Revised SOW.pdf

PDF 18 MB Posted

Attached to
Substation Maintenance and Repair
Solicitation number
FA483021Q0001
Issued by

View the file

Other files

File Type Posted
Combo Amendment 0002.pdf PDF
Site Visit Q and A.pdf PDF
Base Map.pdf PDF
Base Pass.pdf PDF
Combo Amendment 0001.pdf PDF
Combo.pdf PDF
Final SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

SUBSTATION REPAIR AND MAINTENANCE

Contractor will provide all manpower, material, equipment, and supervision to perform below listed repair and maintenance actions at the Moody AFB substation. Contractor must provide current certification for Integrated Transmission System training.

1. Visually inspect “spare” Vacuum Circuit Breaker (VCB) and test for operability. Download relay settings from the damaged “A” circuit VCB into the “spare” unit. Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.

2. Disconnect damaged VCB from substation, remove from concrete pad, and relocate “spare” breaker into vacated “A” circuit position; make all required connections that would enable the breaker to be placed back in service.

3. Analyze effectiveness of current protective relay settings for all six VCBs. The video of the incident arc that drives the need for this inspection, testing, and repair contract will be provided to the selected awardee. Adjust relay settings of VCBs.

4. Perform inspection, maintenance, testing, and repair on damaged VCB; provide report of all actions and findings.

5. Place refurbished VCB into the “spare” circuit breaker position and make required connections for breaker to be utilized.

6. Perform inspection and testing on remaining VCBs in the substation. Tests will include Contact Resistance, Megger, and Hi-Pot; provide report detailing all actions and findings.

7. Provide and install wildlife protection barriers on all six circuit breakers that belong to the government.

8. Contractors should assume the VCB that has damage can be repaired/refurbished and doesn't require replacing.

Revised SOW
VCB data
VCB A bushing
SUB one line
Site Visit Pictures
129349963_3451027791659755_3486535680966961170_n
129495171_970657750125232_1536242754087427880_n
129444421_328981061862853_4299618131309584808_n
129049369_224878438994939_9188452961514764338_n
129310510_378622803461960_1430121380653823257_n
129334560_201987048154839_8168332009444461209_n
129391336_385159612910056_4071763295785945152_n
129398183_989813471505780_6162007972929414804_n
129583859_233537758108482_3200436664580503755_n
129549286_1272870663080763_6942562641832379781_n
129501635_469345514033279_76643904622694031_n
129411654_1062983037476947_3805049892824641467_n
129350507_1835890023229801_5145221902814732847_n
129850886_202325948106944_2544361850659858637_n
129311866_1417021795295401_9218201949683466034_n
129161297_2947383265491642_9158469888062009716_n
129311172_1026059704542732_490713364191092384_n
129116540_834149587127534_4281276361873043497_n
129318310_238529224276662_4877999205096187777_n
129310510_141052350782489_5943042638986395150_n
129336657_745906679346805_3376868455127699655_n
129444421_2145677175565239_9121577378005085146_n
129350512_206011187705521_8721289519142815818_n

Final SOW - amended

File details come from the government source that posted it. Updated .