FA8903-14-R-0004_(Amendment_3).pdf

PDF 214 KB Posted

Attached to
Fairchild AFB Performance Based Remediation Federal contract opportunity
Solicitation number
FA8903-14-R-0004
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Fairchild PBR Amendment 3 (SF30)

View the file

Other files for this federal contract opportunity

Other files attached to Fairchild AFB Performance Based Remediation, newest first.
File Type Posted
FA8903-14-R-0004-0004_(Amendment_4).pdf PDF
FA8903-13-R-0060_Enclosure_2_Key_Documents_Fairchild_PBR_1-9-14.pdf PDF
Attch_1E3_Encl_3_-_Acronyms_and_Definitions_9Jan2014_tracked.docx DOCX document
Attch_1E3_Encl_3_-_Acronyms_and_Definitions_9Jan2014_clean.pdf PDF
Fairchild_FINAL_RFP_-_Questions_and_Responses.pdf PDF
SECTION_L_Amendment_31Dec2013_clean.pdf PDF
SECTION_L_Amendment_31Dec2013_tracked.pdf PDF
SECTION_M_Amendment_31Dec2013_clean.pdf PDF
SECTION_M_Amendment_31Dec2013_track.pdf PDF
FA8903-14-R-0004-0002_(Amendment_2).pdf PDF
SECTION_L_AttchL-6_CLIN_MPS_Guidance_30Dec13.pdf PDF
FA8903-14-R-0004.pdf PDF
FA8903-14-R-0004_Amendment_01.pdf PDF
SECTION_L_Attch_L-7_Tax_Liability.rtf RTF text file
SECTION_L_Attch_L-5_Client_Authorization_Letter_Sample_5Sep13.docx DOCX document
Fairchild_Draft_RFP_and_Site_Visit_-_Questions_and_Responses.pdf PDF
SECTION_L_Attch_L-3_Past_Performance_Questionnaire_5Sep13.docx DOCX document
SECTION_L_Attch_L-4_Subcontractor_Consent_Letter_Sample_5Sep13.docx DOCX document
Fairchild_PBR_-_Section_M.pdf PDF
SECTION_L_Attch_L-1_MPS_without_Price_5Sept13.xls XLS spreadsheet
SECTION_L_Attch_L-6_CLIN_MPS_Guidance_3Dec13.docx DOCX document
SECTION_L_Attch_L-2_MPS_with_Price_5Sept13.xls XLS spreadsheet
FA8903-14-R-0004.pdf PDF
Fairchild_PBR_-_Section_L.pdf PDF
FAFB_Contracting_Slides_23_Oct_13_Final.pdf PDF
Final_Site_Visit_Agenda_Fairchild_PBR.pdf PDF
Addendum_to_Site_Visit_Slides_Final_23_Oct_13.pdf PDF
Fairchild_SubCLIN_Overview_1Oct13_dm.pdf PDF
Site_Visit_Slides_Final_23_Oct_13_ Read-Only .pdf PDF
AFCEC_Fairchild_PBR_Overview_Slides_23_Oct_13_Final.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY 772ESS/PKS CODE FA8903 7. ADMINISTERED BY (If other than Item 6) CODE

772D ENTERPRISE SOURCING SQUADRON

2261 HUGHES AVE STE 163

JBSA LACKLAND TX 78236-9853

CHRISTINA G. FERNANDEZ 210-395-8705

christina.fernandez@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA8903-14-R-0004

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Performance Based Remediation at Fairchild Air Force Base

The purpose of this Amendment is to replace/incorporate Enclosures 2 and 3 and extend the proposal due date.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

LINDA L. CAVAZOS

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 09 Jan 2014 2:50 PM

SCHEDULE OF CHANGES

FA8903-14-R-0004 0003

1. This Amendment incorporated the following revised documents:

a. Attachment 1E2 - PWS Enclosure 2, dated 2 January 2014 is replaced with Attachment 1E2 - PWS Enclosure 2, dated 9 January 2014.

b. Attachment 1E3 - PWS Enclosure 3, dated 5 September 2013 is replaced with Attachment 1E3- PWS Enclosure 3, dated 9 January 2014.

2. The proposal due date has changed from 1:00 PM CT on 24 January 2014 to 1:00 PM CT on 31 January 2014.

3. No other revisions are made.

LIST OF ATTACHMENTS

FA8903-14-R-0004 0003

DOCUMENT PGS DATE TITLE

ATTACHMENT 1E2 10 09 JAN 2014 PERFORMANCE WORK STATEMENT

ENCLOSURE 2 - KEY DOCUMENTS

ATTACHMENT 1E3 7 09 JAN 2014 PERFORMANCE WORK STATEMENT

ENCLOSURE 3 - ACRONYMS AND DEFINITIONS

PERFORMANCE-BASED REMEDIATION AT FAIRCHILD AFB, WA

KEY DOCUMENTS

FA8903-14-R-0004

Enclosure 2

9 January 2014

Folder Name File Name

AOC01

Washington State Department of Ecology Letter to Base Concurring with No Action Determination For Area of Concern (AOC) 1, Building 2115

AOC02

Washington State Department of Ecology Letter to Base Concurring with No Action Determination For Area of Concern (AOC) 2, Building 2163

