JB CHS-WS RCRA Part B Permit

View the file

Other files

File Type Posted
JB_CHS-WS_MS4_NOI.pdf PDF
JB_CHS_Hazardous_Waste_Management_Plan.pdf PDF
JB_CHS-WS_Bi-Annual_MS4_Report.pdf PDF
JB_CHS-AB_Bi-Annual_MS4_Report.pdf PDF
JB_CHS-AB_Conditional_Major_Operating_Permit.pdf PDF
JB_CHS_Monitoring_Plan_for_OB_OD_Range.pdf PDF
JB_CHS-AB_RCRA_Part_B_permit.pdf PDF
JB_CHS_QRP_Business_Plan_and_Commodoty_Market_Analysis.pdf PDF
JB_CHS-WS_N-2_Pretreatment_Permit.pdf PDF
JB_CHS_Integrated_Solid_Waste_Management_Plan.pdf PDF
Short_Stay_Wastewater_Treatment_Plant_Permit.pdf PDF
JB_CHS_NPDES_General_Pemit_for_discharges_from_application_of_Pesticides.pdf PDF
JB_CHS-AB_Storm_Water_Management_Plan.pdf PDF
JB_CHS_NPDES_General_Permit_for_Utility_Water_Discharges.pdf PDF
JB_CHS_NPDES_General_Permit_for_SW_Discharges_from_SMS4.pdf PDF
JB_CHS-WS_Conditional_Major_Operating_Permit.pdf PDF
JB_CHS-AB_Storm_Water_Pollution_Prevention_Plan.doc DOC document
JB_CHS-WS_N-1_Pretreatment_Permit.pdf PDF
JB_CHS-WS_Storm_Water_Pollution_Prevention_Plan.pdf PDF
JB_CHS_NPDES_General_Industrial_Stormwater_Permit.pdf PDF
JB_CHS-WS_Storm_Water_Management_Plan.pdf PDF
JB_CHS-AB_MS4_NOI.pdf PDF
JB_CHS-AB_North_Charleston_Sewer_District_Permit.pdf PDF
Draft_Technical_Evaluation_-_JB_CHS_F2F.docx DOCX document
JB_CHS_IST_F2F_Draft_PWS_13Sep2017.docx DOCX document
Guess_Listing_Function_Worksheet_(GLFW)-Shaw_19Sep2017.docx DOCX document
Guess_Listing_Function_Worksheet_(GLFW)-JB_CHS_19Sep2017.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Joint Base Charleston-Weapons

SC8 170 022 620

Charleston and Berkeley Counties

TABLE OF PERMIT MODIFICATIONS

MODULE I - STANDARD CONDITIONS

MODULE II - GENERAL FACILITY CONDITIONS

MODULE III - POSTCLOSURE CARE FOR TANK STORAGE [SWMU 10, SWMU 14]

MODULE IV - GROUNDWATER REQUIREMENTS

MODULE V - CONTAINERS

MODULE VI-SUBPART X MISCELLANEOUS UNITS

MODULE VII - CORRECTIVE ACTION FOR SOLID WASTE MANAGEMENT UNITS AND AREAS OF

CONCERN

MODULE VIII - WASTE MINIMIZATION

MODULE IX - LAND DISPOSAL RESTRICTIONS

MODULE X – ORGANIC AIR EMISSION REQUIREMENTS

APPENDIX A - SOLID WASTE MANAGEMENT UNIT AND AREA OF CONCERN SUMMARY

APPENDIX B - RCRA FACILITY INVESTIGATION (RFI) WORKPLAN OUTLINE

APPENDIX C - CORRECTIVE MEASURE STUDY (CMS) OUTLINE

APPENDIX D – LAND USE CONTROL MANAGEMENT PLAN

MODULE I - STANDARD CONDITIONS

MODULE I - STANDARD CONDITIONS

Module I.

I.A. EFFECT OF PERMIT

This Permit is issued pursuant to the Resource Conservation and Recovery Act (RCRA), as amended. Issuance of this Permit does not convey property rights of any sort or any exclusive privilege; nor does it authorize any injury to persons or property, any invasion of other private rights, or any infringement of state or local law or regulations. Compliance with the terms of this Permit does not constitute a defense to any order issued or any action brought under Sections 3008(a), 3008(h), 3013, or 7003 of RCRA; Sections 106(a), 104, or 107 of the

Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601 et seq., commonly known as CERCLA), or any other law providing for protection of public health or the environment.

[R.61-79.270.4, 270.30(g)]

The Permittee shall store hazardous waste in containers and treat energetic wastes in accordance with the

Conditions of this Permit. Any storage, treatment, and/or disposal of hazardous waste not authorized in this

Permit is prohibited, except as allowed by the South Carolina Hazardous Waste Management Regulations, R.61-79.

I.B. PERMIT ACTIONS

I.B.1. Permit Modification, Revocation and Reissuance, and Termination

This Permit may be modified, revoked and reissued, or terminated for cause as specified in R.61-

79.270.41, 270.42, and 270.43. The filing of a request for a permit modification, revocation and reissuance, or termination, or the notification of planned changes or anticipated noncompliance on the part of the Permittee does not stay the applicability or enforceability of any Permit Condition.

[R.61-79.270.30(f)]

I.B.2. Permit Renewal

This Permit may be renewed as specified in Permit Condition I.E.2. Review of any application for a permit renewal shall consider improvements in the state of control and measurement technology, as well as changes in applicable regulations. [R.61-79.270.30(b)]

I.B.3. Permit Expiration

Pursuant to R.61-79.270.50, this Permit shall be effective for a fixed term not to exceed ten years.

This Permit and all Conditions herein will remain in effect beyond the permit's expiration date, if the Permittee has submitted a timely, complete application (see R.61-79.270.10, 270.13 through

270.29) and, through no fault of the Permittee, the Department has not issued a new permit, as set forth in R.61-79.270.51.

