18q106_amendment_2_RFIs.docx

DOCX document 13 KB Posted

Attached to
Dust Collection System
Solicitation number
FA875118Q0106
Issued by

About this file

Additional Information

View the file

Other files

File Type Posted
18-0020_SOR_Rev1.docx DOCX document
Air_Force_Research_Lab_Rev2-jah.pdf PDF
18q106_ATTACH_2_DWGS.pdf PDF
18q106_ATTACH_1_SOR.docx DOCX document
18q106_ATTACH_4_Reps_and_Certs.docx DOCX document
18q106_ATTACH_3_site_visit.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA875118Q0106 Dust Collection System

ADDITIONAL INFORMATION

09 JAN 2019

· The Statement of Requirements is replaced in its entirety by the Statement of Requirements Revised 3 JAN 2019

· Attachment 2, Drawings are replaced in their entirety by Attachment 2 Revised 3 JAN 2019

Q: Will an enclosure be required around the cyclone to comply with NFPA?

A: The Government will be responsible for installing a room around the cyclone unit to comply.

Q: Are floor sweeps desired?

A: Yes. Amended drawings show added floor sweeps.

Q: Are machines accurately labeled on drawings?

A: Amended drawings show accurate machine locations.

- END ADDITIONAL INFORMATION -

File details come from the government source that posted it.