A1_-_ORS-5_LV_PWS_11_Mar.pdf
PDF 100 KB Posted
- Attached to
- ORS-5 (Operationally Responsive Space) SensorSat 5 Launch Services Federal contract opportunity
- Solicitation number
- FA8818-15-R-0003
About this file
A1 - PWS - Updated PWS with DRAFT water mark removed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A2_-_ORS-5_TRD_V1.pdf | ||
| ORS-5_QA_2.pdf | ||
| A6_DD254_V1.pdf | ||
| ORS_Q A_1.pdf | ||
| A3_-_ORS-5_Payment_Plan_v10.pdf | ||
| A1_-_ORS-5_LV_PWS_11_Mar.pdf | ||
| A5_-_Small_Business_Sub-Contracting_Plan_4_Mar.pdf | ||
| A2_-_ORS-5_TRD_17_Mar.pdf | ||
| A8_-_Sec_M_Eval_Criteria_11_Mar.pdf | ||
| A7_-_Sec_L__ITO_11_Mar.pdf | ||
| FA8818-15-R-0003_RFP.pdf | ||
| A4_-_Price_Adjustment_for_GFP_and_Services_3_Mar.pdf | ||
| Exhibit_A_-_CDRLs_1423_13_Mar.pdf | ||
| A6_-_DD254_draft.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
To
FA8818-15-R-0003
Operationally Responsive Space - 5 (ORS-5)
PERFORMANCE WORK STATEMENT (PWS)
11 March 2015
Contents 4 1.0 Scope and Objectives 5 1.1 Scope 6 1.2 Objectives 7 2.0 Planning 8 2.1 Program Management 9 2.2 Compliance Documents
10 3.0 Launch Service Analysis, Design 11 3.1 Launch Service Design 12 3.2 Launch Service Design Reviews 13 3.2.1 Service Requirements Review 14 3.2.2 Preliminary Design Review 15 3.2.3 Critical Design Review 16 3.2.4 Design Certification Review 17 3.3 Launch Service Analyses 18 4.0 Development and Production 19 4.1 First Flight Items 20 4.2 Production Responsibilities 21 5.0 Integration 22 5.1 Interface Control Document 23 5.2 Space Vehicle Integration to the Launch Service 24 5.3 Requirements Verification 25 5.4 Fit Check 26 6.0 Launch Operations 27 6.1 Checkout and Launch 28 6.2 Launch Support 29 7.0 Space Vehicle Processing Support 30 7.1 Readiness Reviews 31 7.1.1 Launch Service Readiness Review 32 7.1.2 Flight Readiness Review 33 7.1.3 Launch Readiness Review 34 7.2 Space Vehicle Processing Facility 35 8.0 Safety, Quality, and Security 36 8.1 Safety and Quality
37 8.2 Security 38 9.0 Launch Delays 39 9.1 Grace Period 40 9.2 Delays beyond the Grace Period
41 1.0 Scope and Objectives
42 1.1 Scope 43 The Operationally Responsive Space program office is seeking a launch service for 44 ORS-5 SensorSat mission. This contract will consist of a single launch service with a 45 designated launch date in CY 2017
46 This Performance Work Statement (PWS) defines the Operationally Responsive Space 47 (ORS) program office Contractor requirements to provide launch services for ORS-5 48 SensorSat mission.
49 The Contractor shall perform launch services planning, analysis, design, development, 50 production, integration, and testing required to launch the ORS-5 SensorSat space 51 vehicle to the desired orbit and to satisfy all performance/interface requirements 52 specified in the ORS-5 TRD.
53 1.2 Objectives 54 The objectives of ORS-5 SensorSat launch services are to:
55 a. Provide an affordable, accurate, and on-time delivery of the Operationally 56 Responsive Space ORS-5 SensorSat SV to the specified altitude and inclination.
57 b. Ensure the safety of the public, as well as all personnel, hardware, and property 58 associated with the launch service.
59 c. Incorporate best commercial practices.
60 2.0 Planning 61 a. The Contractor shall be responsible for initiating and ultimately obtaining the 62 Federal Aviation Administration (FAA) licensing necessary to successfully deliver 63 the procured launch service.
