CNRMAINST 11262.lB
2 7 MAR 2020
CONTRACTOR CRANE/ LHE PRE-ENTRY CHECKLIST
Contracting
Office:
Contractor's
Package Rec'd:
Proposed Date of Prime Contractor: Prime Contractor POC: POCPhone:
Entry:
Contracting Officer: Phone: Contract Number:
Equipment Supplier / Phone ( If different from prime) Serial number Approved/Qualified Operator(s) and Rigger-in-Charge:
Equipment Manufacturer
Manufacturers Maximum Rated Capacity:
Cert. Type
Quadrennial:
Annual:
Exp. Date
Heavies Lift
Crane Setup Site:
Equipment Model Equipment Number
1.
2.
3.
Lift Type:
0 Critical
0 Routine
C r a n e Type at Check in Point Equipment Type
0 MobileRT
0 Mobile Truck
D Floater D Crawler Rough Terrain, Telehandler / Forklift
Front Loader
D D D Mobile on barge D Boom Truck
Excavator
D Telescopic Boom D Lattice Boom Equipment with Anti Two-Blocking device: Y / N / NA
Mode Code
Equipment at Check in Point Same as identified in submitted crane/LHE package?
Configured same as identified in submitted crane package?
All Hoist Block Hooks equipped with positive latching device?
Hoist wire rope free of obvious defects?
Hoist wire rope dead ended with:
Poured Socket? Y / N
Wedge Socket? Y / N
If wedge type socket, is pig tail clamped correctly? Y / N
Operator at Check in Point in Possession of:
Comp leted Certificate of Compliance? Y / N
Copy of Required Crane Certifications? Y / N
Current Crane Operator Qualifications? Y / N
Copy of Approved Lift Plan? Y / N
Backhoe D Other: ------------
YIN List/ trim angle indicator visible to operator while at controls? Y / N / NA
YIN Calibrated Load Moment/ Load Indicator present in operator's cab? Y / N / NA
YIN Equipment equipped with appropriately rated fire extinguisher? Y / N / NA
Y IN I NI A Equipment equipped with spill containment kit? Y / N /NA
Copy of approved ground loading restrictions for all set up/work locations? Y / N / NA
Approved cribbing plan and cribbing at pass office prior to entry? YIN/NA
YIN
YIN
YIN
Load Rating Charts visible to operator while at controls?
Boom angle indicator visible to operator while at controls?
Rigging gear free of obvious defects?
General Notes:
Reviewing Surveillance Team Member I Phone Date of Entry I Expiration of Permit I Time of Entry
Enclosure (3)
Check in time:
Max Outrigger load:
Description of Work:
CNRMAINST 11262.IB
2 7 MAR 2020
CERTIFICATE OF COMPLIANCE
This certificate shall be signed by an official of the company that provides cranes ( or multi-purpose machines, MHE, or construction equipment used to lift loads suspended by rigging gear) or rigging gear for any application under this contract. Post a completed certificate on each crane or alternate machine (or in the contractor's on-site office for riaainQ operations) brouQht onto Navy property.
CONTRACTING OFFICER'S POINT OF CONTACT PHONE
( Government Representative)
PRIME CONTRACTOR/PHONE CONTRACT NUMBER
CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE CRANE OR
(if different from prime contractor} AL TERNA TE MACHINE
NUMBER (i.e., ID number)
CRANE OR ALTERNATE MACHINE MANUFACTURER/TYPE/CAPACITY
CRANE OR ALTERNATE MACHINE OPERATOR'S NAME(S)
I certify that
1. The above noted crane or alternate machine and all rigging gear conform to applicable OSHA regulations (host nation regulations for naval activities in foreign countries) and applicable ASME 830 or other standards. The following OSHA regulations and ASME or other standards apply:
2. The operators noted above have been trained and are qualified for the operation of the above noted crane(s) or alternate machine(s).
3. All safety devices and operator aids are enabled and functioning properly and the operators noted above have been trained not to bypass safety devices and operator aids during lifting operations.
4. The operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.
5. Signal persons used in construction work are qualified in accordance with 29 CFR 1926.1428.
6. Riggers are qualified in accordance with NAVFAC P-307, paragraph 11.1.k.
7. All personnel working on the job site have been trained to not stand under a load or in the fall zone of a suspended load unless specifically allowed by USAGE EM 385-1-1.
COMPANY OFFICIAL SIGNATURE DATE
COMPANY OFFICIAL NAME/TITLE
POST ON CRANE (OR ALTERNATE MACHINE)
(IN CAB OR VEHICLE)
( or in the contractor's on-site office for riooing operations)
Enclosure (1) l l
CNRMAINST 11262.lB
2 7 MAR 2020
CONTRACTOR CRANE I LHE ENTRY PACKAGE CHECKLIST
Company
Equipment Manufacturer/ Equipment Model/ Equipment Number
Name ofCrane / LHE Company &Eq u i p m e n t Number
Date of Annual Inspection Expiration
Date of Quadrennial Inspection E xpiration Contracting Official
Name & phone number of Contracting Official Phone Number ( or designated local representative)
Does the package include a routine or critical lift plan? YES
Location of lift site I Duration crane will be continuously on the iob site (hrs, days, weeks ... ) I
YES
Does plan include certification from the contractor that the crane complies with ASME B30 standard [B30.5 (mobile cranes), B30.8 (floating cranes), B30.22 (articulating boom cranes), or B30.3 (construction tower cranes)l as applicable?
Does plan include a certificate of compliance per CNRMAINST l l 262.1B [enclosure (!)]? YES
Which OSHA regulations does the certificate of compliance indicate? (For cranes used in cargo transfer, 29 CFR 1917 applies; for cranes used in construction, demolition, or maintenance, 29 CFR 1926 applies;
for cranes used in shipbuilding, ship repair, or shipbreaking, 29 CFR 1915 applies).
Does t h e plan include valid medical certificate and proof of operator qualification from a source that qualifies crane operators (union, governmental agency, or an organization that tests and qualifies crane operators)? Verify qualification for each back-up operator (if provided) on the certificate of compliance. YES NO
Does the plan include designate a Rigger-in-Charge? YES
What is the weight of the heaviest load to be lifted?
What is the weight of the rigging gear?
Main Block
What are the crane /LHE components ( and their weights) that add to the weight of the load
(hook, jib, etc.)?
Aux. Block
Jib (Stowed)
Jib (Erected)
Other
What is the maximum total crane /LHE lift (sum of 13, 14 & 15 above)? TOTAL
What is the capacity of the crane/ LHE as configured?
What percentage of crane / LHE capacity does this lift represent?
Boom Mode Main Jib
What is the main boom length? If a jib will be utilized, indicate the length and offset. /Counterweight Used
For Multipurpose Eauipment : boom working height I
What are the minimum and maximum load radii? I Min Max
Does the plan include the manufacturer's load chart for the entire range of lift(s)? YES Does t h e plan include ground loading and outrigger reaction data to determine cribbing requirements or a Waterfront Operational Permit? YES NO
Enclosure (2)
NO
NO
NO
NIA
NO
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
Offset
NO
NIA
CNRMAINST 11262.1B
CONTRACTOR CRANE / LHE ENTRY PACKAGE CHECKLIST (Cont.)
23 For crawler crane, does the plan indicate area restrictions for operation? YES NO N/A
24 For floating crane, does plan include maximum allowable list? YES NO N/A
For mobile crane mounted on barge, is crane equipped with load indicating device? wind indicating device? marine type list and trim indicator (readable in one-half degree increments)? YES NO N/A
26 For mobile crane mounted on barge, does plan include revised load chart? YES NO N/A
27 What are the environmental conditions under which crane operations are to be stopped?
28 Will the crane perform critical lifts per CNRMAINST 11262.1B? (If no, skip items 29 -49.) YES NO
What circumstances require this lift to be classified as a critical lift?
(Blind lift, 75% of load chart non-routine rigging, etc.)
30 What are the exact dimensions of the load? (L x W x H)
31 Does the plan indicate the crane position? (Overhead view) YES NO
32 What is the maximum lift height of the lift?
33 What is the minimum boom angle?
34 What is the maximum boom angle?
35 What is the name of the operator?
36 Indicate name(s) of backup operator (if required).
37 Does the plan show lift points? YES NO
38 Does the plan describe the rigging procedures? YES NO
39 Does the plan indicate rigging hardware requirements? YES NO
40 For personnel lifts, does the plan demonstrate compliance with 29 CFR 1926.550? YES NO N/A
41 Does EM 385-1-1 govern this lift? YES NO N/A
What are the coordination and communication requirements for the lift (e.g., radio and hand signals)?
For tandem or tailing crane lifts, does the plan indicate the make and model of the crane, the line, boom, and swing speeds, and the requirement for an equalizer beam? YES NO N/A
Has FAA Form 7460-1, Notice of Proposed Construction or Alteration, in accordance with CFR Title 14 Part 77 been submitted”
What is the name of the lift supervisor?
46 Does the plan indicate the qualifications of the lift supervisor? YES NO
47 What are the names of the riggers?
48 Does the plan indicate the qualifications of the riggers? YES NO
49 Did all involved personnel (Operator, Riggers, Lift Supervisor, etc.) sign the critical lift plan? YES NO
Signature below verifies LHE package complies with CNRMAINST 11262.1B
Contracting Official: Organization: Signature: Date: Phone:
27 MAR 2020
Ref: https://oeaaa.faa.gov/oeaaa/external/gisTools/ gisAction.jsp?action=showNoNoticeRequiredToolForm YES NO N/A
LIFT PLAN DETAIL SHEET
NON-Critical______ Critical________
Before making a critical or non-critical lift plan, qualified personnel shall prepare the lift plan, which can be, qualified members of the crane team, site supervisor/lift director or crane engineer. Key members, such as the lift supervisor, rigger and crane operator shall participate in the preparation.
The plan shall designate the crane operator, lift supervisor and rigger and state their qualifications For tandem or tailing crane lifts, the plan will specify the make and model of the cranes, the line, boom, and swing speeds, and requirement for an equalizer beam.
___ RIGGING PLAN DETAIL LIFT POINT
DESIGNATED AS (X)
ALSO, MANUFACTURE OR COMPANY’S
DETAIL DRAWING IS ACCEPTABLE
OPERATOR
QUALIFIED RIGGER IN CHARGE
___ QUALIFIED RIGGERS
Rigging Gear Used A _____________________________________________________________ Specifications
B _____________________________________________________________
C _____________________________________________________________
D______________________________________________________________
Crane Make & Model ______________________________________________________________
Personnel Basket Inspection Date ____________ Total weight of test weight _______________
Rigging Procedure _____________________________________________________________
COMMUNICATION:
A. Hand Signals ____ B. Two-way Radio ___ C. Others Specify____________________________
IN-PROCESSING SHEET
FOR
CONTRACTOR'S CRANE-ENTRY PACKAGE
Today's Date
Tracking number
Gov. Contracting office
Gov. Contractor's officer name
Gov. Contractor's phone #
Crane packet was received on- date ______time:......-_______ . ;, Job will start on - date'--____ time'--____ location~-----
1 Was the entry package complete? ·Yes or No
2. Person name that reviewed & completed the packet: ___- ________
Return the submittal or memo with tracking number to the Gov. Contraction officer.
Date __~, time ___ replywas sent.
Comments
Corrective items comments
SURVEILLANCE OFFICE USE ONLY
| Contractors Package Recd: |
| Prime Contractor POC: |
| RiggerinCharge: |
| Other: |
| DATE: |
| COMPANY OFFICIAL NAMETITLE: |
| Duration crane will be continuously on the iob site hrs days weeks: |
| MainWhat is the main boom length If a jib will be utilized indicate the length and offset: |
| JibWhat is the main boom length If a jib will be utilized indicate the length and offset: |
| OffsetWhat is the main boom length If a jib will be utilized indicate the length and offset: |
| MainFor MultiPuroose Eauipment boom working height: |
| JibFor MultiPuroose Eauipment boom working height: |
| MainMin: |
| DATE ISSUED: |
| EXPIRATION DATE: |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Government Rep: |
| Contracting Officer Phone: |
| Prime Contractor: |
| POCPhone: |
| Crane phone: |
| Equipment Number: |
| Equipment Manufacturer: |
| Equipment Model: |
| Manufacturers Maximum Rated Capacity: |
| Operator 1: |
| Operator 2: |
| Operator 3: |
| ASME Standards: |
| OSHA Standards: |
| Max: |
| Equipment Supplier: |
| Tracking Number: |
| Crane Setup Site: |
| Quadrennial: |
| Annual: |
| Heavies Lift: |
| Text24: |
| Contract Number: |
| Contracting Office: |
| Boom Mode Counterweight UsedWhat is the main boom length If a jib will be utilized indicate the length and offset: |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| load: |
| rigging gear wieght: |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Text42: |
| Capacity as Configured: |
| Text44: |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Date50_af_date: |
| today's date: |
| PACKAGE RECEIVED: |
| Text3: |
| Check Box14: Off |
| Check Box238: Off |
| C: |
| S: |
| T: |
| Text240: |
| Text241: |
| Text242: |
| Text243: |
| Text244: |
| Entry: |
| Start Time: |
| TRACKING NUMBER: |
| Text263: |
| Text264: |
| Text265: |
| Text266: |
| Text267: |
| Text268: |
| Text269: |
| Check Box270: Off |
| Check Box271: Off |
| Text272: |
| Text273: |
| Text274: |
| Text275: |
| Check Box276: Off |
| Check Box277: Off |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Environmental conditions: |
| Check Box44: Off |
| Check Box50: Off |
| Text51: |
| Text52: |
| Check Box53: Off |
| Check Box54: Off |
| Check Box59: Off |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Text71: |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Date85_af_date: |
| Riggers: |
| lift supervisor: |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Max Outrigger: |
| General Notes: |
| General Notes 2: |
| General Notes 3: |
| General Notes 4: |
| General Notes 5: |