I.C. SEVERABILITY

The provisions of this Permit are severable, and if any provision of this Permit, or the application of any provision of this Permit to any circumstance is held invalid, the application of such provision to other circumstances and the remainder of this Permit shall not be affected thereby.

I.D. DEFINITIONS

For purposes of this Permit, terms used herein shall have the same meaning as those in R.61-79 Parts 124, 260, 264, 266, 268, and 270, unless this Permit specifically provides otherwise; where terms are not defined in the regulations or the permit, the meaning associated with such terms shall be defined by a standard dictionary reference or the generally accepted scientific or industrial meaning of the term.

I.D.1. Area of Concern (AOC)

For purposes of this Permit includes any area having a probable release of a hazardous waste or hazardous constituent which is not from a solid waste management unit and is determined by the

Department to pose a current or potential threat to human health or the environment. Such areas of concern may require investigation and remedial action as required under Section 3005(c)(3) of the

Resource Conservation and Recovery Act and R.61-79.270.32(b)(2) in order to ensure adequate protection of human health and the environment.

I.D.2. Certified Laboratory

For the purposes of this Permit means a laboratory that has been approved by the Department to perform specific analyses referenced in R.61-79.260 through R.61-79.270.

I.D.3. Compliance Period

For the purposes of the groundwater requirements of this Permit is the number of years equal to the active life of the unit prior to the Department’s approval of certification of closure. The compliance period includes any period of waste management activity that may have occurred prior to permitting and begins when the owner/operator initiates a compliance monitoring program for groundwater pursuant to R.61-79.264.99.

I.D.4. Contamination

For purposes of this Permit, refers to the presence of any hazardous constituent in a concentration which exceeds the naturally occurring concentration of that constituent in areas not affected by the facility.

I.D.5. Corrective Action

For purposes of this Permit, may include all corrective actions necessary to protect human health and the environment for all releases of hazardous waste or hazardous constituents at the facility, regardless of the time at which waste was placed in the unit, as required under R.61-79.264.100(b) and 264.101. Corrective action may address releases to air, soils, surface water, sediment, groundwater, or subsurface gas.

I.D.6. Corrective Action Management Unit (CAMU)

For purposes of this Permit, includes any area within a facility that is designated by the Department under R.61-79.264 Subpart S for the purpose of implementing corrective action requirements under

264.101 and RCRA Section 3008(h). A CAMU shall only be used for the management of remediation wastes pursuant to implementing such corrective action requirements at the facility.

I.D.7. Department

For purposes of this permit, means the Department of Health and Environmental Control, including personnel thereof authorized by the Board to act on behalf of the Department or Board.

I.D.8. Extent of Contamination

For the purposes of this Permit, is defined as the horizontal and vertical area in which the concentrations of hazardous constituents in the environmental media being investigated are above the naturally occurring concentration of that constituent in areas not affected by the facility.

I.D.9. Facility

For purposes of this Permit, includes all contiguous property and structures, other appurtenances, and improvements on the property, used for treating, storing, or disposing of hazardous waste. A facility may consist of several treatment, storage, or disposal operation units (e.g. one or more landfills, surface impoundments, waste piles, or some combination of these). For the purpose of implementing corrective action under R.61-79.264.100 and R.61-79.264.101, a facility includes all contiguous property under the control of the owner or operator seeking a permit under Subtitle C of

RCRA.

I.D.10. Hazardous Constituent

For purposes of this Permit, are those substances listed in Appendix VIII of R.61-79.261 and

Appendix IX of R.61-79.264.

I.D.11. Hazardous Waste Management Unit (HWMU)

For purposes of this Permit, is a contiguous area of land on or in which hazardous waste is managed, or the largest area in which there is significant likelihood of mixing hazardous waste constituents in the same area. Examples of hazardous waste management units include surface impoundments, waste piles, land treatment areas, landfill cells, incinerators, tanks and their associated piping and underlying containment system, and container storage areas. A container alone does not constitute a unit; the unit includes containers and the land or pad upon which they are managed.

I.D.12. Interim Measures

For purposes of this Permit, are actions necessary to minimize or prevent the further migration of contaminants and limit actual or potential human and environmental exposure to contaminants while long-term corrective action remedies are evaluated and, if necessary, implemented.

I.D.13. Land Disposal

For purposes of this Permit and R.61-79.268, means placement in or on the land except for a

CAMU and includes, but is not limited to, placement in a landfill, surface impoundment, waste pile, injection well, land treatment facility, salt dome formation, underground mine or cave, or concrete vault or bunker intended for disposal purposes.

I.D.14. Landfill

For the purposes of this Permit, includes any disposal facility or part of a facility where hazardous waste is placed in or on the land and which is not a pile, a land treatment facility, a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground mine, a cave, or a corrective action management unit.

I.D.15. Postclosure Care Period

For the purpose of this Permit, is a thirty year period beginning when a hazardous waste management unit is certified as closed and during which time the Permittee shall be required to maintain, monitor, and report in accordance with the appropriate requirements of R.61-79.264

Subparts F, K, L, M, N, and X. The postclosure care period is unit specific and may be more or less than thirty years. The Department may modify the postclosure care period applicable to a unit if it finds that an extended/reduced period is sufficient to protect human health and the environment. [R.61-79.264.117]

I.D.16. Release

For purposes of this Permit, includes any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment of any hazardous waste or hazardous constituents.

I.D.17. Remediation Waste

For the purposes of this Permit, includes all solid and hazardous wastes, and all media (including groundwater, surface water, soils and sediments) and debris, which contain listed hazardous wastes or which themselves exhibit a hazardous waste characteristic, that are managed for the purpose of implementing corrective action requirements under R.61-79.264.100, 264.101 and RCRA Section

3008(h). For a given facility, remediation wastes may originate only from within the facility boundary, but may include waste managed in implementing RCRA Sections 3004(v) or 3008(h) for releases beyond the facility boundary.