Compliance Sites (OWS/TU) Site OW055 (OW-C551) Building 1060 OWS/Budinger_2012_X11192 Report W Attachments.pdf Compliance Sites (OWS/TU) Site OW063 (OW-C556) Building 2024 OWS/Budinger_2012X11192 Report W Attachments.pdf Compliance Sites (OWS/TU) Compliance Restoration Program Site Projects - REV.pptx Compliance Sites/2011 Site Visit and DERA Eligibility SV_FRCHD_FNL_Rev1 Compliance Sites/2011 Site Visit and DERA Eligibility TER_FRCHD_FNL Compliance Sites/Tank Assessment Reports App A2 - List of Emergency Generators, ASTs, and OWS in Fairchild AFB Database Compliance Sites/Tank Assessment Reports App A3 - List of USTs in Fairchild AFB Database Compliance Sites/Tank Assessment Reports App A4 - SS-C500 Compliance Sites/Tank Assessment Reports App A5 - SS-C501 Compliance Sites/Tank Assessment Reports App A6 - SS-C502 Compliance Sites/Tank Assessment Reports App A7 - SS-C503 Compliance Sites/Tank Assessment Reports App A8 - SS-C505 Compliance Sites/Tank Assessment Reports App A10 - TU-US-C507 Compliance Sites/Tank Assessment Reports App A11 - TU-US-C508 Compliance Sites/Tank Assessment Reports App A12 - TU-US-C509 Compliance Sites/Tank Assessment Reports App A14 - TU-US-C511 Compliance Sites/Tank Assessment Reports App A13 - TU-US-C511 Compliance Sites/ Tank Removal Reports OW-C518 Compliance Sites/ Tank Removal Reports OW-C519 Compliance Sites/ Tank Removal Reports OW-C520 Compliance Sites/ Tank Removal Reports OW-C521 Compliance Sites/ Tank Removal Reports OW-C522 Compliance Sites/ Tank Removal Reports OW-C523 Compliance Sites/ Tank Removal Reports OW-C524 Compliance Sites/ Tank Removal Reports OW-C526 Compliance Sites/ Tank Removal Reports OW-C538 Compliance Sites/ Tank Removal Reports OW-C542 Compliance Sites/ Tank Removal Reports OW-C543 Compliance Sites/ Tank Removal Reports OW-C544 Compliance Sites/ Tank Removal Reports OW-C546 Compliance Sites/ Tank Removal Reports OW-C547 Compliance Sites/ Tank Removal Reports OW-C548 Compliance Sites/ Tank Removal Reports OW-C549 Compliance Sites/ Tank Removal Reports OW-C550 Compliance Sites/ Tank Removal Reports OW-C551 Compliance Sites/ Tank Removal Reports OW-C556 Compliance Sites/ Tank Removal Reports OW-C558 Compliance Sites/ Tank Removal Reports OW-C575 PBR Guidance Documents AF PBR Guidebook_Final_3Jan2012.pdf PBR Guidance Documents AFCEC AR Metadata Format, March2013.pdf PBR Guidance Documents CLIN_MPS_IMS_Guidance_Template_26Mar12.doc

File Location Link: https://drive.google.com/folderview?id=0B6KemF4_69U4UEV1emN5ZlVlTEk&usp=sharing

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 2 of 10Folder Name File Name

PBR Guidance Documents Document Review Process Template_Under Review_Mar2013.docx PBR Guidance Documents Draft AFCEC OES Compendium for PBR.doc PBR Guidance Documents ERPIMS slides for PBR-Kickoff Briefing_revised_16Jan.pptx PBR Guidance Documents Instructions to develop a Project Management Plan (PMP) V09 28 Sep 11.docx PBR Guidance Documents Template Sample for PBR Repository V6.0 3-25-2013.docx Multiple Sites\HASP Health and Safety Plan_Rev1_Jun09.pdf Multiple Sites\HASP Fairchild_AFB_ Draft-Final_HASP.pdf

Multiple Sites\EQM QAPP for Remedial Action Operations, IRP Priority 1 and Priority 2 Sites, FAFB, WA, DRAFT, EQM, Dec 2006.pdf

Multiple Sites\EQM Work Plan for Remedial Action Operations, IRP Priority 1 and Priority 2 Sites, FAFB, WA, DRAFT, EQM, Dec 2006.pdf

Multiple Sites\EQM Field Sampling Plan for Remedial Action Operations, IRP Priority 1 and Priority 2 Sites, FAFB, WA, DRAFT, EQM, Dec 2006.pdf

Multiple Sites\RAB\2000 Restoration Advisory Board Minutes for Regular Meeting-AR1997_Mar 23, 2000 Multiple Sites\RAB\2000 Restoration Advisory Board Minutes for Regular Meeting-AR1998_Sept 7, 2000 Multiple Sites\RAB\2001 Restoration Advisory Board Minutes for Regular Meeting-AR1999_Mar 8, 2001 Multiple Sites\RAB\2001 Restoration Advisory Board Minutes for Regular Meeting-AR2000_Jun 14, 2001 Multiple Sites\RAB\2002 Restoration Advisory Board Minutes for Regular Meeting-AR2001_Feb 14, 2002 Multiple Sites\RAB\2002 Restoration Advisory Board Minutes for Regular Meeting-AR2002_Aug 8, 2002 Multiple Sites\RAB\2002 Restoration Advisory Board Minutes for Regular Meeting-AR2003_Nov 21, 200 Multiple Sites\RAB\2003 Restoration Advisory Board Minutes for Regular Meeting-AR2004_Mar 13, 2003 Multiple Sites\RAB\2003 Restoration Advisory Board Minutes for Regular Meeting-AR2005_Aug 21, 2003 Multiple Sites\RAB\2004 Restoration Advisory Board Minutes for Regular Meeting-AR2006_Mar 18, 2004 Multiple Sites\RAB\2004 Restoration Advisory Board Minutes for Regular Meeting and Meeting Agenda-AR2007_Dec 16, 2004 Multiple Sites\RAB\2005 Restoration Advisory Board Minutes for Regular Meeting and Meeting Agenda-AR2008_Sept 6, 2005 Multiple Sites\RAB\2005 Restoration Advisory Board Minutes for Regular Meeting-AR2009_Nov 29, 2005 Multiple Sites\RAB\2006 Restoration Advisory Board Minutes for Regular Meeting and RAB Agenda-AR2010_Dec 12, 2006 Multiple Sites\RAB\2006 Restoration Advisory Board Minutes for Regular Meeting and RAB Agenda-AR2011_Dec 12, 2006 Multiple Sites\RAB Final RAB Minutes (Dec 2011 Meeting).doc Multiple Sites\RAB 29 October 2012 RAB Minutes Multiple Sites 1Q08 Data Report.pdf Multiple Sites 1Q10 Data Report - DRAFT.pdf Multiple Sites 1Q11 Data Report_rev1.pdf Multiple Sites 1Q2012 Data Report_rev0.pdf Multiple Sites 2nd Quarter 2010 RA-O Report.pdf Multiple Sites 2Q09 Data Report.rev1.pdf Multiple Sites 3Q09 Data Report.pdf Multiple Sites 3Q10 Data Report.pdf Multiple Sites 3Q11_DataReport_rev1.pdf Multiple Sites 4th Qtr and Annual 2009 FAFB Report_Rev2.pdf Multiple Sites 4th Qtr and Annual 2010 FAFB Report_rev2.pdf Multiple Sites 4th Qtr and Annual 2011 RA-O Report_Rev1.pdf Multiple Sites 8595 TO 0321 2Q08 FAFB Data Report.pdf Multiple Sites 8595 TO 0321 FAFB 3Q08 RA-O Report.pdf Multiple Sites Attachment A - Synoptic Water Level Survey, AECOM, June 2012.pdf Multiple Sites Attachment C - Synoptic Water Level Survey, AECOM, June 2012.pdf Multiple Sites Attachment D - Synoptic Water Level Survey, AECOM, June 2012.pdf

