FD20602500141 CDRLs A001-A005 Combined.pdf
PDF 598 KB Posted
- Solicitation number
- SPRWA125R0005
- Issued by
-
Defense Logistics Agency Aviation
About this file
This appears to be a cover page directing users to open the PDF portfolio using Adobe Acrobat X or Adobe Reader X (or later versions). The image shows the Adobe PDF logo in red on a white background with red borders, along with text stating "For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later." Below this is a button labeled "Get Adobe Reader Now!" This appears to be a standard Adobe PDF compatibility notice page rather than containing any substantive contract information.
Based on the associated metadata, this file is part of a solicitation (SPRWA125R0005) for C-130 Electrical Control Panel/Intercommunication Set Control C-6567/AIC-25 components being managed by DLA Aviation as a small business set-aside. However, the actual contents of the CDRL documents A001-A005 are not visible in this preview page.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRWA125R0005 Q and A 11 March 2025.docx | DOCX document | |
| SPRWA125R0005 Amd 02.pdf | ||
| FAT NSN 1680014111338.docx | DOCX document | |
| SPRWA1-25-R-0005 AMD 01.pdf | ||
| SPRWA1-25-R-0005.pdf | ||
| First_Article_Requirements.pdf | ||
| Packaging Requirements.pdf | ||
| ENGINEERING DATA LIST.pdf | ||
| Trans Requirement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: A001 title: Item Unique Identification (IUID) Marking Plan sub:
auth: DI-MGMT-81803A ref:
req_ofc: 409 SCMS/GUMBC dd250: DD appcode: A dist: A freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PM: Martens, Tyler draft1:
reg1: 1 repro1:
addressee2: ENG: Hardaway, Chris draft2:
reg2: 1 repro2:
addressee3: ES: Smith, Harry draft3:
reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 7. WAWF acceptor: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FB2065, attention tyler.martens.2@us.af.mil to account for data previously submitted by letter of transmittal. The Government will approve/disapprove the plan through WAWF within 30 calendar days.
Block 10-13. Contractor shall submit an IUID Marking Plan within 30 days of contract award. Written Government acceptance/comments/rejection will be within 30 working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within 20 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 14. EMAIL electronic IUID Marking Plan to the following list: Program Manager (PM), Engineer (ENG) and Equipment Specialist (ES). Points of contact will be provided to the Contractor at contract award and below. Submit digital copy in a Microsoft Office compatible format or Adobe Portable Document Format for all reports.
ENG: Hardaway, Chris 409 SCMS/GUEA, christopher.hardaway@us.af.mil ES: Smith, Harry, 409 SCMS/GUMBB, harry.smith.12@us.af.mil PM: Martens, Tyler, 409 SCMS/GUMBC, tyler.martens.2@us.af.mil group:
total_price:
prep_name:
line_item:
exhibit: A xtdp: Off xtm: Off othercat: MGMT system: Electrical Control Panel ctr_no: FD2060-25-00141 contr: Competitive remarksb:
Page2:
Reset:
2024-11-25T07:12:36-0500
MARTENS.TYLER.KEITH.1458516991
prep_date: 25 Nov 2024 app_by:
2024-11-25T07:57:46-0500
CLARK.JOSEPH.K.1172896452
app_date: 25 Nov 2024
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: Item Unique Identification (IUID) Marking Activity, Validation and Verification Report sub:
auth: DI-MGMT-81804A ref:
req_ofc: 409 SCMS/GUMBC dd250: DD appcode: A dist: A freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PM: Martens, Tyler draft1:
reg1: 1 repro1:
addressee2: ENG: Hardaway, Chris draft2:
reg2: 1 repro2:
addressee3: ES: Smith, Harry draft3:
reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 7. WAWF acceptor: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FB2065, attention tyler.martens.2@us.af.mil to account for data previously submitted by letter of transmittal. The Government will approve/disapprove the plan through WAWF within 30 calendar days.
Block 10-13. Contractor shall submit a one-time IUID Marking Activity and Verification Report within 180 days after contract award.
Block 14. EMAIL electronic IUID Marking Activity and Verification Report to the following list: Program Manager (PM), Engineer (ENG) and Equipment Specialist (ES). Points of contact will be provided to the Contractor at contract award and below. Submit digital copy in a Microsoft Office compatible format or Adobe Portable Document Format for all reports.
ENG: Hardaway, Chris 409 SCMS/GUEA, christopher.hardaway@us.af.mil group:
total_price:
prep_name:
line_item:
exhibit: A xtdp: Off xtm: Off othercat: MGMT system: Electrical Control Panel ctr_no: FD2060-25-00141 contr: Competitive remarksb:
Page2:
Reset:
2024-11-25T07:12:55-0500
MARTENS.TYLER.KEITH.1458516991
prep_date: 25 Nov 2024 app_by:
2024-11-25T07:58:15-0500
CLARK.JOSEPH.K.1172896452
app_date: 25 Nov 2024
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A003 title: Counterfeit Prevention Plan (CPP) sub:
auth: DI-MISC-81832 ref:
req_ofc: 409 SCMS/GUMBC dd250: DD appcode: A dist: A freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PM: Martens, Tyler draft1:
reg1: 1 repro1:
addressee2: ENG: Hardaway, Chris draft2:
reg2: 1 repro2:
addressee3: ES: Smith, Harry draft3:
reg3: 1 repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 3 total_repro: 0 remarks: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 7. WAWF acceptor: The Government will accept the receiving report through WAWF. The contractor shall submit the receiving report upon final submission to DODAAC FB2065, attention tyler.martens.2@us.af.mil to account for data previously submitted by letter of transmittal. The Government will approve/disapprove the plan through WAWF within 30 calendar days.
