15r24_sol_additional_info_no_1.docx
DOCX document 17 KB Posted
- Attached to
- Surveillance System Modernization Federal contract opportunity
- Solicitation number
- FA8751-15-R-0024
About this file
Additional Solicitation Information 1 dated 8 July 2015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15r24_sol_additional_info_no_3.docx | DOCX document | |
| 15r24_Atch_8 _2nd_site_visit.docx | DOCX document | |
| 15r24_a15_Attachment_2_Drawings_AMENDMENT_NUMBER_3_DATED_31_JULY_2015.pdf | ||
| 15r24_a15_Attachment_1_SOW_AMENDMENT_NUMBER_3_DATED_31_JULY_2015.pdf | ||
| 15r24_sol_additional_info_no_2.docx | DOCX document | |
| 15r24_a15_Attachment_2_Drawings_AMENDED.pdf | ||
| 15r24_a15_Attachment_7_DD_254.pdf | ||
| 15r24_a15_Attachment_1_SOW_AMENDED.pdf | ||
| 15r24_a15_Attachment_3_list_of_mats_AMEND_NR_1.pdf | ||
| 15r24_a15_Attachment_6_wage_det.docx | DOCX document | |
| 15r24_a15_Attachment_1_SOW.pdf | ||
| 15r24_a15_Attachment_3_list_of_mats.pdf | ||
| 15r24_a15_Attachment_5_reps_certs.docx | DOCX document | |
| 15r24_a15_Attachment_4_site_visit.docx | DOCX document | |
| 15r24_a15_Attachment_2_Drawings.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8751-15-R-0024
SOLICITATION ADDITIONAL INFORMATION AMENDMENT #1
The following firms attended the site visit held 30 JUN 2015:
Convergint Technologies 23 West Market St Corning, NY 14830
FES Installations PO Box 127 6596 US Rt 20 Madison, NY 13402
InterPacific, Inc 1278 Barclay Blvd Buffalo Grove, IL 60089
Life Safety Security 60 Sonwil Dr Buffalo, NY 14225
Stanley Security Solutions 40 Gardenville Parkway West West Seneca, NY 14224
QUESTIONS AND ANSWERS
Q1: The requirements from the SOW mention a full replacement of the current system with an Axis IP system (1.04.A). The spreadsheets for pricing show two options: an analog upgrade with encoders for the analog cameras (pages 2-10) and a complete replacement of the old cameras with IP cameras (pages 11-19). Do you want pricing on both options? If so, how do we separate it in CLIN0001?
A1: The original spread sheets are within ATTACHMENT 3, List of Materials, is revised and replaced in their entirety by those listed in ATTACHMENT 3, AMENDMENT NUMBER 1 dated 7 JUL 2015.
Q2: Is license plate recognition required?
A2: Not Required.
Q3: Is bonding required?
A3: Not Required
ADDITIONAL INFORMATION
- The List of Materials found in ATTACHMENT 3, AMENDMENT NUMBER 1 dated 7 represents a solution known by the Government to be technically acceptable and capable. However, solutions offered as equal will be evaluated but must be found technically capable.
- Warranty and maintenance applies to that part of the work installed and performed by the contract awardee and to that intersection or junction where new ties into existing. Warranty and maintenance does not apply to existing infrastructure beyond tie-ins.
- Recording is 24/7, 365 days per year, with 6 months of storage. No archiving system is required.