ABOVE THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION THE BUYER MUST SOLICIT DUAL PRICES That is both with and without requirement for first article approval AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE A PROCURING OFFICE B CONTRACT NUMBER C DATE OF CONTRACT D SPECIFICATION NUMBER AND REVISIONRow1:
1 DATE 02 JAN 2025_3:
12 REMARKS:
Offerors currently in production of the same or similar article for a: On