Block 10-13: Contractor shall submit the CPP 90 days after contract award. Written Government acceptance/comments/rejection will be within 20 working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within 20 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 14. EMAIL electronic CPP to the following list: Program Manager (PM), Engineer(ENG) and Equipment Specialist (ES). Points of contact will be provided to the Contractor at contract award and below. Submit digital copy in a Microsoft Office compatible format or Adobe Portable Document Format for all reports.
ENG: Hardaway, Chris 409 SCMS/GUEA, christopher.hardaway@us.af.mil group:
total_price:
prep_name:
line_item:
exhibit: A xtdp: Off xtm: Off othercat: MISC system: Electrical Control Panel ctr_no: FD2060-25-00141 contr: Competitive remarksb:
Page2:
Reset:
2024-11-25T07:13:13-0500
MARTENS.TYLER.KEITH.1458516991
prep_date: 25 Nov 2024 app_by:
2024-11-25T07:58:42-0500
CLARK.JOSEPH.K.1172896452
app_date: 25 Nov 2024
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A004 title: Test Plan sub:
auth: DI-NDTI-80566A ref:
req_ofc: 409 SCMS/GUMBC dd250: DD appcode: A dist: A freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PM: Martens, Tyler draft1:
reg1: 1 repro1:
addressee2: ENG: Hardaway, Chris draft2:
reg2: 1 repro2:
addressee3: ES: Smith, Harry draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 2 total_repro: 0 remarks: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 10-13: Contractor shall submit the Test Plan to support the first article testing requirement performed by the Contractor within 30 calendar days after contract award.
Written Government acceptance/comments/rejection will be within 20 working days after receipt of Plan from the Contractor. If rejected, the Contractor will have 20 workings days to revise and return to the Government. Contractor final submission shall be submitted within 20 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 14. EMAIL one (1) electronic Test Plan to the following list: Program Manager (PM) and Engineer (ENG). Points of contact will be provided to the Contractor at contract award and below. Submit digital copy in a Microsoft Office compatible format or Adobe Portable Document Format for all reports.
ENG: Hardaway, Chris 409 SCMS/GUEA, christopher.hardaway@us.af.mil group:
total_price:
prep_name:
line_item:
exhibit: A xtdp: Off xtm: Off othercat: MGMT system: Electrical Control Panel ctr_no: FD2060-25-00141 contr: Competitive remarksb:
Page2:
Reset:
2024-11-25T07:13:28-0500
MARTENS.TYLER.KEITH.1458516991
prep_date: 25 Nov 2024 app_by:
2024-11-25T07:59:09-0500
CLARK.JOSEPH.K.1172896452
app_date: 25 Nov 2024
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A005 title: Test Report sub:
auth: DI-NDTI-80809B ref:
req_ofc: 409 SCMS/GUMBC dd250: DD appcode: N/A dist: A freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PM: Martens, Tyler draft1:
reg1: 1 repro1:
addressee2: ENG: Hardaway, Chris draft2:
reg2: 1 repro2:
addressee3: ES: Smith, Harry draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 2 total_repro: 0 remarks: Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 10: The contractor shall submit the approved Test Report one time.
Block 11: Once functional testing has been completed on the newly built First Articles
(FA).
Block 12: Contractor will deliver a First Article (FA) Test Report in accordance with the approved FA Test Plan (A004) prepared by the Contractor within 30 calendar days after functional testing is completed. 409 SCMS Engineering will have 20 calendar days to review the FA Test Report and provide a disposition for either acceptance or rejection.
Block 14: EMAIL one (1) electronic copy of the First Article Test Report to the following list: Program Manager (PM) and Engineer (ENG). Points of contact will be provided to the Contractor at contract award and below. Submit digital copy in a Microsoft Office compatible format or Adobe Portable Document Format for all reports.
ENG: Hardaway, Chris 409 SCMS/GUEA, christopher.hardaway@us.af.mil group:
total_price:
prep_name:
line_item:
exhibit: A xtdp: Off xtm: Off othercat: MGMT system: Electrical Control Panel ctr_no: FD2060-25-00141 contr: Competitive remarksb:
Page2:
Reset:
2024-11-25T07:13:48-0500
MARTENS.TYLER.KEITH.1458516991
prep_date: 25 Nov 2024 app_by:
2024-11-25T07:59:37-0500
CLARK.JOSEPH.K.1172896452
app_date: 25 Nov 2024
Page:
of_pages:
app: Adobe Professional 8.0
File details come from the government source that posted it. Updated .