On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers from Substation Site Visit on 02 Dec 20
FA483021Q0001
Can we get Drawings, Specs, and 1 – Line diagrams of the substation?
All items provided and will be posted in Beta.Sam.Gov.
Can we get manufacturer’s specs of the damaged breaker?
Data plate information provided and is posted in Beta.Sam.GOV.
How long can a weekend outage last?
Contractors shall plan performance execution without the need of a power outage.
What are the specs for the 36 animal guards?
Any animal guard that is properly rated and suitable for the bushing/conductor configuration on our breakers can be purchased by contractor.
We have qualified personnel that can do the switching, what type of certification do they need?
Georgia Transmission requires ITS training to work in their substations.
Will Moody AFB Electrical personnel be available during outages?
Contractors shall plan performance execution without the need of a power outage.