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 3 of 10Folder Name File Name

Multiple Sites Attachment E - Synoptic Water Level Survey, AECOM, June 2012.pdf Multiple Sites Draft 4th Qtr and Annual 2005 FAFB Report.pdf Multiple Sites D_FC_A001B.pdf Multiple Sites Fairchild AFB Phytostabilization Final Report - August 2010.pdf Multiple Sites FINAL 4th Qtr and Annual 2006 FAFB Report 05-29-08.pdf Multiple Sites FINAL 4th Qtr and Annual 2007 FAFB Report.pdf Multiple Sites FINAL Fairchild Second Five Year Review _26 June 08_.pdf Multiple Sites F_FC_A001B.pdf Multiple Sites Non-ERASites Report_rev1.pdf Multiple Sites Supplemental_RE_PRGs_Rev1.pdf Multiple Sites Synoptic Water Level Survey, AECOM, June 2012.pdf Multiple Sites Signed Third Five-Year_Review_(Final)_Fairchild AFB_(22_Jul_13).pdf Multiple Sites pdf-guidance-for-contractors-v09282010.pdf Multiple Sites Fairchild Ltr_Kim Prestbo 9.18.13 Multiple Sites 2000 Five-Year Review Report, Fairchild Air Force Base Multiple Sites Final Work Plan for 2000 Long Term Monitoring for Priority 1, 2 and 3 Sites and Residential Wells

Multiple Sites Final Quality Program Plan for 2000 Long Term Monitoring for Priority 1, 2 and 3 Sites and Residential Wells

Multiple Sites Final Quality Program Plan for 2001 Long Term Monitoring for Priority 1, 2 and 3 Sites and Residential Wells Multiple Sites Final Work Plan for 2001 Long Term Monitoring for Priority 1, 2 and 3 Sites and Residential Wells

Multiple Sites Final Project Planning Documents for Pump-and-Treat Systems Operation, Craig Road Landfill and WW-1 Sites

Multiple Sites Final Quality Program Plan for 2002 Long-Term Monitoring for Priority 1 Sites (SW-1, PS-8, and WW-1) and Residential Wells

Multiple Sites Final Work Plan for 2002 Long-Term Monitoring for Priority 1 Sites and Residential Wells

Multiple Sites Final Quality Program Plan for 2001 Long Term Monitoring for Priority 1 and 3 Sites and Residential Wells Multiple Sites WW-1, Remedial Action Operations, 2003 Reports Multiple Sites Remedial Action Operations 2003 Report, Sites LF-02 and WP-03 Multiple Sites Final 2002 Annual Long-Term Monitoring, Priority 1 Sites (Sites SW-1, PS-8, and WW-1)

Multiple Sites Final Project Planning Documents for Remedial Action Operations, Craig Road Landfill and WW-1 Sites

Multiple Sites Operations and Maintenance Manual, Groundwater Extraction System, Volume I, Site LF-02 and WP-03

Multiple Sites Operations and Maintenance Manual, Groundwater Extraction System, Volume II, Site LF-02 and WP-03

Multiple Sites Operations and Maintenance Manual, Groundwater Extraction System, Volume III, Site LF-02 and WP-03

Multiple Sites Informal Technical Information Report, 2002 Remedial Action Operations for Priority 1 and 2 Sites, FT-1, PS-2, PS-1, FT-2 and IS-4

Multiple Sites Final 2003 Annual Remedial Action-Operations Report, Priority 1 and 2 Sites Multiple Sites Final Land Use Controls Management Plan

Multiple Sites Final Remedial Action-Operations Report, Fourth Quarter and Annual 2008, Revision 2, Priority 1 and 2 Sites Multiple Sites Management Action Plan

Multiple Sites

Base Letter to Washington State Department of Ecology Updating Washington State Department of Ecology With Information Concerning Current Base Remedial Project Managers and Current Environmental Restoration Program Projects

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 4 of 10Folder Name File Name

Multiple Sites Washington State Department of Ecology Letter to Base Transmitting Review Comments on the Remedial Action-Operations Report, Fourth Quarter and Annual 2008, Priority 1 and 2 Sites

Multiple Sites Final 2004 Annual Remedial Action-Operations Report for Priority 1 and 2 Sites (FT-1, PS-2, PS-8, PS-1, FT-2 and

IS-4)

Multiple Sites Third Quarter 2005 Remedial Action-Operations Report for Sites FT-1, PS-2, PS-8, PS-1, FT-2 and IS-4

Multiple Sites CH2M Hill Letter to AFCEE/ICM Transmitting Third Quarter 2005 Remedial Action-Operations Report for Sites FT-1, PS-2, PS-8, PS-1, FT-2 and IS-4)

Multiple Sites

CH2M Hill Letter to AFCEE/ICM Transmitting Draft Fourth Quarter and Annual 2005 Remedial Action- Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2) Dated May 2006

Multiple Sites Draft Fourth Quarter and Annual 2005 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites First Quarter 2006 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Second Quarter 2006 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS- 8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Third Quarter 2006 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Fourth Quarter and Annual 2006 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW- 1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites CH2M Hill Letter to AFCEE/ICM Transmitting Fourth Quarter and Annual 2006 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites CH2M Hill Letter to AFCEE/ICM Transmitting Fourth Quarter and Annual 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites First Quarter 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Second Quarter 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS- 8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Third Quarter 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites Fourth Quarter and Annual 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW- 1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites CH2M Hill Letter to Base Transmitting Fourth Quarter and Annual 2008 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites First Quarter 2009 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites CH2M Hill Letter to Base Transmitting First Quarter 2009 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites CH2M Hill Letter to AFCEE/ICM Transmitting First Quarter 2007 Remedial Action-Operations Report for Priority 1 and 2 Sites (Sites SW-8, SW-1, PS-2, PS-8, FT-1, WW-1, PS-1, IS-4, and FT-2)

Multiple Sites

Washington State Department of Ecology Letter to Base Transmitting Review Comments on the Remedial Process Optimization Reports for Craig Road Landfill, Site SW-8; Fire Training Area, Site FT-1; and Bulk Fuel Storage Area, Site PS-1

Multiple Sites Remedial Process Optimization Report, Response Complete Justification for Fairchild AFB IRP Sites FT-2 and IS-4 Multiple Sites Draft-Annual_GFAFB_SLA_inspection_9Jul10(2).pdf Multiple Sites Fairchild_AFB_Draft-Final_HSAP.pdf Multiple Sites FairchildAFB_SamplingPlanUpdate_November2012.pdf Multiple Sites Phase 1 Records Search Report_Jan1985