64 b. The Contractor shall be responsible for all integration and necessary Range 65 services in order to successfully deliver the launch service. ORS-5 is prohibited 66 from launching from a non-US range.
67 c. The Contractor shall furnish all services required to meet the ORS-5 SensorSat 68 launch requirements including, but not limited to: program management, mission 69 integration, launch site support, ground and flight system safety, and 70 performance assurance.
71 d. The Contractor shall make all arrangements with the responsible authorities for 72 the required launch Range authorization and support for launch vehicle 73 processing; integrated space vehicle/launch vehicle processing; launch; and 74 launch site maintenance and modifications, if required. The contractor shall 75 assist the government in arrangements concerning any and all Government 76 Furnished Equipment; boosters, handling equipment electrical and/or mechanical 77 ground support equipment.
78 e. The Contractor shall include all Contract Data Requirements List (CDRL) items 79 as shown in Table 1 as part of the launch service.
CDRL # CDRL Title A001 Technical Report – Meeting/Review Documentation A002 Technical Report – Countdown Documentation A003 SV to LS Interface Control Document (ICD) A004 Technical Report – ICD Requirements Verification Report (RVR) A005 Technical Report – Final Flight Report A006 SV – LV Integration Procedures A007 Integrated Master Schedule A008 Technical Report – Risk Management Plan, System Safety Plan, Range Documents 80 Table 1 – CDRL List
f. The Contractor shall provide logistical supplies, services, and hardware support to the post-production, transportation, and launch base operations of the launch service system. Such support should include, but is not limited to: provision of spares; provision of propellants, liquids, and gases for launch and test; packaging and transportation of the launch service system; and warehousing and storage.
2.1 Program Management
The Contractor shall perform the program management tasks required to provide the launch service and satisfy the mission requirements. These tasks shall include as a minimum:
a. Conduct a Launch Service Kickoff Meeting at a facility determined by the contractor and shall consist of a presentation of the proposed launch service, including, but not limited to, the launch service overview, the proposed schedule, launch service/SV dependencies and risks to implementing the requirements of the PWS and TRD.
b. Conduct launch vehicle program reviews that provide evidence of launch vehicle maturity and acceptability to meet the contracted launch window and to provide the Government with appropriate evidence needed to satisfy milestone payments to the Contractor (CDRL A001). The description of the required reviews is contained in Section 3.2.
c. Develop and maintain a master schedule and sub-tier schedules, which shall be included as part of all program reviews (CDRL A007).
d. Obtain all applicable licenses, permits, and approvals required by federal, state, and local regulatory agencies; and prepare (or support the Government in preparing if necessary for the SV) and submit any environmental impact statements that may be necessary for the provisioning of the launch service.
(Approvals required by the SV will be the responsibility of the Government.) The Contractor shall provide reasonable cooperation and support to the government in the process of obtaining, maintaining, and renewing permits and licenses as set forth above.
e. Provide resolution of critical problem areas to minimize or eliminate schedule impacts.
f. Manage all subcontracts and monitor subcontractor activities to a sufficient level of detail to ensure timely delivery of acceptable components. A report on the performance of subcontractors shall be included as part of any program reviews.
g. Provide the Final Post Flight Report (CDRL A005) to enable determination of mission success as defined in the Interface Control Document (ICD) (CDRL A003).
h. Make provision for insurance to cover liability for possible damage to Government property and third parties in accordance with the FAA license.
i. Pay any taxes and transfer costs required for delivery of the launch service.
2.2 Compliance Documents
The Contractor shall comply with the following documents. Once the ICD is signed, it shall take precedence over the TRD.
a. Applicable Range Safety Documentation for the selected launch site as determined by that Range. The Contractor shall make available to the Government any required safety documentation that the Contractor provides to the Range.
b. ORS-5 Technical Requirements Document (TRD)
c. ORS-5 SV/LV Interface Control Document (ICD)
3.0 Launch Service Analysis, Design
3.1 Launch Service Design
The Contractor shall design and/or procure the launch service to include: a) the launch vehicle, including but not limited to the following subsystems: structures, mechanisms, fluids/propulsion, electrical/electronics, guidance/navigation/control, flight termination, and software; b) any space vehicle/payload adapters, if required; and c) the launch range.