I.D.18. Schedule of Compliance

For the purposes of this Permit, refers to a schedule of remedial measures included in this Permit, including an enforceable sequence of interim requirements (for example, actions, operations, or milestone events) leading to compliance with the Resource Conservation and Recovery Act and the

South Carolina Hazardous Waste Management Regulations. [R.61-79.270.2]

I.D.19. Solid Waste

Means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges which are point sources subject to permits under Section 402 of the Federal Water Pollution

Control Act, as amended (86 Stat. 880), or source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954, as amended (68 Stat. 923).

I.D.20. Solid Waste Management Unit (SWMU)

For the purposes of this Permit, includes any unit which has been used for the treatment, storage, or disposal of solid waste at any time, irrespective of whether the unit is or ever was intended for the management of solid waste. RCRA hazardous waste management units are also solid waste management units. SWMUs include areas that have been contaminated by routine and systematic releases of hazardous waste or hazardous constituents, excluding one-time accidental spills that are immediately remediated and cannot be linked to solid waste management activities (e.g. product or process spills).

I.D.21. Temporary Unit (TU)

For the purposes of this Permit, includes any temporary tanks and/or container storage areas used solely for treatment or storage of hazardous remediation wastes during remedial activities required under R.61-79.264.101 or RCRA Section 3008(h). Designated by the Department, such units must conform to specific standards as specified in R.61-79.264.553.

I.D.22. Unit

For purposes of this Permit, includes, but is not limited to, any landfill, surface impoundment, waste pile, land treatment unit, incinerator, injection well, tank, container storage area, septic tank, drain field, wastewater treatment unit, elementary neutralization unit, transfer station, or recycling unit.

I.E. DUTIES AND REQUIREMENTS

I.E.1. Duty to Comply

The Permittee shall comply with the approved permit application and all Conditions of this Permit, except to the extent and for the duration such noncompliance is authorized by an emergency permit. Any permit noncompliance, other than noncompliance authorized by an emergency permit, constitutes a violation of RCRA and the South Carolina Hazardous Waste Management Act and is grounds for enforcement action, permit termination, revocation and reissuance, modification, or denial of a permit renewal application. [R.61-79.270.30(a)]

I.E.2. Duty to Reapply

If the Permittee intends to continue an activity allowed or required by this Permit after the expiration date of this Permit, the Permittee shall submit a complete application for a new permit at least one hundred eighty (180) days prior to permit expiration. The Permittee must comply with the public notice requirements of R.61-79.124.10. [R.61-79.270.10(h), 270.30(b)]

I.E.3. Obligation for Corrective Action

The Permittee is required to continue this Permit for any period necessary to comply with the corrective action requirements of this Permit.[R61-79.264.101, 270.1(c),270.51]

I.E.4. Need to Halt or Reduce Activity Not a Defense

It shall not be a defense for the Permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the

Conditions of this Permit. [R.61-79.270.30(c)]

I.E.5. Duty to Mitigate

In the event of noncompliance with this Permit, the Permittee shall take all reasonable steps to minimize releases to the environment, and shall carry out such measures as are reasonable to prevent significant adverse impacts on human health or the environment. [R.61-79.270.30(d)]

I.E.6. Proper Operation and Maintenance

The Permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to achieve compliance with the Conditions of this Permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of a backup or auxiliary facilities or similar systems only when necessary to achieve compliance with the Conditions of this Permit. [R.61-79.270.30(e)]

I.E.7. Duty to Provide Information

The Permittee shall furnish to the Department, within a reasonable time, any relevant information which the Department may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Permit, or to determine compliance with this Permit. The Permittee shall also furnish to the Department, upon request, copies of records required to be kept by this

Permit. [R.61-79.264.74(a), 270.30(h)]

I.E.8. Inspection and Entry

The Permittee shall allow an authorized representative of the Department, upon the presentation of credentials and other documents, as may be required by law, to: [R.61-79.270.30(I)]

I.E.8.(a). Enter at reasonable times upon the Permittee's premises where a regulated activity is located or conducted, or where records must be kept under the Conditions of this Permit;

I.E.8.(b). Have access to and copy, at reasonable times, any records that must be kept under the

Conditions of this Permit;

I.E.8.(c). Inspect, at reasonable times, any facilities, equipment (including monitoring and control equipment), practices or operations regulated as required under this Permit; and

I.E.8.(d). Sample or monitor, at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by RCRA, any substances or parameters at any location.

I.E.9. Monitoring and Records

I.E.9.(a). Samples and measurements taken for the purpose of monitoring shall be representative of the monitored activity. The method used to obtain a representative sample of the waste and/or contaminated media to be analyzed must be the appropriate method from Appendix I of R.61-

79.261, the EPA Region IV Environmental Investigations Standard Operating Procedure and

Quality Assurance Manual (most recent version), or an equivalent method as specified in the waste analysis plan of the approved permit application, or otherwise approved by the

Department.

Laboratory methods must be those specified in the most recent edition of Test Methods for

Evaluating Solid Waste: Physical/Chemical Methods SW-846, or an equivalent method approved by the Department, and must be performed by a laboratory certified pursuant to the State

Environmental Laboratory Certification Regulations, R.61-81 and R.61-79.260.11. [R.61-

79.270.30(j)(1)]

I.E.9.(b). The Permittee shall retain the following at the facility, or at another location as approved by the Department:

I.E.9.(b)(1) Records of all monitoring information required under the terms of this Permit, including all calibration and maintenance records, I.E.9.(b)(2) Records of all original strip chart recordings for continuous monitoring instrumentation, I.E.9.(b)(3) Copies of all reports and records required by this Permit and all data used to prepare them, I.E.9.(b)(4) Records of all data used to complete the application for this Permit, and

I.E.9.(b)(5) Certification required by R.61-79.264.73(b)(9).

The Permittee shall retain these items for a period of at least three (3) years from the date of the sample, measurement, report, record, certification, or application, or until corrective action is completed, whichever date is later.