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 5 of 10Folder Name File Name

Multiple Sites Final Phase II Stage 1, Confirmation/Quantification Report, Vol I of IV_April1989 Multiple Sites Final Phase II Stage 1, Confirmation/Quantification Report, Vol II of IV_Feb1989 Multiple Sites Final Phase II Stage 1, Confirmation/Quantification Report, Vol III of IV_Feb1989 Multiple Sites Final Phase II Stage 1, Confirmation/Quantification Report, Vol IV of IV_Feb1989 Multiple Sites Final RI Report, Vol I of III, On-Base Priority 1 Sites_Feb1993 Multiple Sites Final RI Report, Vol II of III, On-Base Priority 1 Sites_Feb1993 Multiple Sites Final RI Report, Vol III of III, On-Base Priority 1 Sites_Feb1993 Multiple Sites Final FS Report, Vol I of II, On-Base Priority 1 OU_Feb1993 Multiple Sites Final FS Report, Vol II of II, On-Base Priority 1 OU_Feb1993

Multiple Sites Halliburton NUS Letter to AFCEE/ESR Transmitting Review Comments from EPA Region X and Washington State Department of Ecology on Priority One Sites Draft Final Record of Decision

Multiple Sites Final Limited Field Investigation Report for Priority 2 Sites_Sep1992 Multiple Sites Final Remedial Investigation Report for Priority 2a Sites_Feb1995 Multiple Sites Final Feasibility Study Report for Priority 2a Sites_Apr1995 Multiple Sites Draft Final IRP Priority 2b Sites Facilities Summary Report_Nov1993

Multiple Sites Final Site Investigation Report for Eight Areas of Concern, Sites SW-6 (RW-11) and SW-13 (OT-15), and Orphan Trichloroethene Plumes_Nov1996

Multiple Sites AR-356 (Fairchild AFB Federal Facilities Agreement).pdf Multiple Sites Compliance Cleanup Sites Final ER 2009.pdf Multiple Sites AECOM_2012_BasewideCSM_FairchildAFB.pdf Multiple Sites ERP Update - FAFB (29 Oct 12 RAB).ppt Multiple Sites Fairchild_29Oct2012_BasewideCSMUpdate (MBC).ppt Multiple Sites 2012_OctoberRAB_RA-O_Update_Rev0.pptx Multiple Sites Draft 1Q RAO 2013.pdf Multiple Sites Draft 4Q and Annual RAO2012.pdf Multiple Sites Draft MultiSiteRAO and LTM QAPP November 2013.pdf

Multiple Sites Washington State Department of Ecology Letter to Base Concurring With Base's Status as Response Complete for Site OT-15, Explosive Ordnance Disposal (EOD)

Multiple Sites Limited Field Investigation Report P2 Sites 1992 Multiple Sites March 1994 NFA Decision Document PS-3 and SW-7 Multiple Sites Multisite Final Closure Report 1998 OHM March 1994 NFA Decision Document PS-3 and SW-7 Multiple Sites September 1992 NFA Decision Document Select P2 Sites March 1994 NFA Decision Document PS-3 and SW-7 Multiple Sites UST Closure Report 1998 March 1994 NFA Decision Document PS-3 and SW-7 Site RW011 (SW-6) Weapons Storage Area Radioactive Disposal Area USACE_2008_RW11_Suppl_Site_Invest_Rpt_2009_09_(draft) Site RW011 (SW-6) Weapons Storage Area Radioactive Disposal Area USACE_2008_RW11_Suppl_Site_Invest_Rpt_2009_09_(draft)_Atch_F_Lab_Data Site RW011 (SW-6) Weapons Storage Area Radioactive Disposal Area USACE_Ahtna_2012_Fairchild_Final_Field_Report Site RW011 (SW-6) Weapons Storage Area Radioactive Disposal Area Final_RW-11_Well_Install_TM_Rev2_Sept2013.pdf Site SR939 Site Machine Gun Range\Phase I Fairchild Final Qualitative Assessment Report.pdf Site SR939 Site Machine Gun Range\Phase I Final Cover Letter Fairchild.pdf Site SR939 Site Machine Gun Range\Phase I Response to Comments.pdf Site SR939 Site Machine Gun Range\Phase II FairchildAFB_Final_PhaseII_QAReport.pdf Site SR939 Machine Gun Range\Phase II\Appendices AppendixA_FieldNotebook.pdf Site SR939 Machine Gun Range\Phase II\Appendices AppendixB_Photograph Log.pdf Site SR939 Machine Gun Range\Phase II\Appendices AppendixD_FCH_MGR-SESOILResults.pdf Site SR939 Machine Gun Range\Phase II\Appendices\AppendixC_Analytical Results Accutest Analytical Report.pdf

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 6 of 10Folder Name File Name

Site SR939 Machine Gun Range\Phase II\Appendices\AppendixC_Analytical Results Test America Analytical Report.pdf Site LF001 (SW-1) Old Base Landfill Old Base Landfill, Site SW-1, Remedial Action Operations Annual Report Site LF001 (SW-1) Old Base Landfill Remedial Action-Operations (RA-O), Annual 2004 Report for Old Base Landfill, Site SW-1

Site LF001 (SW-1) Old Base Landfill CH2M Hill Letter to AFCEE/ICM Transmitting Draft 2004 Annual Remedial Action-Operations (RA-O) Report for Old Base Landfill, Site SW-1

Site LF002 (SW-8) Craig Road Landfill 0007-0001_CRL-NDA_ ISCO_2012_DesignTM_02Oct12.pdf Site LF002 (SW-8) Craig Road Landfill Remedial Action Operations 2004 Report, Sites LF-02 and WP-03

Site LF002 (SW-8) Craig Road Landfill CH2M Hill Letter to AFCEE/ICM Transmitting the Final 2004 Remedial Action-Operations Fourth Quarter and Annual Report for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill Remedial Process Optimization Report for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill CH2M Hill Letter to AFCEE/ICM Transmitting 2005 Remedial Action-Operations First Quarter Report for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill CH2M Hill Letter to AFCEE/ICM Transmitting Draft 2005 Remedial Action-Operations Third Quarter and Annual Report for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill 2005 Quarterly and Annual Reports for Remedial Action-Operations First Quarter, Second Quarter, Third Quarter and Annual Report for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill Remedial Process Optimization Report, Groundwater Extraction and Treatment System for Craig Road Landfill, Site LF-02

