Final SOW.pdf

PDF 399 KB Posted

Attached to
Substation Maintenance and Repair
Solicitation number
FA483021Q0001
Issued by

View the file

Other files

File Type Posted
Revised SOW.pdf PDF
Combo Amendment 0002.pdf PDF
Site Visit Q and A.pdf PDF
Base Map.pdf PDF
Base Pass.pdf PDF
Combo Amendment 0001.pdf PDF
Combo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

SUBSTATION REPAIR AND MAINTENANCE

Contractor will provide all manpower, material, equipment, and supervision to perform below listed repair and maintenance actions at the Moody AFB substation. Contractor must provide current certification for Integrated Transmission System training.

1. Visually inspect “spare” Vacuum Circuit Breaker (VCB) and test for operability. Download relay settings from the damaged “A” circuit VCB into the “spare” unit. Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.

2. Disconnect damaged VCB from substation, remove from concrete pad, and relocate “spare” breaker into vacated “A” circuit position; make all required connections that would enable the breaker to be placed back in service.

3. Analyze effectiveness of current protective relay settings for all six VCBs. Civil Engineer Squadron can provide calculated design settings based on most recent coordination study; and the video of the incident arc that drives the need for this inspection, testing, and repair contract. Adjust relay settings of VCBs, based on Electrical Engineer analysis.

4. Perform inspection, maintenance, testing, and repair on damaged VCB; provide report of all actions and findings.

5. Place refurbished VCB into the “spare” circuit breaker position and make required connections for breaker to be utilized.

6. Perform inspection, maintenance, and testing on remaining 4 (four) VCBs in the substation.

Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.

7. Provide and install wildlife protection barriers on all six circuit breakers that belong to the government.