This period may be extended by request of the Department at any time and is automatically extended during the course of any unresolved enforcement action regarding this facility.

I.E.9.(c). Pursuant to R.61-79.270.30(j)(3), records of monitoring information shall specify:

I.E.9.(c)(1) The dates, exact place, and times of sampling or measurements;

I.E.9.(c)(2) The individuals who performed the sampling or measurements;

I.E.9.(c)(3) The dates analyses were performed;

I.E.9.(c)(4) The individuals who performed the analyses;

I.E.9.(c)(5) The analytical techniques or methods used; and

I.E.9.(c)(6) The results of such analyses.

I.E.9.(d). Monitoring results shall be reported at intervals specified by the Department.[R.61-

79.270.30(l)(4)]

I.E.10. Reporting Planned Changes

The Permittee shall give notice to the Department as soon as possible of any planned physical alterations or additions to the Permitted facility, which may impact any Hazardous Waste

Management Units (HWMUs), Solid Waste Management Units (SWMUs), Areas of Concern

(AOCs), or the areas contaminated by them. [R.61-79.270.30(l)(1)].

I.E.11. Reporting Anticipated Noncompliance

The Permittee shall give advance notice to the Department of any planned changes in the permitted facility or activity that may result in noncompliance with permit requirements.

The Permittee may not commence storage of hazardous waste at the facility until the Permittee has submitted to the Department, by certified mail or hand delivery, a letter signed by the Permittee and a registered professional engineer stating that the facility has been constructed or modified in compliance with the Permit; and [R.61-79.270.30(l)(2)]

I.E.11.(a). The Department has inspected the modified or newly constructed facility and finds it is in compliance with the Conditions of the Permit; or

I.E.11.(b). The Department either has waived the inspection or has not, within fifteen (15) days of receipt of the above, notified the Permittee of its intent to inspect [R.61-79.270.30 (l)(2)].

I.E.12. Transfer of Permits

This Permit may be transferred to a new owner or operator only after notice to the Department pursuant to R.61-79.270.40 and only if the Permit is modified or revoked and reissued pursuant to

R.61-79.270.41 to identify the new Permittee and incorporate such other requirements as may be necessary. Before transferring ownership or operation of the facility during its operating life, or of a disposal facility during the postclosure care period, the Permittee shall notify the new owner or operator in writing of the requirements of R.61-79.264 and 270, and this Permit.

I.E.13. Schedule of Compliance

Written notification of compliance or noncompliance with any item identified in the section VII of this Permit shall be submitted according to each schedule date. If the Permittee does not notify the

Department within fourteen (14) calendar days of its noncompliance with the schedule, the

Permittee shall be subject to an enforcement action. Submittal of a required item according to the schedule constitutes notification of compliance.

I.E.14. Imminent Hazard Reporting

The Permittee shall report to the Department (Trident District Environmental Quality Control

Office and/or via the 24 hour emergency response phone number) any noncompliance, or any imminent or existing hazard from a release of hazardous waste or hazardous constituents, which may endanger human health or the environment. Any such information shall be reported orally within twenty-four (24) hours from the time the Permittee becomes aware of the circumstances.

This report shall include the following:

I.E.14.(a)(1) Information concerning the release of any hazardous waste or hazardous constituents that may endanger public drinking water supplies.

I.E.14.(a)(2) Information concerning the release or discharge of any hazardous waste, or hazardous constituents, or a fire or explosion at the facility, which could threaten the environment or human health outside the facility.

I.E.14.(b). The description of the occurrence and its cause shall include:

I.E.14.(b)(1) Name, address, and telephone number of the owner or operator;

I.E.14.(b)(2) Name, address, and telephone number of the facility;

I.E.14.(b)(3) Date, time, and type of incident;

I.E.14.(b)(4) Name and quantity of materials involved;

I.E.14.(b)(5) The extent of injuries, if any;

I.E.14.(b)(6) An assessment of actual or potential hazard to the environment and human health outside the facility, and

I.E.14.(b)(7) Estimated quantity and disposition of recovered material that resulted from the incident.

I.E.14.(c). A written report shall also be provided to the Department within fifteen (15) calendar days of the time the Permittee becomes aware of the circumstances. The written report shall contain the information specified under Permit Conditions I.E.14 and I.E.14.(b); a description of the noncompliance or imminent hazard and its cause; the periods of noncompliance (including exact dates and times); whether the noncompliance or imminent hazard has been corrected; and if not, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the noncompliance or imminent hazard. [R.61-

79.270.30(l)(6)]

I.E.15. Manifest Discrepancy Report

If a significant discrepancy in a manifest is discovered, the Permittee must attempt to reconcile the discrepancy. If not resolved within fifteen (15) days, the Permittee must submit a letter report, including a copy of the manifest, to the Department. [R.61-79.270.30(l)(7)]

I.E.16. Unmanifested Waste Report

This report must be submitted to the Department within fifteen (15) days of receipt of unmanifested waste. [R.61-79.270.30(l)(8)].

I.E.17. Other Noncompliance

The Permittee shall report all other instances of noncompliance not otherwise required to be reported above by Permit Conditions I.E.11 and I.E.14, at the time monitoring reports are submitted. The reports shall contain the information listed in Permit Condition I.E.14.(b), as applicable. [R.61-79.270.30(l)(10)]

I.E.18. Other Information

Whenever the Permittee becomes aware that he/she failed to submit any relevant facts, or submitted incorrect information in a permit application or in any report to the Department, the

Permittee shall promptly submit such facts or information. [R.61-79.270.30(l)(11)]

I.F. SIGNATORY REQUIREMENT

All applications, reports, or information submitted to the Department shall be signed and certified in accordance with R.61-79.270.11 and 270.30(k).