Site LF002 (SW-8) Craig Road Landfill Craig Road Landfill LF002, WPISCO Phase I.pdf Site LF002 (SW-8) Craig Road Landfill CRL MIP TECHNICAL MEMORANDUM 073009 combined.pdf Site LF002 (SW-8) Craig Road Landfill Final_CRLworkplan_May09_rev1 withfigures.pdf Site LF002 (SW-8) Craig Road Landfill CRL-PathForwardTechMemo_Aug2009.pdf Site LF002 (SW-8) Craig Road Landfill Final_Triad-Based CRL WP_May09_rev1 withfigures.pdf Site LF002 (SW-8) Craig Road Landfill 0007-0001_CRL-PathForwardMemo_Aug2009.pdf Site LF002 (SW-8) Craig Road Landfill Draft_CRL_Tech Memo_ISCO-Injection_WPAdden_Jul10.pdf Site LF002 (SW-8) Craig Road Landfill FAFB_ISCO-InjectionWP_July2010.pdf Site LF002 (SW-8) Craig Road Landfill Fairchild_Draft_SVE_PilotTest_Estimate.pdf Site LF002 (SW-8) Craig Road Landfill Fairchild_Draft_SVE_PilotTest_TechMemo.pdf Site LF002 (SW-8) Craig Road Landfill TechMemo_CRL_SVE_PilotTestResults_10Sept10 (2).pdf Site LF002 (SW-8) Craig Road Landfill CAH4717_Aug03 pdf - Adobe Acrobat.pdf Site LF002 (SW-8) Craig Road Landfill CRL_SVE_PilotTestResults_10Sept10.pdf Site LF002 (SW-8) Craig Road Landfill CRL-NDA ISCO Tech Memo_Nov12.pdf Site LF002 (SW-8) Craig Road Landfill EPA comments - 2011 4th Qtr Annual RA-O Rpt_Oct12.pdf Site LF002 (SW-8) Craig Road Landfill LF002_Optimization-ExitStrategy_TM_3-5-13_updated.pdf Site LF002 (SW-8) Craig Road Landfill Treatability Study Rpt_CRL_Rev0_Aug13.pdf Site LF002 (SW-8) Craig Road Landfill 0007-0001_LF002_Optimization-ExitStrategy_TM_3-5-13_updated.pdf Site LF002 (SW-8) Craig Road Landfill Final RI Report, Vol I of II, Craig Road Landfill_April1992 Site LF002 (SW-8) Craig Road Landfill Final RI Report, Vol II of II, Craig Road Landfill_April1992 Site LF002 (SW-8) Craig Road Landfill Remedial Investigation / Feasibility Study Report, Craig Road Landfill_July1992 Site LF002 (SW-8) Craig Road Landfill Draft Record of Decision, Site LF-02_Feb1993

Site LF002 (SW-8) Craig Road Landfill Final 2004 Remedial Action-Operations Fourth Quarter and Annual report for Craig Road Landfill, Site LF02 Site LF002 (SW-8) Craig Road Landfill Site LF002 Draft SVE and ISCO TR October2013.pdf Site LF002 (SW-8) Craig Road Landfill Draft LF002 SDA SVE OMM 2013

Site SD034 (AOC-4) Contaminated Soil at Building 1012 Base Memorandum to HQ AMC/A7N Requesting Concurrence With the Remedy in Place (RIP) Determination for Site SD-34

Site SD037 (AOC-7) GW and Soil Contamination at OWS Project Planning Documents.pdf

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 7 of 10Folder Name File Name

Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37 Groundwater Monitoring Report_April 2010_rev1.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37 Groundwater Monitoring Report_October 2009_Rev1.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37 Groundwater Monitoring Report_Spring 2009_Rev1.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37Bldg2447PilotTestingTM_rev1.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37GroundwaterMonitoringReport_October2010.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS SD-37_Pre-RAPilotTestWP_Rev2.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Work Plan, Remedial Investigation/Feasibility Study, Version 1.0, Site SD-37 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Health and Safety Plan, Remedial Investigation/Feasibility Study, Version 1.0, Site SD-37 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Sampling and Analysis Plan, Remedial Investigation/Feasibility Study, Version 1.1, Site SD-37 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Remedial Investigation Report, Site SD-37, Volume 1 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Remedial Investigation Report, Site SD-37, Volume 2 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Remedial Investigation Report, Site SD-37, Volume 3 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Remedial Investigation Report, Site SD-37, Volume 4 Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Feasibility Study Report, Site SD-37 Site SD037 (AOC-7) GW and Soil Contamination at OWS KTA_2008_2008.06.03_Draft FAFB Site SD-37 Supplemental RA and FS Tech eMemos.pdf.pdf Site SD037 (AOC-7) GW and Soil Contamination at OWS Final Sustainable Bioreactor Demonstration Project Summary Report_May2012.pdf Site SS019 (SS-C514) Mercury Valve Vault Site 01.Hg_valve_vaut(P1000086).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 04.exclusion_zone_east and swale (P1000081).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 0839_001.pdf Site SS019 (SS-C514) Mercury Valve Vault Site 09.vault_discharge_pipe_excavation(P1000112).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 10.swale_area3_excavation(P1000129).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 13.swale_area1_excavation(P1000165).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 16.valve_vault_decon_entry(P1000158).JPG Site SS019 (SS-C514) Mercury Valve Vault Site 22.well_install_east_of_swale(P1010005).JPG Site SS019 (SS-C514) Mercury Valve Vault Site Facility 1240 Altitude Valve.JPG Site SS019 (SS-C514) Mercury Valve Vault Site Government Determination -Mercury Results - Fairchild AFB (13Jul12).pdf Site SS019 (SS-C514) Mercury Valve Vault Site image2011-12-19-095117.pdf Site SS019 (SS-C514) Mercury Valve Vault Site IMG_20120717_093058_mod.jpg Site SS019 (SS-C514) Mercury Valve Vault Site Kick-off_Agenda_and_Minutes_9-22-11.pdf Site SS019 (SS-C514) Mercury Valve Vault Site MercuryValveVaultSite_RemRpt_rev0 reduced.pdf Site SS019 (SS-C514) Mercury Valve Vault Site Mercury_Valve_Vault_Plans.pdf Site SS019 (SS-C514) Mercury Valve Vault Site Pre-Con_MeetingMinutes_03-27-12.pdf

Site SS019 (SS-C514) Mercury Valve Vault Site RE Fairchild AFB Mercury Valve Vault Site SS-C514 Vapor Monitoring results following Decontamination of the Valve Vault.msg

Site SS019 (SS-C514) Mercury Valve Vault Site S10-005.3 MSA Water Tower Mercury Soils Rpt.pdf Site SS019 (SS-C514) Mercury Valve Vault Site Site_SS-C514_Mercury_wipe_sample_results_memo.pdf Site SS019 (SS-C514) Mercury Valve Vault Site TM_FRCHD_SS-C514_FNL.pdf Site SS019 (SS-C514) Mercury Valve Vault Site work plan supplement memo - Hg valve vault.pdf Site SS019 (SS-C514) Mercury Valve Vault Site Site SS019 Draft AM August2013.pdf Site SS019 (SS-C514) Mercury Valve Vault Site Site SS019 Draft AM EPA R10 Letter November 2013.pdf

Site SS033 (AOC-3) SWMU-18 Solvent Storage at Building 2163 Base Memorandum to HQ AMC/A7N Requesting Concurrence With the Remedy in Place (RIP) Determination for Site SS-33

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume CSM_WorkPlan_SAP_Update_Aug2011 Site SS039 (OU-5) Chlorinated Hydrocarbon Plume CSM_FSP_rev1.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume CSM_QAPP_rev1.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume CSM_Workplan_rev2.pdf

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 8 of 10Folder Name File Name

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Fairchild_SS-39_RAWP_Rev1_04-28-09.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final_FAFB 2008_12-17SECURED.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final_FAFB FFS 08_04-08.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume In-Situ Pilot Testing for SS-39_rev3.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39 CSM Update Baseline Well Install TM_Rev1.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39 In-Situ Pilot Testing rev5.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39PilotTestingTM_rev2.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39Pre-ROD_April09_DataReport_rev1.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39Pre-ROD_July09_Rev1_DataReport.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_Synoptic_GW-MonTM_CD.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_Synoptic_GW-MonTM_rev1.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_Synoptic_GW-MonTM_rev2 7-9-12.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_VI_Draft_FSP_Rev2.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_VI_QAPP_Draft_Rev2.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume SS-39_VI_WorkPlan_Draft_Rev2.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Vapor_Intrustion_Planning_Documents.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final Proposed Plan Report for Site SS-39, Fairchild AFB, Washington

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final Public Transcript Titled, "Site SS-39 Proposed Plan Public Meeting, 92nd Air Refueling Wing, Fairchild AFB" Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Draft Feasibility Study Report for Site SS-39, Fairchild AFB, Washington Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final Phase II Remedial Investigation Report for Site SS-39, Fairchild AFB, Washington Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Focused Feasibility Study Report for Site SS-39, Fairchild AFB, Washington

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to US EPA Region X Concerning Air Force Plans for the Officer Capehart Housing Area (OCHA) and Site SS-39

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to US EPA Region X Presenting Air Force Recommendation Towards Resolution of Indoor Air Issue at the Officer Capehart Housing Area (OCHA) in Relation to Site SS-39

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to Washington State Department of Ecology Presenting Air Force Recommendation Towards Resolution of Indoor Air Issue at the Officer Capehart Housing Area (OCHA) in Relation to Site SS-39

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume US EPA Region X Letter to Base Responding to Air Force's Recommendation to Address the Completed Vapor Intrusion Pathway Within the Officer Capehart Housing Area (OCHA) and Site SS-39

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Informal Dispute Resolution Meeting Minutes, Draft Meeting Agenda, Proposed Schedule, and US EPA Region X Internal Memorandum Dated 23 September 2008 for Site SS-39

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to US EPA Region X Transmitting Re-Issued Focused Feasibility Study Report for Site SS-39, Fairchild AFB, Washington

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Final Plume Definition in Support of Remedial Design Report for Site SS-39, Fairchild AFB, Washington

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to Washington State Department of Ecology Transmitting Re-Issued Focused Feasibility Study Report for Site SS-39, Fairchild AFB, Washington

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Draft Remedial Investigation Report for Site SS-39, Fairchild AFB, Washington, Volume 2 Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Draft Remedial Investigation Report for Site SS-39, Fairchild AFB, Washington, Volume 1

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume CH2M Hill Letter to AFCEE/ICM Transmitting the Final 2004 Remedial Action-Operations Fourth Quarter and Annual Report for Site WW-1

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Letter to Washington State Department of Ecology Transmitting Re-Issued Focused Feasibility Study Report for Site SS-39, Fairchild AFB, Washington"

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Base Fact Sheet Concerning Clean up of Contaminated Groundwater at Spill Site 39, Fairchild AFB Site SS039 (OU-5) Chlorinated Hydrocarbon Plume AR-2050 SS39 IROD.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Private Off-Base Wells (29 Oct 12 RAB).pptx

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 9 of 10Folder Name File Name

Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Site SS039 Draft Distal Plume TM November 2013.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Site SS039 Draft ISCO TM November2013.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Site SS039 Draft Pre-Design Inv TM November 2013.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Site SS039 Draft Synoptic GW Mtr TM November 2013.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume Site SS039 Draft VIPER October2013.pdf Site SS039 (OU-5) Chlorinated Hydrocarbon Plume PS010 RA Report 1998 Site ST006 Bulk Storage Area Final Work Plan for Site ST-06

Site ST006 Bulk Storage Area Final Analysis of Data, Report of Remediation Activities, September 1999 - June 2000, Site ST-06 (PS-1) Site ST006 Bulk Storage Area Final Analysis of Data, Report of Remediation Activities, July 2000 - March 2001, Site ST-06 (PS-1)

Site ST006 Bulk Storage Area Final Work Plan, Sampling and Analysis Plan Addendum, Health and Safety Plan Addendum, Site ST-06 Site ST006 Bulk Storage Area Final Analysis of Data and Site Project Report, Buildings 2034/2035, Sites ST-06 and SS-18

Site ST006 Bulk Storage Area Final Work Plan, Sampling and Analysis Plan Addendum, Health and Safety Plan Addendum, Buildings 2034/2035

Site ST006 Bulk Storage Area Remedial Process Optimization Report, Fairchild AFB Bioventing Sites FT-1 and PS-1 Site ST006 Bulk Storage Area Final Analysis of Data and Site Project Report, Buildings 2034/2035, Sites ST-06 and SS-18 Site WP003 (WW-1) Industrial Wastewater Lagoon System Quarterly and Annual Reports for Optimization, Operations & Maintenance of Site WW-1 Site WP003 (WW-1) Industrial Wastewater Lagoon System WW-1, Optimization, Operations & Maintenance, 2001 Reports Site WP003 (WW-1) Industrial Wastewater Lagoon System Summary Report for Source Investigation Activities Conducted at the WW-1 Site Site WP003 (WW-1) Industrial Wastewater Lagoon System Final 2001 Monitored Natural Attenuation Report, Fairchild Air Force Base, Site WW-1

Site WP003 (WW-1) Industrial Wastewater Lagoon System Operations and Maintenance Manual, Groundwater Extraction and Treatment System, Wastewater Lagoons, Site WW-1

Site WP003 (WW-1) Industrial Wastewater Lagoon System WW-1 Remedial Action Operations 2004 Reports (First Quarter 2004 Report, Second Quarter 2004, Third Quarter 2004, Fourth Quarter and Annual Report)

Site WP003 (WW-1) Industrial Wastewater Lagoon System CH2M Hill Letter to AFCEE/ICM Transmitting First Quarter 2005 Remedial Action-Operations Report for Site

WW-1

Site WP003 (WW-1) Industrial Wastewater Lagoon System CH2M Hill Letter to AFCEE/ICM Transmitting Second Quarter 2005 Remedial Action-Operations Report for Site

WW-1

Site WP003 (WW-1) Industrial Wastewater Lagoon System Remedial Action - Operations Report for Site WW-1, First Quarter 2005 Event, Second Quarter 2005 Event, Third Quarter 2005 Event

Site WP003 (WW-1) Industrial Wastewater Lagoon System CH2M Hill Letter to AFCEE/ICM Transmitting the Final 2004 Remedial Action-Operations Fourth Quarter and Annual Report for Site WW-1

Site WP036 (AOC-6) Contaminated Sediment at Bldg. 1454 Fairchild_Draft_Risk_Eval_Final_052810_reduced.pdf Site WP036 (AOC-6) Contaminated Sediment at Bldg. 1454 FFS_WP36_May2011_.pdf

Site FT004 (FT-1) Former Fire Training Area Final Work Plan, Sampling and Analysis Plan Addendum, Health and Safety Plan Addendum, Site FT-01 Site FT004 (FT-1) Former Fire Training Area Final Operations and Maintenance Plan, Fire Training Area, Site FT-01 Site FT004 (FT-1) Former Fire Training Area Final Remedial Action Report for Fire Training Area, Site FT-04 Site FT004 (FT-1) Former Fire Training Area Site FT-1 West Bioventing System Modification Report Site FT004 (FT-1) Former Fire Training Area Post-Project Report, Excavation of Contaminated Soil at Site FT-1 Site FT004 (FT-1) Former Fire Training Area Remedial Process Optimization Report, Fairchild AFB Bioventing Sites FT-1 and PS-1 Site FT004 (FT-1) Former Fire Training Area Final Work Plan, Period of Operations, October 1999 - September 2000, Site FT-04 (FT-1) Site FT004 (FT-1) Former Fire Training Area Final Technical Specifications - Bioventing and Air Sparging Systems_FT004_1996 Site FT004 (FT-1) Former Fire Training Area Design Analysis Report – Bioventing and Air Sparging Systems_FT004_1996 Site SD031 (PS-10) Fuel Truck Maintenance Facility, Bldg 1060 2012 OWS_Removal_Report_(B-1060_and_B-2024) Site SD031 (PS-10) Fuel Truck Maintenance Facility, Bldg 1060 PS010 RA Report 1998 Site SD031 (PS-10) Fuel Truck Maintenance Facility, Bldg 1060 Demolition Report for Bldg 1060

FA8903-14-R-0004

Enclosure 2

9 January 2014 Page 10 of 10Folder Name File Name

Site SD038 (AOC-8) Contamination at Ditches, Pipes, Culverts Base Memorandum to HQ AMC/A7N Requesting Concurrence With the Remedy in Place (RIP) Determination for Site SD-38

Site ST010 (PS-7) P-4 Pumphouse 8 ST010 B1350 Demo Soil Testing Results 2013

Site ST035 (AOC-5) Contaminated Soil at Building 2165 Base Memorandum to HQ AMC/A7N Requesting Concurrence With the Remedy in Place (RIP) Determination for Site ST-35

Five Year Review Table 1-1 IRP site status.xlsx Five Year Review Table 4-1 COCs Status Summary.xlsx Five Year Review Third Five-Year Review_FairchildAFB_Rev2d-May 2013.docx Five Year Review Third Five-Year Review_FairchildAFB_Rev2d-May 2013.pdf Five Year Review A_Site-InspectionsSummary_Dec2012_rev2.docx Five Year Review Copy of FAFB-AppendixD_Rev2c_050613.xlsx Five Year Review FAFB AppendixD_Rev2b_050613.docx Five Year Review Fairchild Ltr_kim Prestbo 9.18.13.pdf RA-O Reports 2008\RA-O Rpt_4th Qtr Annual 2008_Final.pdf RA-O Reports 4th Qtr and Annual 2009 FAFB Report_Rev2.pdf RA-O Reports 2009\1Q09_Data_Report_07-02-09.pdf RA-O Reports 2009\2Q09 Data Report_compressed.pdf RA-O Reports 2009\0007-0001_FAFB_2Q09 Data Report_Jul09.pdf RA-O Reports 2009\0007-0001_FAFB_3Q09 Data Report_Nov09.pdf RA-O Reports 2009\0007-0001_Fairchild_4Q08 Residential Well ITIR_02Feb09.pdf RA-O Reports 2009\0007-0001_HSP-Rev0_FairchildAFB_05Jan09.pdf RA-O Reports 2009\4th Qtr and Annual 2009 FAFB Report.Rev2.pdf RA-O Reports 2009\June09_Health and Safety plan revision 1.pdf RA-O Reports 2010\FINAL_RA-O Rpt_3Q10 Data Report.pdf RA-O Reports 2010\Draft_FAFB_1Qtr10_RA-O Report_17May10.pdf RA-O Reports 2010\4th Qtr and Annual 2010 FAFB Report_rev2.pdf RA-O Reports 2010\2nd Quarter 2010 RA-O Report.pdf RA-O Reports 2011\0007-0001_FairchildAFB_2Q11_RA-O_Draft_24Aug11.pdf RA-O Reports 2011\3rd Qtr 2011_RA-O Rpt_Rev1_Mar2012.pdf RA-O Reports 2011\4th Qtr and Annual 2011 RA-O Rpt_Rev2 Final.pdf RA-O Reports 2011\Draft-Final_1st Qtr 2011_RAO Rpt_rev1.pdf RA-O Reports 2012\FAFB_2nd Qtr 2012_RA-O Rpt_Rev1.pdf RA-O Reports 2012\FAFB_3rd Qtr 2012_RA-O Rpt_Rev0_Nov12_Rcvd Jan13.pdf RA-O Reports 2012\FAFB_4th Qtr Annual 2012 RA-O Rpt_Rev1.docx RA-O Reports 2012\FAFB_1st Qtr 2012_RA-O Rpt_Rev1_Jun12.pdf RA-O Reports 2013\1Q2013 Report_rev0.pdf Residential Wells 0007-0001_Fairchild_4Q08 Residential Well ITIR_02Feb09.pdf SAP Update FairchildAFB_SamplingPlanUpdate_November2012.pdf

Attachment 1E3 – PWS Enclosure 3

9 January 2014

Enclosure 3

Acronyms and Definitions Performance-Based Remediation at Fairchild Air Force Base, WA

Acronyms AF Air Force AFB Air Force Base AFCEC Air Force Civil Engineer Center API American Petroleum Institute AR Administrative Record ASTM American Society for Testing and Materials BCE Base Civil Engineer CAC Common Access Card CADD Computer-aided Design and Drafting CD Compact Disk CDUT Contract Deliverables Upload Tool CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CLIN Contract Line Item Number CO Contracting Officer COC Contaminant of Concern COR Contracting Officer’s Representative CPSMR Contractor’s Progress, Status, and Management Report CQP Construction Quality Plan CRP Community Relations Plan CSM Conceptual Site Model CWM Chemical Warfare Materiel DoD Department of Defense DQO Data Quality Objectives EDITT Environmental Decision Information Tracking Tool ELAP Environmental Laboratory Accreditation Program EO Executive Order EOD Explosive Ordnance Disposal EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act ERPIMS Environmental Resources Program Information Management System ERPTOOLS/PC ERPIMS Quality Control Tool/Personal Computer ESD Explanation of Significant Difference FFA Federal Facility Agreement GFE Government Furnished Equipment GFI Government Furnished Information GFP Government Furnished Property GIO Geospatial Integration Office

GIS Geographic Information System GSR Green and Sustainable Remediation HSP Health and Safety Plan IBC International Building Code IMS Integrated Master Schedule IRP Installation Restoration Program LCC Life-cycle Cost or Lowest Life Cycle LTM Long Term Management MDL Master Document List MEC Munitions and Explosives of Concern MMRP Military Munitions Response Program MOU Memorandum of Understanding MPS Milestone Payment Schedule NACE National Association of Corrosion Engineers NCP National Oil and Hazardous Substances Contingency Plan NEC National Electrical Code NFA No Further Action NFPA National Fire Protection Agency NOV Notice of Violation NTP Notice to Proceed O&M Operations and Maintenance OES Optimized Exit Strategy OSHA Occupational Safety and Health Administration PAO Public Affairs Officer PA/SI Preliminary Assessment/Site Inspection PBC Performance-Based Contract PBR Performance-Based Remediation PCEAD Project Cost Estimating Assumptions Document .pdf Portable Document File PFOA Perfluoroctanoic Acid PFOS Perfluorooctane Sulfonate PMO Program Management Office PMP Project Management Plan PMR Project Management Review POC Point of Contact POP Period of Performance PWS Performance Work Statement PTT Performance Tracking Tool QAPP Quality Assurance Project Plan QA/QC Quality Assurance/Quality Control RA Remedial Action RAB Restoration Advisory Board

RA-O Remedial Action – Operation RC Response Complete RCRA Resource Conservation and Recovery Act RFP Request for Proposal RIP Remedy in Place ROD Record of Decision RPO Remedial Process Optimization SAP Sampling and Analysis Plan SAR Site Assessment Report SARA Superfund Amendments and Reauthorization Act SC Site Closeout SDSFIE Spatial Data Standard for Infrastructure and Environment SMP Site Management Plan SPO Service Performance Objective SSPC Steel Structures Painting Council TCE Trichloroethene UFC Uniform Fire Code UFP-QAPP Uniform Federal Policy - Quality Assurance Project Plan USAF United States Air Force USEPA United States Environmental Protection Agency UXO Unexploded Ordnance WP Work Plan

Definitions Draft Documents Internal documents that are submitted for Air Force review and approval. In all respects, draft documents shall be complete;

substantively correct and consistent with applicable laws, regulations, Department of Defense/Air Force policies; in proper format; and free of grammatical and typographical errors. In general, draft documents are the initial version of documents that will be reviewed by the Air Force. Draft copy documents shall not be submitted to regulatory agencies for review.

Draft Final Document Document incorporating Air Force comments and submitted for regulatory agency review may also be required prior to Final document preparation. Note that some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).

Emerging contaminant Chemicals and materials that have pathways to enter the environment and present real or perceived unacceptable human health or environmental risks and either do not have regulatory peer-reviewed human health standards or the regulatory standards are evolving due to new science, detection capabilities, or pathways. *Note that emerging contaminants may be site-specific given state-led regulatory standards and site-specific conditions.

Final Document The version of the document that has received Air Force, and where applicable, regulatory concurrence. At least one electronic copy of the final document consisting of original productivity software files and all quality control data, drawings, and GIS-type information, shall be provided to the Air Force. Electronic copies should be compatible with the current Air Force Microsoft™ Office Suite and GIS software versions. All figures shall be delivered in original application files GIS format as described in Section 4.7. In addition, an electronic version of the final document shall be submitted in a single portable document file (.pdf) format approved by the Air Force complete with electronic bookmarks.

Life-Cycle Cost An estimate of POP and post-POP costs based on proposed activities, activity duration, and assumptions from contract award through Contractor’s projected Site Closeout date (or 30 years for sites with indefinite closeout dates).

Long-term Management (LTM)

Environmental monitoring, review of site conditions, and/or maintenance of a remedial action to ensure continued protection as designed once a site achieves RC. LTM includes O&M, which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after Remedy in Place (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of performance of five-year review execution, and LUC maintenance.

The processes and monitoring in this phase of work are targets of optimization.

Optimized Exit Strategy

A logical approach and plan to achieve SC or advance sites as close to SC as practicable while maximizing effectiveness and efficiency and minimizing LCCs. An OES identifies a series of actions which reduce LCC and liability, and/or may decrease one or more selected performance indicators (i.e. concentration, remove mass, and frequency) of remedial activities relative to the proposed remediation strategy, some of which may occur beyond the POP.

Performance Goal A standard being used by AFCEC to define when an effort has achieved satisfactory performance for a site for which the minimum performance objective is OES, e.g., Reduction of TCE concentrations in the groundwater plume of 20% by 30Sep15.

Performance Indicator A measurable or calculable feature of an approach, system, or process that provides direct interpretive value with respect to remedial mechanisms or to achievement of a remedial…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .