Final SOW.pdf
PDF 399 KB Posted
- Attached to
- Substation Maintenance and Repair
- Solicitation number
- FA483021Q0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised SOW.pdf | ||
| Combo Amendment 0002.pdf | ||
| Site Visit Q and A.pdf | ||
| Base Map.pdf | ||
| Base Pass.pdf | ||
| Combo Amendment 0001.pdf | ||
| Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
SUBSTATION REPAIR AND MAINTENANCE
Contractor will provide all manpower, material, equipment, and supervision to perform below listed repair and maintenance actions at the Moody AFB substation. Contractor must provide current certification for Integrated Transmission System training.
1. Visually inspect “spare” Vacuum Circuit Breaker (VCB) and test for operability. Download relay settings from the damaged “A” circuit VCB into the “spare” unit. Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.
2. Disconnect damaged VCB from substation, remove from concrete pad, and relocate “spare” breaker into vacated “A” circuit position; make all required connections that would enable the breaker to be placed back in service.
3. Analyze effectiveness of current protective relay settings for all six VCBs. Civil Engineer Squadron can provide calculated design settings based on most recent coordination study; and the video of the incident arc that drives the need for this inspection, testing, and repair contract. Adjust relay settings of VCBs, based on Electrical Engineer analysis.
4. Perform inspection, maintenance, testing, and repair on damaged VCB; provide report of all actions and findings.
5. Place refurbished VCB into the “spare” circuit breaker position and make required connections for breaker to be utilized.
6. Perform inspection, maintenance, and testing on remaining 4 (four) VCBs in the substation.
Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.
7. Provide and install wildlife protection barriers on all six circuit breakers that belong to the government.