3.2 Launch Service Design Reviews
Four design reviews shall be conducted for the ORS-5 Launch Service, a Service Requirements Review, a Preliminary Design Review, a Critical Design Review and a Design Certification Review. The contractor will host these reviews at a facility determined by the contractor and the reviews may be conducted using contractor format. Documentation of these reviews is required under CDRL A001. In the following descriptions, mission specific is defined as services provided that are newly performed or developed specifically to meet the requirements of the ORS-5 mission. All new, modified and unqualified launch service subsystems which have not been demonstrated in the launch configuration proposed for ORS-5 are considered mission specific.
3.2.1 Service Requirements Review
The Contractor shall conduct an SRR to ensure that key service requirements have been properly identified, ensure that the requirements are defined and verifiable, and show the service design will meet, or have a plan to meet, the requirements. The review shall include, but not be limited to the following:
a. Service requirements identification and definition to a level adequate to verify launch service performance capabilities.
b. Design restrictions, limitations, and known violations.
c. Functional interfaces between the launch system, the range, and the space vehicle and interfaces between new and existing launch vehicle systems.
d. Space Vehicle Environmental requirements (e.g., thermal, contamination, vibration, pressure, Electromagnetic Compatibility (EMC), shock, launch complex RF, and lightning).
e. Orbital requirements, launch vehicle performance, launch window injection accuracy, and deployment attitudes and rates.
3.2.2 Preliminary Design Review
The Contractor shall conduct a preliminary design review to present preliminary design, operation, and interface aspects of the launch service and to demonstrate that the preliminary design meets all performance allocations; evaluate the safety of the design and its ability to meet safety requirements; and document all design trades considered.
The Contractor shall discuss analyses performed and their results along with comparisons to any similar proven designs. Specific goals include the following:
a. Presentation of preliminary design of the launch service, including a preliminary design of mission specific services.
b. Present the preliminary qualification plan for the launch service
c. Demonstrate that the launch service satisfies the functional and performance baseline defined by the TRD.
d. Demonstrate that the external interfaces of the launch service (with the range and the SV) represent a complete set
e. Presentation of preliminary models and analyses
f. Demonstrate that preliminary plans are established to support SV-Launch
Service integration and test
g. Presentation of Risk Assessment
h. Delivery of all CDRLs due at PDR
3.2.3 Critical Design Review
The CDR will demonstrate the launch service design has been completed such that all requirements have been satisfied. The Contractor shall present a final detailed design using drawings, analyses, and evaluation testing that shows the design meets final performance and interface specifications, safety requirements, and mission objectives.
The Contractor shall identify planned qualification and acceptance tests to be performed to prove validity.
a. Presentation of the final launch service design, including the final design of mission specific services
b. Demonstrate the technical adequacy of the launch service to meet the requirements of the LV-SV Interface Control Document (CDRL A003)
c. Present the Requirements Verification Matrix including how all the requirements will be verified. (CDRL A004)
d. Demonstrate all government approvals necessary to execute the launch service are on schedule to be completed to support the launch date.
e. Demonstrate that all external agreements required to execute the launch service are complete
f. Present the final integration and test plans to accommodate SV integration
g. Present an in-depth schedule review showing the launch date can be achieved
h. Address program-specific issues and risks and closure plans to meet the launch date.
3.2.4 Design Certification Review
The Contractor is required to demonstrate through the DCR that components and subsystems are “qualified” because they have been tested, analyzed, demonstrated, or shown by similarity to meet all functional requirements and demonstrate margin over all expected, storage, shipping, handling, flight, and acceptance environments. Artifacts that the as-built systems and subsystems are qualified are required to be supplied.
Qualification is required to be accomplished against the Contractor’s standard(s). It is recognized that launch service Contractor chooses to maintain their own technical standards for design and test; therefore the chosen standard(s) will be provided to the ORS office 1 month prior to the DCR to aid in our understanding of the qualification status. ORS reserves the right to withhold approval of this milestone if the mission specific design is not qualified to the Contractor’s standard(s).
3.3 Launch Service Analyses
a. The Contractor shall provide an initial estimate at the Kickoff Meeting of the expected launch vehicle environments that the SV will be exposed to during launch and ascent with updates of these predicted environments given at each major design milestone.
b. The contractor is required to provide a minimum of two Coupled Loads Analyses (CLA). The first CLA will be required by ATP + 60 days, with a SV Craig- Bampton model provided at ATP. The final CLA will be generated using the SV test verified model, supplied by the SV contractor.
c. Analysis required to validate the launch service design as documented in the LV- SV ICD (CDRL A003) shall be documented to the launch vehicle contractor’s standards and delivered to ORS at the Design Certification Review (CDRL A001).
4.0 Development and Production
4.1 First Flight Items
The Contractor shall implement a test program, per contractor standards, for qualification of any first flight sub-systems required for the launch service and shall include existing systems that are modified, unqualified launch vehicle components, structures, and ground support equipment.
4.2 Production Responsibilities
The Contractor shall manufacture, assemble, test and transport the launch vehicle and all mission hardware required to provide the launch service and shall provide all materials and equipment necessary for these tasks. Government Furnished Equipment (GFE); as defined by the contractor, delivered by the government and accepted by the contractor; shall be the contractor’s responsibility for all applicable steps outline above.
5.0 Integration
5.1 Interface Control Document
The Contractor shall coordinate with the Government to develop the ICD (CDRL A003).
5.2 Space Vehicle Integration to the Launch Service
The Contractor shall provide the necessary services and hardware to integrate the ORS-5 SensorSat SV to their launch system as defined in the ICD. ORS-5 will supply all SV GSE required to bring the SV to within 4 inches of the launch service mating plane.
5.3 Requirements Verification
The ICD Requirements Verification Matrix (CDRL A004) shall contain the data artifacts necessary to demonstrate that the launch service meets the requirements of the SV-LS
ICD (CDRL A003).
5.4 Fit Check
The Contractor shall plan and execute a fit check of the SV mating hardware to the launch service interface at a facility designated by the contractor. This fit check will verify the electrical and mechanical interfaces as documented in the LV ICD (CDRL A003), including successful mechanical mating of the SV separation system and successful separation of the SV-provided separation system with LV-supplied command signals.
6.0 Launch Operations
The Contractor shall identify and secure a launch site to meet the requirements of the launch service. Contractor documentation submitted to the range shall be provided to the ORS office (CDRL A008).
6.1 Checkout and Launch
The Contractor shall perform the following:
a. Assemble, transport, maintain, checkout, and launch the LV and place the SV into the desired orbit.
b. Provide and make arrangements for all facilities, supplies, and services required for preparation and launch of the LV.
c. Identify ground and flight safety launch constraints.
d. Mate the SV, encapsulate, transport, and perform SV to launch vehicle integrated checkout activities necessary to assure launch readiness. (A006)
e. Provide and schedule the necessary support services at the launch Range that are required for launch preparation of the launch vehicle, integrated testing with the SV, and launch. Integrate the SV procedures with the launch vehicle checkout effort.
f. The contractor shall act as the ORS-5 representative to the range and submit all required SV-provided safety and range documents to the selected range.
6.2 Launch Support
a. The Contractor shall provide access for three Government personnel at the launch site for day of launch participation and 4 SV contractor personnel.
b. Support should be consistent with the Contractor’s day of launch available information, which may include access to real-time telemetry (RF and hardwire), voice communication channels with listen capabilities, video and telephones.
c. The ORS Office shall provide the space segment and the ground segment go-for-launch. The Contractor shall supply all day of launch documentation (CDRL A002)
7.0 Space Vehicle Processing Support
7.1 Readiness Reviews
Three readiness reviews shall be conducted for the ORS-5 Launch Service, a Launch Service Readiness Review, a Flight Readiness Review and a Launch Readiness Review. The contractor will host these reviews at a facility determined by the contractor and the reviews may be conducted using a contractor format.
7.1.1 Launch Service Readiness Review
The Contractor shall conduct a Launch Service Readiness Review to demonstrate that the launch site and launch vehicle are ready to proceed with launch vehicle processing activities at the launch site. The Contractor shall present as a minimum:
a. Mission description including SV and launch vehicle configuration;
integration status; summary of waivers; mission specific analyses results and status including updates if any from the CDR; flight launch vehicle and launch site hardware/software production and testing status.
b. A detailed schedule showing all activities (ground and flight) remaining to achieve a successful, on-time launch
7.1.2 Flight Readiness Review
The Contractor shall conduct a FRR for the mission to ensure the launch vehicle is acceptable for flight and all Range and other mission requirements have been met, or will be satisfied prior to launch. The FRR shall include participation from any appropriate Range approving officials. The FRR is held approximately five
(5) to ten (10) days before launch. As a minimum, the Contractor shall provide verification that:
a. All critical items required to proceed into final launch countdown are ready
b. Vehicle configuration is defined and all vehicle systems have been verified
IAW launch site test plans
c. All previously recorded action items have been closed or are reflected on the schedule
d. All previously held Contractor’s readiness review actions have been closed or resolved
e. Launch site/Range support organizations have committed to launch
f. Tracking and data support resources are committed to launch
g. Any open work is identified and closeout plans and schedules are in place and supportable
h. Any constraints to launch are identified and resolution plans developed
i. Mission risks are known and documented
j. Launch commit criteria for space vehicle and launch vehicle is approved and released
k. Anomalies from previous missions if applicable
l. Hardware/software failures in the field
m. Open corrective actions/problems reports
7.1.3 Launch Readiness Review
The Contractor shall conduct a LRR for the mission to ensure the specific launch vehicle is acceptable for flight and all Range and other mission requirements have been met, or will be satisfied prior to launch. The LRR shall include participation from any appropriate Range approving officials. The LRR is held approximately two (2) days before launch. As a minimum, the Contractor shall provide verification that any open items and deviations from the FRR have been satisfied.
7.2 Space Vehicle Processing Facility
As specified in the TRD, the contractor shall provide a SV processing facility and non-flight hardware storage facility to support all pre- and post- SV to LS mating processes.
8.0 Safety, Quality, and Security
8.1 Safety and Quality
The Contractor shall establish, implement, and maintain risk management, safety, reliability, and quality assurance programs in accordance with AS9100, Aerospace Quality Management System or equivalent. The contractor shall provide the ORS Office copies of the contractor’s risk management and system safety process(es) within 30 days of ATP (CDRL A008).
8.2 Security
The contractor shall comply with the DD254..
9.0 Launch Delays
9.1 Grace Period
The Launch Service Contractor shall provide the ORS Office with 120 days of grace period from the launch date placed on contract for launch delays. The ORS Office shall provide 120 days of grace from the launch date placed on contract for LVC delays.
9.2 Delays beyond the Grace Period
If the launch date moves beyond the 120 day grace period, the issue shall be handled by DFARS 252.243-7002, Request for Equitable Adjustment.
| Contents |
| 42 1.1 Scope |
| 53 1.2 Objectives |
| 60 2.0 Planning |
| 2.1 Program Management |
| 2.2 Compliance Documents |
| 3.0 Launch Service Analysis, Design |
| 3.1 Launch Service Design |
| 3.2 Launch Service Design Reviews |
| 3.2.1 Service Requirements Review |
| 3.2.2 Preliminary Design Review |
| 3.2.3 Critical Design Review |
| 3.2.4 Design Certification Review |
| 3.3 Launch Service Analyses |
| 4.0 Development and Production |
| 4.1 First Flight Items |
| 4.2 Production Responsibilities |
| 5.0 Integration |
| 5.1 Interface Control Document |
| 5.2 Space Vehicle Integration to the Launch Service |
| 5.3 Requirements Verification |
| 5.4 Fit Check |
| 6.0 Launch Operations |
| 6.1 Checkout and Launch |
| 6.2 Launch Support |
| 7.0 Space Vehicle Processing Support |
| 7.1 Readiness Reviews |
| 7.1.1 Launch Service Readiness Review |
| 7.1.2 Flight Readiness Review |
| 7.1.3 Launch Readiness Review |
| 7.2 Space Vehicle Processing Facility |
| 8.0 Safety, Quality, and Security |
| 8.1 Safety and Quality |
| 8.2 Security |
| 9.0 Launch Delays |
| 9.1 Grace Period |
| 9.2 Delays beyond the Grace Period |