I.G. REPORTS, NOTIFICATIONS, AND SUBMISSIONS TO THE DEPARTMENT

All reports, notifications, or other information required by this Permit to be submitted to the Department should be sent to the Department by verifiable delivery at the following address:

S.C. Department Of Health & Environmental Control

Attn: Richard Haynes, Director

Division Of Waste Management

Bureau Of Land And Waste Management

2600 Bull Street

Columbia, SC 29201

Phone: (803) 896-4000

A copy of all reports, notifications, or other information required by this Permit to be submitted to the

Department should also be sent to the US EPA, Region IV by verifiable delivery at the following address:

U.S. Environmental Protection Agency

Attn: RCRA Branch Chief

RCRA Programs and Materials Management Branch

Atlanta Federal Center

61 Forsyth Street

Atlanta, GA 30303

Phone: (404) 562-8527

I.H. CONFIDENTIAL INFORMATION

In accordance with R.61-79.270.12, the Permittee may claim confidential certain information required to be submitted by this Permit.

I.I. DOCUMENTS TO BE MAINTAINED AT THE FACILITY

Until closure is completed, certified by an independent registered professional engineer, and verified by the

Department, the Permittee shall maintain at the facility the following documents and amendments, revisions, and modifications to these documents:

I.I.1. Permit Application

The approved permit application pursuant to R.61-79.270.2.

I.I.2. Waste Analyses Plan

As required by R.61-79.264.13 and this Permit.

I.I.3. Inspection schedules

As required by R.61-79.264.15(b) and this Permit.

I.I.4. Personnel training documents and records

As required by R.61-79.264.16(d) and this Permit.

I.I.5. Contingency Plan

As required by R.61-79.264.53(a) and this Permit.

I.I.6. Operating record

As required by R.61-79.264.73 and this Permit.

I.I.7. Closure Plan

As required by R.61-79.264.112(a) and this Permit.

I.I.8. Installation records

For all monitoring wells and all groundwater elevation data collected during the active life of the facility.

I.I.9. Groundwater monitoring records

Required by R.61-79.264.100 and this Permit.

I.I.10. All other documents

Required by Module 1, Conditions I.E.9, I.E.10, and I.E.11 of this Permit.

MODULE II - GENERAL FACILITY CONDITIONS

MODULE II - GENERAL FACILITY CONDITIONS

Module II.

II.A. DESIGN AND OPERATION OF FACILITY

The Permittee shall construct, maintain and operate the facility in a manner to minimize the possibility of a fire, explosion, or any unplanned sudden or non-sudden release of hazardous waste constituents to air, soil, or surface water which could threaten human health or the environment, as required by R.61-79.264.31.

II.B. GENERAL WASTE ANALYSIS

The Permittee shall follow the waste analysis procedures required by R.61-79.264.13, as described in the

Waste Analysis Plan, Section C of the approved Permit application.

The Permittee shall verify the analysis of each waste stream annually as part of its quality assurance program, in accordance with Test Methods for Evaluating Solid Waste: Physical/Chemical Methods, EPA Publication

SW-846, or equivalent methods approved by the Department. At a minimum, the Permittee shall maintain proper functional instruments, use approved sampling and analytical methods, verify the validity of sampling and analytical procedures, and perform correct laboratory calculations. If the Permittee uses a contract laboratory to perform analyses, then the Permittee shall inform the laboratory in writing that it must operate under the waste analysis conditions set forth in this Permit.

II.C. SECURITY

The Permittee shall comply with the security provisions as specified in Section F of the approved Permit application and R.61-79.264.14(b) and (c).

II.D. GENERAL INSPECTION REQUIREMENTS

The Permittee shall follow the general inspection requirements set out in R.61-79.264.15 and Section F of the approved Permit application. The Permittee shall remedy any deterioration or malfunction discovered by an inspection as required by R.61-79.264.15(c) and the Permit application. Records of inspections shall be kept as required by R.61-79.264.15(d).

II.E. CONTINGENCY PLAN

II.E.1. Implementation of Plan

The Permittee shall immediately carry out the provisions of the Contingency Plan, Section G of the approved Permit application, whenever there is a fire, explosion, or release of hazardous waste or constituents that could threaten human health or the environment. As applicable, the plan must cover the requirements of R.61-79.264.50 through 264.56.

II.E.2. Copies of Plan

The Permittee shall comply with the requirements of R.61-79.264.53.

II.E.3. Amendments to Plan

The Permittee shall review and immediately amend, if necessary, the Contingency Plan, as required by R.61-79.264.54. Any amendment shall be subject to the requirements of R.61-79.270.41 and

270.42.

II.E.4. Emergency Coordinator

A trained emergency coordinator shall be available at all times in case of an emergency, as required by R.61-79.264.55.

II.F. RECORD KEEPING AND REPORTING

In addition to the record keeping and reporting requirements specified elsewhere in this Permit, the Permittee shall do the following:

II.F.1. Operating Record

The Permittee shall maintain a written operating record at the facility in accordance with R.61-

79.264.73.

II.F.2. Quarterly Report

The Permittee shall comply with the quarterly reporting requirements of R.61-79.264.75.

II.G. PERSONNEL TRAINING

The Permittee shall conduct personnel training, as required by R.61-79.264.16. This training shall follow the outline described in Section H of the approved Permit application. The Permittee shall maintain training documents and records at the facility, as required by R.61-79.264.16(d) and (e).

II.H. REQUIRED NOTICES

II.H.1. Hazardous Waste Imports

The Permittee shall not receive hazardous waste from a foreign source.

II.H.2. Hazardous Waste From Off-Site Sources

The Permittee shall receive hazardous waste from an off-site source under the following conditions:

II.H.2.(a). Container Storage

In case of severe weather (i.e. hurricane warning, flood warning, etc.), containerized hazardous waste may be accepted at the container storage facility (SWMU 44) from the following facilities as long as the waste meets the requirements of Section V.B.1 of this

Permit. The Permittee shall observe proper manifesting and transporting requirements during the transfer of containerized waste:

II.H.2.(a)(1) Naval facilities located at Short Stay Recreational Facility, Rt.5 Box 1192, Moncks Corner, SC 29461 (EPA ID#: SC0000095760)

II.H.2.(a)(2) The Naval Space and Warfare Center, Module Maintenance Facility located at 1690 Avenue A South, Charleston, SC 29408 (EPA ID# SCR000002261).

II.H.2.(b). Thermal Treatment

Hazardous waste military munitions with U. S. Department of Defense markings found within the state of South Carolina may be accepted for treatment at SWMU 43 (Northside

OB/OD Range) as long as the waste meets the requirements of Section VI.B.2 of this

Permit.

II.I. SPECIAL PROVISIONS FOR IGNITABLE, REACTIVE, OR INCOMPATIBLE WASTE

The Permittee shall comply with the requirements of R.61-79.264.17. The Permittee shall follow the procedures for handling ignitable, reactive, and incompatible wastes set forth in Section D of the approved

Permit application.

II.J. LOCATION STANDARDS

The Permittee shall comply with the requirements of R.61-79.264.18 and R.61-104, as applicable.

II.K. PREPAREDNESS AND PREVENTION

II.K.1. Required Equipment

At a minimum, the Permittee shall maintain at the facility the equipment set forth in the approved

Contingency Plan, Section G of the approved Permit application, as required by R.61-79.264.32.

II.K.2. Fire Alarm System

The Permittee shall maintain a fire alarm system in accordance with R.61-79.264.31 and 264.32 and as described in Section G of the approved Permit application.

II.K.3. Testing and Maintenance of Equipment

The Permittee shall test and maintain the equipment specified in Permit Condition II.K.1. and

II.K.2., as necessary, to assure its proper operation in time of emergency, as required by R.61-

79.264.33.

II.K.4. Access to Communications or Alarm Systems

The Permittee shall maintain access to the communications or alarm systems, as required by R.61-

79.264.34.

II.K.5. Required Aisle Space

At a minimum, the Permittee shall maintain adequate aisle space, as required by R.61-79.264.35 and the plans and specifications described in Section D of the approved Permit application.

II.K.6. Arrangements with Local Authorities

The Permittee shall maintain arrangements with state and local authorities, as required by R.61-

79.264.37. If state or local officials refuse to enter into preparedness and prevention arrangements with the Permittee, the Permittee must document this refusal in the operating record.

II.L. MANIFEST SYSTEM

The Permittee shall comply with the manifest requirements of R.61-79.264.71, 264.72, and 264.76.

II.M. GENERAL CLOSURE REQUIREMENTS

II.M.1. Performance Standard

The Permittee shall close the facility as required by R.61-79.264.111 and in accordance with the

Closure Plan included in Section I of the approved Permit application.

II.M.2. Amendment to Closure Plan

The Permittee shall amend the Closure Plan, in accordance with R.61-79.264.112(c), whenever necessary.

II.M.3. Notification of Closure

The Permittee shall notify the Department in writing at least forty-five (45) days prior to the date on which he/she expects to begin final closure of the facility with the following units: container storage (SWMU 44), Subpart X Open Burn /Open Detonation (OB/OD) Unit (SWMU 43) as required by R.61-79.264.112(d).

II.M.4. Time Allowed for Closure

After receiving the final volume of hazardous waste, the Permittee shall treat or remove from the units or facility all hazardous waste and shall complete closure activities in accordance with R.61-

79.264.113 and the schedules specified in the approved Closure Plan, Section I of the approved

Permit application.

II.M.5. Disposal or Decontamination of Equipment, Structures, and Soils

The Permittee shall decontaminate and/or dispose of all contaminated equipment, structures, and soils, as required by R.61-79.264.114 and the approved Closure Plan, Section I of the approved

Permit application.

II.M.6. Certification of Closure

The Permittee shall certify that the unit(s) has been closed in accordance with the specifications in the approved Closure Plan, Section I of the approved Permit application. [R.61-79.264.115]

MODULE III - POSTCLOSURE CARE FOR TANK STORAGE [SWMU 10, SWMU 14]

MODULE III - POSTCLOSURE CARE FOR TANK STORAGE [SWMU 10, SWMU 14]

Module III.

III.A. MODULE HIGHLIGHTS

This module covers the types of wastes disposed in each unit, anticipated dates of closure, length of post closure care for each unit, planned monitoring and maintenance activities, special features associated with the post closure care operation, and a reference to any special Permit condition. This section applies to the following units:

SWMU 10, also known as the Former Waste OTTO Fuel Sump, is located on the eastern side of Building 930

(see Figure 1-3 in the approved Postclosure Plan) and was used for the storage of runoff OTTO Fuel from the storage tank secondary containment system and of OTTO Fuel wastes from torpedo refurbishing and servicing operations at Building 930. OTTO Fuel was used as a torpedo propellant. OTTO Fuel liquid wastes generated during the overhaul of practice torpedoes consisted of a mixture of OTTO Fuel, spent solvent, water

(approximately 95 percent of the waste), and oil. A network of floor drains and downspouts from building service and storage areas collected the waste OTTO Fuel in the sump. The sump was constructed in 1982 of epoxy-sealed concrete and had a 2,500-gallon capacity. When in operation, the sump was pumped out as needed. The sump and building have now been removed and replaced with an engineered cap. The permittee is currently monitoring a volatile organic groundwater plume downgradient of the former sump location.

SWMU 14, a 2500-gallon OTTO Fuel concrete vault, was used from 1982 until 1994 for the storage of waste

OTTO Fuel II from practice torpedo maintenance activities at Building 58. OTTO Fuel was used as a torpedo propellant. The vault and contaminated soil adjacent to the vault were removed in 1999. The Permittee is currently monitoring and remediating a volatile organic groundwater plume downgradient of the former vault location.

The conditions of this module apply to the general postclosure care requirements for the hazardous waste management units as described below in Permit Condition III.B. The conditions for Corrective Action as required by R.61-79.264.100; Detection Monitoring as required by R.61-79.264.98; Compliance Monitoring as required by R.61-79.264.99 are presented in Module IV of this Permit.

III.B. UNIT IDENTIFICATION

The Permittee shall provide postclosure care for the hazardous waste management units described below, subject to the terms and conditions of this permit.

Regulated Unit(s)

Dates Unit(s)

Operated

Total Maximum

Capacity

Description of

Wastes Contained

Hazardous Waste

Number

SWMU 10 1982-2003 2500 gal OTTO II Fuel, solvents

D003

SWMU 14 1982-2003 2500 gal OTTO II Fuel, solvents

D003

III.C. POSTCLOSURE PROCEDURES AND USE OF PROPERTY

III.C.1. Postclosure Care Period

The Permittee shall conduct postclosure care for the hazardous waste management units described in Permit Condition III.B above. Postclosure care will be conducted for thirty (30) years after the completion of closure, except that the thirty (30) year post closure care period may be shortened upon application and demonstration, approved by the Department, that the facility is secure, or may be extended if the Department finds this is necessary to protect human health and the environment.

Post closure care shall be in accordance with R.61-79.264.117 - 120, this Permit, the most recently approved SWMU 10 Postclosure Plan, the most recently approved SWMU 14 Postclosure Plan, and the most recently approved groundwater monitoring report.

III.C.2. Groundwater Monitoring System

The Permittee shall maintain and monitor the groundwater monitoring system and comply with all other applicable requirements of R.61-79.264 Subpart F and module IV of this Permit during the post closure period. [R.61-79.264.117(a)(1)]

III.C.3. Landfill Requirements

The Permittee shall comply with the requirements for landfills as follows: [R.61-79.264.310(b)]

III.C.3.(a). Maintain the integrity and effectiveness of the engineered cap, buildings or paved areas, which function as components of the containment system final cover; including making repairs to the cap, buildings or paved areas, as necessary, to correct the effects of settling, subsidence, erosion, or other events;

III.C.3.(b). Prevent run-on and run-off from eroding or otherwise damaging the final cover;

III.C.3.(c). Protect and maintain surveyed benchmarks used in complying with the surveying and record keeping requirements of R.61-79.264.309.

III.D. INSPECTIONS

III.D.1. Components, Structures and Equipment

The Permittee shall inspect the components, structures, and equipment at the site in accordance with R.61-79.264.117(a)(1)(ii) and the inspection schedule in the most recently approved SWMU

10 Postclosure Plan, and the most recently approved SWMU 14 Postclosure Plan..

III.D.2. Cover System

The engineered cap, buildings and existing pavement at SWMU 10 and SWMU 14 are considered the cover system for these units. The Permittee shall maintain the cover system in an appropriate manner to provide adequate protection from rainwater, run-on, run-off, or intrusion of water to the surficial aquifer. The Permittee shall inspect the cover system for uniformity, drainage, and imperfections as stated in III.C.3 above.

III.E. NOTICES AND CERTIFICATION

III.E.1. Use of units

The Permittee shall not allow SWMU 10 and SWMU 14 to be used in a manner which will disturb the integrity of the engineered cap, buildings or paved areas, which function as components of the containment system, or the function of the facility’s monitoring systems during the postclosure care period. [R.61-79.264.117(c)].

III.E.2. Amendments to Postclosure Plan

The Permittee must request a permit modification to authorize a change in the approved post closure plan. This request must be in accordance with applicable requirements of R.61-79 Parts

124 and 270, and must include a copy of the proposed amendments to the application for approval by the Department. The Permittee shall request a permit modification whenever changes in operating plans or facility design affect the postclosure plan, or other events occur during the active life of the facility that also affect the postclosure plan. The Permittee must submit a written request for a permit modification at least sixty (60) days prior to the proposed change in facility design or operation, or no later than sixty (60) days after an unexpected event has occurred which has affected the postclosure plan. [R.61-79.264.118(d)]

III.E.3. Postclosure Notices

III.E.3.(a). No later than sixty (60) days after certification of closure of each hazardous waste disposal unit, the Permittee shall submit records of the type, location and quantity of hazardous waste disposed within each cell or disposal unit, in accordance with R.61-79.264.119(a).

III.E.4. Removal Request

If the Permittee or any subsequent owner or operator of the land upon which the hazardous waste disposal unit is located wishes to remove hazardous wastes and hazardous waste residues, the liner, if any; or contaminated soils, then he shall request a modification to this post closure permit in accordance with the applicable requirements in R.61-79.124 and 270. The Permittee or any subsequent owner or operator of the land shall demonstrate that the removal of hazardous wastes will satisfy the criteria of R.61-79.264.117(c). [R.61-79.264.119(c)]

III.E.5. Remedy with Land Use Controls

The SWMUs and AOCs for which land use controls are selected as an integral part of the final remedy are listed in Appendix A-8 - SWMUs and AOCs Requiring Land Use Controls. When corrective measures incorporate land use controls as part of the selected remedy, the following information should be provided:

III.E.5.(a). The name, address and phone number of the person to contact about the SWMU or

AOC;

III.E.5.(b). Any necessary security provisions consistent with R.61-79.264.117(b) to prevent unauthorized entry and/or use of the waste unit;

III.E.5.(c). A description of measures to protect the integrity of any installed engineering control(s) and associated features considered as part of the selected remedy, for the period that has to be maintained;

III.E.5.(d). Planned maintenance and monitoring activities, and frequencies to ensure the security provisions are maintained;

III.E.5.(e). An inspection checklist describing the land use control elements to be inspected, the frequency of inspection, and the potential problems that could be encountered. The checklist shall contain an area where the inspector may enter his/her name, the date of inspection, and the date upon which any problems encountered are remediated;

III.E.5.(f). Procedure(s) to follow when a determination is made that the land use control(s) are not effective and require modification;

III.E.5.(g). The mechanism by which a notification will be recorded on the deed for the facility property, or some other instrument which is normally examined during title search, that will in perpetuity notify any potential future purchaser of the property, that the property had been used for waste management and disposal activities and that restrictions exist precluding a residential use of the land. The need for a deed restriction may be reevaluated upon the transfer of ownership or control; and

III.E.5.(h). The mechanism by which other pertinent agencies (State or Federal) will be given notice of restrictions placed on the use of the property, that is affecting or may affect in the future, areas under the control of other State or Federal agencies.

III.E.5.(i). The above information is outlined in detail in Appendix D – Land Use Control

Management Plan (LUCMP).

III.E.6. Certification of Completion of Postclosure Care

No later than sixty (60) days after completion of the established postclosure care period for each hazardous waste disposal unit, the Permittee shall submit to the Department, by registered mail, a certification that the postclosure care for the hazardous waste disposal unit was performed in accordance with the specifications in the approved postclosure Plan. The certification must be signed by the Permittee and an independent registered professional engineer.

(mg/l)

TABLE IV-C

GROUNDWATER MONITORING SCHEDULE

Joint Base Charleston-Weapons

SC8 170 022 620

Charleston and Berkeley Counties

SWMU 10

Please see the groundwater monitoring schedule, Table 4-3, in the most recently approved

SWMU 10 Postclosure Plan.

SWMU 14

Please see the groundwater monitoring schedule, Section 3.0, in the most recently approved

SWMU 14 Postclosure Plan.

MODULE V - CONTAINERS

Module V.

V.A. MODULE HIGHLIGHTS

The conditions of this module apply to the storage of hazardous waste in the hazardous waste storage building

(SWMU 44), having a capacity of 21,200 gallons. The building is constructed of concrete and provided with proper secondary containment systems that have a capacity of 3,377 gallons.

V.B. PERMITTED AND PROHIBITED WASTE IDENTIFICATION

V.B.1. Permitted Waste

The Permittee may store the following wastes in containers at the facility, subject to the terms of this Permit and as follows:

EPA Hazardous Waste Number

D001, D002, D003, D004, D005, D006, D007, D008, D009, D010, D011, D012, D013, D014, D015, D016, D017, D018, D019, D020, D021, D022, D023, D024, D025, D026, D027, D028, D029, D030, D031, D032, D033, D034, D035, D036, D037, D038, D039, D040, D041, D042, D043, F001, F002, F003, F004, F005, F027, P001, P002, P003, P004, P005, P006, P007, P008, P009, P010, P011, P012, P013, P014, P015, P016, P017, P018, P020, P021, P022, P023, P024, P026, P027, P028, P029, P030, P031, P033, P034, P036, P037, P038, P039, P040, P041, P042, P043, P044, P045, P046, P047, P048, P049, P050, P051, P054, P056, P057, P058, P059, P060, P062, P063, P064, P065, P066, P067, P068, P069, P070, P071, P072, P073, P074, P075, P076, P077, P078, P081, P082, P084, P085, P087, P088, P089, P092, P093, P094, P095, P096, P097, P098, P099, P101, P102, P103, P104, P105, P106, P108, P109, P110, P111, P112, P113, P114, P115, P116, P118, P119, P120, P121, P122, P123, P127, P128, P185, P188, P189, P190, P191, P192, P194, P196, P197, P198, P199, P201, P202, P203, P204, P205, U001, U002, U003, U004, U005, U006, U007, U008, U009, U010, U011, U012, U014, U015, U016, U017, U018, U019, U020, U021, U022, U023, U024, U025, U026, U027, U028, U029, U030, U031, U032, U033, U034, U035, U036, U037, U038, U039, U041, U042, U043, U044, U045, U046, U047, U048, U049, U050, U051, U052, U053, U055, U056, U057, U058, U059, U060, U061, U062, U063, U064, U066, U067, U068, U069, U070, U071, U072, U073, U074, U075, U076, U077, U078, U079, U080, U081, U082, U083, U084, U085, U086, U087, U088, U089, U090, U091, U092, U093, U094, U095, U096, U097, U098, U099, U101, U102, U103, U105, U106, U107, U108, U109, U110, U111, U112, U113, U114, U115, U116, U117, U118, U119, U120, U121, U122, U123, U124, U125, U126, U127, U128, U129, U130, U131, U132, U133, U134, U135, U136, U137, U138, U140, U141, U142, U143, U144, U145, U146, U147, U148, U149, U150, U151, U152, U153, U154, U155, U156, U157, U158, U159, U160, U161, U162, U163, U164, U165, U166, U167, U168, U169, U170, U171, U172, U173, U174, U176, U177, U178, U179, U180, U181, U182, U183, U184, U185, U186, U187, U188, U189, U190, U191, U192, U193, U194, U196, U197, U200, U201, U202, U203, U204, U205, U206, U207, U208, U209, U210, U211, U213, U214, U215, U216, U217, U218, U219, U220, U221, U222, U223, U225, U226, U227, U228, U234, U235, U236, U237, U238, U239, U240, U243, U244, U246, U247, U248, U249, U271, U278, U279, U280, U328, U353, U359, U364, U367, U372, U373, U387, U389, U394, U395, U404, U409, U410, U411

These hazardous waste codes may be listed alone or in conjunction with other hazardous waste codes (denoting a waste stream) in the Part A application. A description of each hazardous waste/hazardous waste stream is listed in Table C-1 of Section C of the Part B permit application.

V.B.2. Non-Permitted Waste

The Permittee is prohibited from storing hazardous waste in the hazardous waste container storage facility that is not identified in Permit Condition V.B.1.

V.B.3. Quantity of Waste

The Permittee may store a maximum of 21,200 gallons of the hazardous waste identified in Permit

Condition V.B.1 in the hazardous waste container storage building.

V.C. CONDITION AND TYPES OF CONTAINERS

If a container…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .