FA8609-22-R-B003
Attachment 1 4 May 2022
DEPARTMENT OF THE AIR FORCE
MOBILITY AND TRAINING AIRCRAFT
DIRECTORATE KC-46 DIVISION WRIGHT-
PATTERSON AIR FORCE BASE, OHIO 45433
STATEMENT OF
WORK FOR THE
KC-46A COMMODITIES DEPOT ACTIVATION
SUPPORT (CDAS)
CONTRACT NUMBER: FA8609-22-R-B003
CONTENT OWNER:
KC-46 Sustainment IPT
SectionJ, Attachment
4 May 2022
Table of Contents
1.0 Scope 3
2.0 Applicable Documents 4
3.0 Tasks 7
3.1 Engineering and Technical Support 8
3.2 Support Equipment and Tooling 8
3.2.1 SE Manuals 8
3.2.2 SE Supply Support 8
3.3 Training 8
3.3.1 Classroom/OJT 8
3.3.2 Courseware 8
3.3.3 Mature Repair Process Training 8
3.4 Parts/Supply 8
3.4.1 Parts Management Plan 9
3.5 Reparable Spares 9
3.6 Airworthiness 9
3.7 Warranty, Return, and Discrepant Orders 9
3.8 Sustainment and Maintenance Support 10
3.9 Information Security 10
3.9.1 CUI Controls 10
3.9.2 Covered Defense Information 11
3.10 Reviews 11
3.10.1 Post Award Conference 11
3.10.1.1 Deliverables 11
3.10.1.2 Exit Criteria 11
3.10.2 Quarterly Reviews 11
3.10.2.1 Deliverables 12
3.10.2.2 Exit Criteria 12
3.10.3 Monthly Status Updates 12
3.10.4 Weekly Teleconferences 12
3.10.4.1 Action Items/Minutes 12
Appendix A – FY22 Organic Gap Analysis Components 13
Appendix B – Definition of Government Specific Terms 18
4 May 2022
1.0 SCOPE
KC-46A aircraft provides worldwide, day and night, and adverse weather aerial refueling to receiver-capable US, allied, and coalition military aircraft, including unoccupied aircraft. The
KC-46 aircraft is based on commercial, Federal Aviation Administration (FAA) or equivalent, certified 767-2C aircraft, which is finished to meet the unique KC- 46A aircraft requirements.
To uphold this certification for an accepted KC-46, the sustainment requirements will ensure compliance with Amended, Supplemental, and Military Type Certifications (ATC/STC/MTC).
Per the KC-46 Life Cycle Sustainment Plan (LSCP), The United States Government (USG) will utilize an organic two-level maintenance (2LM) posture for sustainment of the KC-46A aircraft:
Organizational Level (O-Level) and Depot Level (D-Level). The 2LM will best ensure compliance with certification requirements. Organic Repair Capability will enable the Air Force to establish maintenance capabilities for operational readiness to ensure effective and timely response to peacetime operations, mobilizations, national defense contingencies, and other emergencies.
In order to mechanize this organic 2LM sustainment posture, the KC-46 aircraft program will require initial and replenishment Line Replaceable Units (LRU)/commodities, Support
Equipment (SE), Training and other Objectives as outlined in Section 2. As the KC-46 aircraft
Program Office stands up organic depot repair capability for each aircraft LRU, a Fair
Opportunity Proposal Request (FOPR) will be released to awardees of the Multiple Award
Indefinite Delivery/Indefinite Quantity (IDIQ) contract for bidding. Each FOPR will provide for the organically identified requirements for commodity activation to outfit the depot to successfully activate D-Level maintenance.
Each FOPR will contain the Organic Gap Analysis Report for the specific LRUs requiring depot activation support. Awardees of the base MAC IDIQ will be able to compete for individual follow-on FOPRs.
Appendix A identifies the first batch of components that are undergoing Organic Gap Analysis.
In total the KC-46 plans to complete organic gap analysis on approximately 498 LRUs over the next 10 years. As these gap analyses are completed the KC-46 Program Office will release the respective FOPRs for competition under the commodities base MAC IDIQ contract.
For the purposes of this Statement of Work, the acronym “LRU” is equivalent to the term
“Commodity,” and used interchangeably. Additional USG specific terms are defined in
Appendix B.
4 May 2022
2.0 APPLICABLE DOCUMENTS
The following list of applicable documents, in their most current version or revision, are relevant in whole or in part to the scope and purpose of this SOW. Subsidiary documents, referenced within the documents listed below, are not applicable to this SOW unless specifically invoked. In the event of a conflict between the requirements in this SOW and any of the listed applicable documents, the SOW shall take precedence.
UNITED STATES GOVERNMENT (USG) DOCUMENTS
Document Number Document Name Version and Date
UNITED STATES CODE/EXECUTIVE ORDERS
Title 10, USC § 2460 Definition of Depot-Level Maintenance and
Repair 2 Jan 13
Title 49, USC § 44704(b)
Type Certificates, Production Certificates, Airworthiness Certificates, and Design and
Production Organization Certificates
3 Jan 16
Title 50, USC, Appendix 2401 et seq
War and National Defense 3 Jan 12
Executive Order 13536 Classification of National Security
Information 29 December
DEPARTMENT OF DEFENSE (DoD) DIRECTIVES
DoDD 5205.02E DoD Operations Security (OPSEC)
Program 20 Jun 12
DoDD 5200.2-R DoD Personnel Security Program 1 May 14
DoDD 5200.39
Critical Program Information (CPI) Identification and Protection within Research, Development, Test and Evaluation (RDT&E)
28 May 15
Incorporating Change 2, Effective 15 Oct 18
DoD MANUALS
DoDM 5200.1-M DoD Information System Security Manual Mar 94
DoDM 5200.02 Procedures for the DoD Personnel Security
Program (PSP) 3 Apr 17
DoDM 5220.22-M National Industrial Security Program Operating Manual
28 Feb 06 Incorporating Change 2, May 18, 2016
DoDM 5400.7 Freedom of Information Act Program
25 Jan 17 and 32 Code of
Federal Regulations (CFR)
Part 286, 1 Jan 11
4 May 2022
DoD INSTRUCTIONS
DoDI 5000.01 Defense Acquisition System 12 May 03
DoDI 5000.02 Operation of the Defense Acquisition System 9 Sep 20
DoDI 5200.01 DoD Information Security Program and
Protection of Sensitive Compartmented
Information (SCI)
21 Apr 16
DoDI 5200.44 Protection of Mission Critical Functions to
Achieve Trusted Systems and Networks
5 Nov 12, Incorporating Change 2, 27 Jul 17
DoDI 5200.39 Critical Program Information:
Identification and Protection
28 May 15 Incorporating Change 2, Effective October 15, 2018
DoDI 5200.48 Controlled Unclassified Information 6 March 2020
DoDI 5205.13
Defense Industrial Base (DIB) Cyber
Security and Information Assurance
(CS/IA)
Program Security Classification Manual
(SCM)
26 Apr 12
DoDI 5240.19 Counterintelligence Support to the Defense
Critical Infrastructure Program
31 Jan 14 Incorporating Change 1, August 17, 2017
DoDI 8582.01 Security of Unclassified DoD Information
Systems on Non-DoD Information Systems 6 Jun 12
DoDI 8500.01 Cybersecurity 14 Mar 14, Change 1, Effective 7 Oct 19
DoDI 8510.01 Risk Management Framework (RMF) for
DoD Information Technology (IT)
12 Mar 14, Incorporating Change 2, 28 Jul 17
USAF DOCUMENTS
Air Force Guidance Memorandum 2020-16-01 Controlled Unclassified Information 23 July 2020
AFI 16-1404
Air Force Information Security Program
Protecting Controlled Unclassified
Information in Nonfederal Information Systems and Organizations.
29 May 15
AFI 21-101
Chapter 15, Maintaining Commercial
Derivative Aircraft 21 May 15
AFI 36-2201 Air Force Training 15 Sep 10
AFI 36-2670 Total Force Development 25 Jun 2020
AFI 63-1201 Life Cycle Systems Engineering 23 Jul 07 Incorporating Change 12 Sep 11
AFMAN 17-1301 Computer Security (COMPUSEC) 10 Feb 17
AFMAN 33-302 DoD Freedom of Information Act Program 21 Oct 10 Incorporating Change 3, 16 May 16
AFMAN 91-203
Air Force Occupational Safety, Fire and
Health Standards 11 Dec 18
AFPD 63-17
Technology and Acquisition Systems Security
Program Protection 26 Nov 01
4 May 2022
MILITARY HANDBOOKS AND STANDARDS
MIL-HDBK-61B Configuration Management Guidance 7 Apr 20
MIL-HDBK-1812
Type Designation, Assignment and Method for Obtaining 14 February 1997
MIL-STD-129R
Department of Defense Standard Practice:
Military Marking for Shipment and Storage
18 Feb 14
MIL-STD-196G
Joint Electronics Type Designation
Automated System 30 May 2018
MIL-STD-881D
Department of Defense Standard Practice Work Breakdown Structures for Defense Materiel Items
9 Apr 18
MIL-STD-882E
Department of Defense Standard Practice
For System Safety 11 May 12
MIL-STD-1472G
Department of Defense Design Criteria Standard Human Engineering
11 Jan 12
MIL-STD-2037-1
Revision (Rev) E Department of Defense Standard Practice for Military Packaging
23 May 08 CHG-1 Jan 11 CHG-2 Jun 18 CHG-3 Nov 18
MIL-STD-31000B Technical Data Package (TDP) 31 Oct 18 05 Nov 09
FEDERAL AVIATION ADMINISTRATION DOCUMENTS
FAA Order 8110.101A Type Certification Procedures for Military
Commercial Derivative Aircraft 25 Feb 15
FAA Order 8110.4C Type Certification Changes 1 thru 6 incorporated, 28 Mar 07
FAA Order 8110.54A Instructions for Continued Airworthiness Responsibilities, Requirements, and Contents
23 Oct 10
FAA Form 8100-1 Conformity Inspection Record 1 Aug 2010
FEDERAL ACQUISITION REGULATION AND DEFENSE FAR SUPPLEMENT
REFERENCES
FAR 16.502 Definite-Quantity Contracts 15 Jan 20
FAR Part 45 Federal Acquisition Regulation (FAR) 2 Mar 12
FAR 52.204-21
Basic Safeguarding of Covered Contractor
Information Systems Apr 84
FAR Part 52.212-4 Contract Terms and Conditions – Commercial Items
1 Oct 18
DFARS 252.204-7000 Disclosure of Information 31 Oct 19
DFARS 252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
Dec 2019
DFARS 252.204-7008
Compliance with Safeguarding Covered
Defense Information Controls 1 Oct 16
DFARS 252.204-7009
Limitations on the use or Disclosure of
Third-Party Contractor Reported Cyber
Incident Information
1 Oct 16
DFARS 252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting 1 Oct 16
4 May 2022
OTHER
AETCI-36-2601 Type 1 Training
ANSI/EIA-649B
National Consensus Standard for
Configuration Management 1 Apr 11
AR SCG
Aerial Refueling Security Classification Guide
Boeing
Document
AS5553C
Aerospace Standard Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition 14 Nov 19
AS6174
Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming Material
1 Jul 14
AS6081
Fraudulent/Counterfeit Electronic Parts:
Avoidance, Detection, Mitigation and Disposition –Distributors
1 Nov 12
AS6171
Test Methods Standard; General Requirements, Suspect/Counterfeit, Electrical, Electronic, and Electromechanical Parts
1 Apr 18
AS6496
Fraudulent/Counterfeit Electronic Parts:
Avoidance, Detection, Mitigation, and Disposition - Authorized/Franchised Distribution
1 Aug 2014
AS9100C:2009
Quality Management Systems – Requirements for Aviation, Space, and Defense Organizations
15 Jan 09
AS9100D:2016
Quality Management Systems –
Requirements for Aviation, Space, and
Defense Organizations
20 Sep 16
CNSSI 1254
Risk Management Framework
Documentation, Data element Standards, and Reciprocity Process for National Security Systems
31 Aug 16
DD Form 250 Material Inspection and Receiving Report Feb 2002
DD Form 254 Department of Defense Contract Security
Classification Specifications Nov 2017
3.0 TASKS
The Contractor shall ensure all support provided to the USG-led depot activation for commodities complies with FAA-defined processes and procedures, and ensures compliance with Amended, Supplemental, and Military Type Certifications (ATC/STC/MTC).
It is the intent of the USG that each of the three (3) Air Force Air Logistics Centers (ALC) will act as repair stations authorized for return of LRUs and commodities to service. Each respective FOPR will identify the ALC activating a depot LRU repair line.
The Contractor shall support the USG-led KC-46 Commodities Depot Activation Support (CDAS) to include the following as described in each respective FOPR.
4 May 2022
3.1 Engineering and Technical Support: The Contractor shall:
Provide applicable technical data, engineering drawings, and maintenance manuals as required.
Physically observe, monitor, evaluate, and provide on-site assistance during repair processes.
Identify and provide industry best practices, recommendations, considerations, and special repair instructions (technique sheets, locally developed process instructions) used for overhaul at the contractor’s facility.
3.2 Support Equipment (SE) and Tooling: The Contractor shall:
Provide for the complete delivery of calibrated and non-calibrated SE and Tooling required to support organic depot activation standup.
3.2.1 SE Manuals: Provide manuals required for inspection, repair, test, and calibration of SE and Tooling (including applicable step-by-step procedures), provide timely responses to requests for technical data clarification requests, and provide industry best practices recommendations manuals and procedures as required. (DI-TMSS-81675A, CDRL
A005)
3.2.2 SE Supply Support: Identify stock numbers and sources of supply for “off-the-shelf”, custom or unique SE and tooling including drawings and recommended fabrication sources. (DI-SESS-82294/T, CDRL A007)
3.3 Training: The Contractor shall:
3.3.1 Classroom and/or On-the-Job Training (OJT): Provide required or recommended academics and hands-on training for LRU inspection, repair, operational check, calibration, and test. Upon USG acceptance of Contractor format, the Contractor shall provide training to the applicable ALCs per timelines identified in each respective FOPR to include consolidating training and embracing “train-the-trainer” type training whenever feasible. (DI- ILSS- 80872, CDRL A001)
3.3.2 Courseware: Provide all required or recommended training materials. The Contractor shall provide all courseware associated with applicable training in Contractor format
(pending USG acceptance) no later than five (5) business days prior to training start date(s). (DI-ILSS-80872, CDRL A001)
3.3.3 Mature Repair Process Training: Provide required training to ALC personnel. Training shall be conducted at contractor’s facility or other facility with developed mature repair processes for KC-46 components (pending USG acceptance). Training shall enable Air
Force (AF) personnel to observe actual repair processes to include: the proper use of fixtures; tooling and test equipment; processing equipment; and provisions for AF personnel interaction with Contractor technicians. (DI-ILSS-80872, CDRL A001)
3.4 Parts/Supply: The Contractor shall:
Provide One (1) applicable Serviceable/Unserviceable ‘Gold Standard” LRU and, if requested in a FOPR, a commodity identified as requiring a “Gold Standard” shall be delivered with statistical data verifying accuracy. Equivalent data shall also be provided for equipment acceptance (repeatability) of a serviceable item. “Gold Standard” commodities
4 May 2022 shall be provided with third party-certified testing results. Test results shall include a minimum of five (5) iterations of every test identified in the commodity repair/certification process.
The Contractor shall provide Piece parts for repair and overhaul for the applicable commodities at the replacement percentage identified in the Bill of Material (BOM) within the Organic Gap Analysis Report contained in each respective FOPR. The Contractor shall provide the piece parts in single restoration kits.
Follow industry standard packing, shipping, handling, and transportation procedures and processes for all piece parts delivered to the USG.
3.4.1 Parts Management Plan: Provide a plan no later than 30 days after award of the base
ID/IQ contract and each respective FOPR. (DI-SDMP-81748 CDRL A006)
3.5 Reparable Spares: The Contractor shall:
Deliver reparable LRUs to the depots in the quantities identified in each respective FOPR.
Provide the USG written notification of any deviations from the Organic Gap Analysis
Report contained in the FOPR.
Within thirty (30) days of FOPR award, provide USG written notification of LRUs with part number rolls, substitutions, or interchangeable parts. Notification shall include impact to price, effectivity data for current and new parts, and delivery date.
Within fifteen (15) of FOPR award, Critical Safety Item (CSI) or reparable provide USG written notification of LRUs that encountered part number roll due to safety of flight issues or Airworthiness Directives. Notification shall include impact to price, effectivity data for current and new parts, and delivery date.
3.6 Airworthiness: The Contractor shall include airworthiness documentation ensuring product traceability to the part manufacturer and repair source (as applicable) for FAA- certified parts, FAA Standard Parts, and non-certified parts/military-certified parts.
For FAA-certified parts, FAA Form 8130-3 is required. This form shall be completed in accordance with FAA Order 8130-21.
For non-FAA-certified parts, a Certificate of Conformance (CoC) is required.
For FAA-approved Standard Parts (consumables), a CoC is required.
The CoC shall ensure all reparable LRUs receive a FAA Form 8130-3 (definition) or CoC pursuant to the appropriate quality system as required by the STC design approval. The CoC shall include, at a minimum, the following information: National Stock Number (NSN), part number, lot/batch number, serial number (if available), manufacturer cage code, Contractor cage code, and contract number.
3.7 Warranty, Return, and Discrepant Orders: In addition to warranties listed in Federal
Acquisition Regulation (FAR) clause 52.212-4(o), the Contractor shall provide at least the same warranty terms offered to the general public in customary commercial practice for items acquired under the contract (e.g., extended warranties, pass through warranties), accept returns, and, if the authorized customer still requires the product(s), replace the product(s) under the following conditions:
4 May 2022
Incorrect products shipped.
Products damaged in shipment.
Products with concealed shipping damages.
Products which are recalled, regardless of level of recall. Does not apply when the manufacturer's policy states otherwise, in which case the manufacturer's disposition instructions will be followed. The Contractor shall provide disposition instructions to the customer within 15 days of notification of receipt of discrepant goods. If the Contractor does not provide instructions within 15 days of notification, the USG may return the discrepant material to the Contractor's address at the Contractor's risk and expense.
Other returns consistent with the Contractor’s normal return policy to include return of excess material ordered by the customer based on a projected estimate.
3.8 Sustainment and Maintenance Support: The Contractor shall verify the information identified within the organic gap analysis to include:
Maintenance manual required for inspection, repair, and operational check.
Procurement options and cost if maintenance manuals are not available to USG.
All Special tools and tools required for inspection, repair, and operational check per
Original Equipment Manufacturer (OEM).
All parts by nomenclature and part number required to repair per OEM.
All Hazardous Material required for inspection, repair, and operational check per OEM.
Space required for storage of each item in original packing by Length x Width x Height.
Training required to inspect, repair, and operational check per OEM.
SE required for inspection, repair, and operational check per OEM.
3.9 Information Security: The contractor shall consult and comply with the applicable security classification guide to monitor Controlled Unclassified Information (CUI) aggregation for potentially generating classified information by compilation. DoDI 5200.48, Controlled
Unclassified Information, AFI 16-1404 Air Force Information Security Program, and
Air Force Guidance Memorandum 2020-16-01, Air Force Guidance Memorandum for
CUI, 23 July 2020
The Contractor shall comply with Department of Defense Freedom of Information Act program requirements. DoDM 5400.7/Air Force Manual 33-302 Freedom of Information
Act Program Requirements
The contractor shall protect CUI and unclassified DoD information not approved for public release. DoDI 8582.01, Security of Non-DoD Information Systems Processing
Unclassified Nonpublic DoD Information
3.9.1 CUI Controls: If more specific categories of CUI require more stringent controls, the contractor must insure non-DoD Information Systems are protected. DFARS 252.204-
7008 Compliance with Safeguarding Covered Defense Information Controls. NIST
Special Publication 800-171, Protecting Controlled Unclassified Information in
4 May 2022
Nonfederal Information Systems and Organizations. (DI-MISC-80508B, CDRL
A008)
3.9.2 Covered Defense Information: Covered Defense Information [Required for all solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items]
The Contractor shall comply with Safeguard Covered Defense Information and Cyber
Incident Reporting requirements to contracts and subcontracts requiring contractors and subcontractors to safeguard covered defense information that resides in or transits through covered contractor information systems by applying specified network security controls. It also requires reporting of cyber incidents. It does not abrogate any existing contractor physical, personnel, or general administrative security operations governing the protection of unclassified DoD information, nor does it impact requirements of the
National Industrial Security Program. DFARS 252.204-7012 Safeguard Covered
Defense Information and Cyber Incident Reporting (Dec 2019). ( DI-MISC-
80508B, CDRL A009)
3.10 Reviews: The Contractor shall host, attend, participate, conduct (virtually or face-to face) the following reviews/meetings/working groups as required by the Program Office according to the following frequencies during the period of performance of the contract.
Travel shall be in accordance with Joint Travel Regulations (JTR) Volume II.
3.10.1 Post Award Conference (PAC):Contractor and USG representatives shall conduct a
PAC no later than 15 calendar days after contract award. The meeting may be held virtually or at one of the following locations: WPAFB, OC-ALC, OO-ALC or WR-
ALC.
The PAC will discuss contract conditions as well as confirm the requirements baseline, schedule, and deliverables necessary to successfully complete the program.
Entrance Criteria: Receipt and acknowledgement by the USG of informal agenda and requests for clarification.
3.10.1.1 Deliverables: Informal agenda and requests for clarification provided five (5) calendar days before meeting and informal meeting minutes and presentation provided five (5) calendar days after meeting. (DI-ADMN-81249C, CDRL A002)
3.10.1.2 Exit criteria: On PAC completion, all briefing slides, minutes, and action items will be provided via e-mail to all meeting participants not later than 10 (ten) working days after the meeting. ( DI-ADMN-81250C, CDRL A003)
3.10.2 Quarterly Reviews (virtually or in person):Scheduling: Occur four times per year through the contract period of performance but no later than 30 calendar days after award of FOPR.
Agenda: Confirm requirements scope, schedule, and deliverables for SOW Section 3
(Tasks) stated in the Organic Gap Analysis Report. Review commodities listed in the respective FOPR.
Entrance Criteria: Receipt and acknowledgement by the Contractor of the Organic Gap
Analysis Report and requests for clarification submitted to the USG. Receipt and acknowledgement by the USG of informal agenda; requests for clarification; and list of
4 May 2022 reparable LRUs successfully delivered to respective destinations.
3.10.2.1 Deliverables: Informal agenda and requests for clarification provided five (5) calendar days before meeting and informal meeting minutes and presentation provided five (5) calendar days after meeting. (DI-ADMN-81249C, CDRL A002)
3.10.2.2 Exit criteria: No later than ten (10) working days after the meeting all briefing slides, minutes, and action items will be provided via e-mail to all meeting participants. If in person meeting is desired, the Contractor shall provide meeting facilities at Contractor’s facilities. (DI-ADMN-81250C, CDRL A003)
3.10.3 Monthly Status Updates: Provide data updates to include updated Integrated Master
Schedule (IMS) and progress; constraints; needed information; and open action items to the ALCs by the 5th of each month. (DI-MGMT-81861C/T, CDRL A004)
3.10.4 Weekly Teleconferences: The Contractor shall be prepared to participate in teleconferences with the USG and primary subcontractors, as requested by the USG.
Items to be discussed, but not limited to, are schedules, action items, obstacles, and issues.
3.10.4.1 Action Items/Minutes: The Contractor shall track all action items generated and record informal meeting minutes. Action items shall be reviewed weekly between the Contractor and USG. The minutes from the meeting will be submitted within five (5) working days. (DI-MGMT-81861C/T, CDRL A004)
4 May 2022
APPENDIX A
FY22 ORGANIC GAP ANALYSIS COMPONENTS
The following tables contain the components that are undergoing organic gap analysis during FY21 at the three Air Logistics Centers. These components are expected to be the first Fair Opportunity
Proposal Request (FOPR) released under this overarching contract in FY22.
WARNER ROBINS ALC
Component Workload Part Number Activation
Date
CMM OEM
RECEIVER,RADAR
R-2630/ALR-69A
RWR G719050-50 10/3/2023 TO Raytheon
PROCESSOR,
COUNTERMEASURE
S SIGNAL CP-
2562/ALR-69A
RWR G719100-15 10/3/2023 TO Raytheon
APU ELECTRONIC
CONTROL UNIT
Control
Units
70721384-1 6/7/2025 49-61-19 Honeywell
AIR DATA INERTIAL
REFERENCE UNIT (I-
ADIRU) (ESDS)
Control
Units HG2051BC50 6/7/2025 34-26-49 Honeywell
CABIN PRESSURE
CONTROLLER
Control
Units
2117388-1001 6/7/2025 21-31-48 Honeywell
WINDOW HEAT
CONTROL UNIT
SERIES 2 (POST SB
624066-30-18)
Control
Units
624066-5 6/7/2025 30-41-07 Honeywell
T3CASTRAFFIC
MANAGEMENT
COMPUTER MASS
T3CAS 9005000-
30901 8/20/2025 O to OEM
Aviation
Communication
INTEGRATED
PROCESSING
CABINET, IPC-9000
TSAS 822-3130-001 9/16/2025 36-11-24 Rockwell
WRT-2100
RECEIVER-
TRANSMITTER
Color WxR 822-1710-002 5/3/2025 34-40-58 Rockwell
WCP-701/702
CONTROL PANEL
Color WxR 822-3159-001 6/14/2025 34-45-52 Rockwell
WFA-701X
WEATHERRADAR
FLAT PLATE
ANTENNA
Color WxR 622-5137-601 6/14/2025 34-45-53 Rockwell
4 May 2022
WARNER ROBINS ALC
CHASSIS
ELECTRICAL
Color WxR 641-9122-100 9/30/2025 34-45-52 (NHA P/N:
822-
3159-001)
Rockwell
AROSBOOM
LIGHTING
CONTROL
PANEL ASSEMBLY
AROS
Cntrl
Modules 842-447181-
9/30/2025 28-53-10 Boeing/DRS
AROSIMAGE
PANORAMIC
CONTROLSPANEL
ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-09 Boeing/DRS
AROS 3D CAMERAS
PANEL ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-11 Boeing/DRS
AROS DROGUE
JETTISONCONTROL
PANEL ASSEMBLY
AROS
Cntrl
Modules 842-447181-
9/30/2025 28-53-04 Boeing/DRS
AROS ARMS
CONTROLSPANEL
ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-06 Boeing/DRS
AROS ALT BOOM
STOWPANEL
ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-07 Boeing/DRS
AROS CONTROLS
PANEL ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-05 Boeing/DRS
AROS LIGHTING
CONTROLSPANEL
ASSEMBLY
AROS
Cntrl
Modules
842-447181-
9/30/2025 28-53-08 Boeing/DRS
4 May 2022
OGDEN ALC
Component Workload Part Number Activation
Date
CMM OEM
MAIN BRAKE
ASSEMBLY (767)
Wheels &
Brakes
2612412-1 3/1/2025 32-43-12 Honeywell
MAIN LANDING
GEARWHEEL
ASSEMBLY
Wheels&
Brakes 2608811-5 3/1/2025 32-43-04 Honeywell
767 NOSELANDING
GEAR WHEEL
ASSEMBLY
Wheels&
Brakes 2606735-2 3/1/2025 32-43-01 Honeywell
CABINPRESSURE
SELECTOR
Cabin
Pressure 65053858-2 5/24/2025 21-34-07 Honeywell
PNEUMATIC
STARTER
Starter 774860A11 7/22/2025 80-12-03 Hamilton
Sundstrand
STARTERCONTROL
VALVE
Starter 811390-4 7/22/2025 80-12-09 Hamilton
Sundstrand
4 May 2022
OKLAHOMA CITY ALC
Component Workload Part Number Activation
Date
CMM OEM
HIGH PRESSURE
SHUTOFFVALVE/
PRESSURE
REGULATING
VALVE
Pneumatic I 825301-2 5/3/2025 36-11-26 Hamilton
Sundstrand
TURBINE BYPASS
VALVE
Pneumatic I 825214-1 5/3/2025 21-51-82 Hamilton
Sundstrand
PRESSURE
REGULATINGAND
SHUTOFF VALVE
Pneumatic I 825303-2 5/3/2025 36-11-21
Hamilton
Sundstrand
VALVE ASSEMBLY Pneumatic I N012100000-1 5/3/2025 29-11-12 Fairchild
Controls Corp
INTERMEDIATE
PRESSURECHECK
VALVE
Pneumatic I 808556-1 5/3/2025 36-12-16
Hamilton
Sundstrand
FLOWCONTROL
AND SHUTOFF
VALVE
Pneumatic I 825204-1 5/3/2025 21-51-76
Hamilton
Sundstrand
MOTOR OPERATED
AIRSHUTOFF
VALVE
Pneumatic I 67-2985-003 5/3/2025 24-09-03 Honeywell
PRESSURE
REGULATING
VALVE
CONTROLLER
Pneumatic I 825310-1 5/3/2025 36-11-24
Hamilton
Sundstrand
ISOLATION BYPASS
CHECK VALVE
Pneumatic I 732-11750-03 5/3/2025 36-11-01 Shimadzu
MASK STOWAGE
BOX
Mask
Stowage
MXP806-1 6/14/2025 35-13-44 Intertechnique-
Eros
MASK STOWAGE
BOX
Mask
Stowage
MXP147-3 6/14/2025 35-11-79 Intertechnique-
Eros
SINGLEWALL
MOUNTED
ATTENDANT SEAT
Seats I 2112-279A2B 9/6/2025 25-73-71 (2112-
270RD)
Goodrich
FIRST OBSERVER
SEAT
Seats I 1116-11AD 9/6/2025 25-77-86 (2112-
279A2B)
Goodrich
4 May 2022
OKLAHOMA CITY ALC
TRACKMOUNTED
SINGLE
ATTENDANT
SEAT
Seats I 2113-789A2B 9/6/2025 25-10-16 Goodrich
GIMBAL ASSEMBLY ARB
Gimbal
842-349220-2 9/27/2025 25-72-45 (P/N: 2113-
755RD)
Boeing
4 May 2022
FA8609-22-R-B003
Section J, Attachment
APPENDIX B
DEFINITION OF GOVERNMENT SPECIFIC TERMS
Activation Date – The estimated date that the component commodity line will be available for KC-
46 usage. Minimum requirements that must be met include facilities, manpower, training, parts supportability, and Military Repair Station (MRS) Qualification.
Certificate of Conformity (CoC) - The actual FAA Aircraft Certification Form 8130-3 that is used to document maintenance performed on an aviation article (e.g., inspection, repair, or overhaul).
component maintenance manual - Common commercial aviation terminology for aircraft and aircraft component technical data. Provides instructions for the repair, inspection, installation, assembly, overhaul, and maintenance of aircraft, aircraft components, and aircraft support equipment.
Controlled Unclassified Information - Any information that law, regulation, or government wide policy requires to have safeguarding or disseminating controls, excluding information that is classified under Executive Order 13526, Classified National Security Information, December 29, 2009, or any predecessor or successor order, or the Atomic Energy Act of 1954, as amended. The
National Archives and Records Administration (NARA) CUI Registry
(http://www.archives.gov/cui/registry/category-list.html) identifies approved CUI categories and subcategories, provides general descriptions, identifies the basis for controls, and sets out procedures for the use of CUI.
Critical Safety Item (CSI) - A CSI is any part, assembly, or piece of support equipment whose failure could cause loss of life, permanent disability or major injury, loss of a system or significant equipment damage. Special attention shall be placed on CSIs to prevent the potential catastrophic or critical consequences of failure. Significant problems can occur when Department of Defense
(DoD) purchases CSIs from suppliers with limited knowledge of the item’s design, intent, application, failure modes, failure effects, or failure implications.
FAA Form 8130-3 - Is the Statement of Compliance with Federal Aviation Regulation. Also known as the airworthiness approval tag or authorized release certificate. It is used to certify compliance with applicable requirements of 14 CFR Part 21 and certifies if a new part, engine, or entire plane is airworthy but can also be used to return a part, engine, or plane back to service after repair.
Fair Opportunity Proposal Request (FOPR) - A FOPR is the official contractual mechanism that is used to order supplies and/or services under a multiple award, Indefinite Delivery Indefinite
Quantity contract. The Federal Acquisition Regulation requires that all awardees under a multiple award contract be given a fair opportunity to respond to and to be considered for each task or delivery order request for proposal.
Gold Standard - A gold standard end item is a known good commodity used for baseline testing and equipment recertification. Gold standard commodities shall be provided with third party certified testing results. Testing results shall include a minimum of five iteration of every test identified in commodity.
Hazardous Material - Any material that, because of its quantity, concentration, or physical or chemical characteristics, may pose a real hazard to human health or the environment. Hazardous materials include the following categories: Flammable and Combustible Material, Toxic Material, http://www.archives.gov/cui/registry/category-list.html
4 May 2022
FA8609-22-R-B003
Section J, Attachment
Corrosive Material, Oxidizers, Aerosols, and Compressed Gases.
Special Tooling - Refers to jigs, dies, fixtures, molds, patterns, taps, gauges other equipment or manufacturing aids, all components of these items and replacements are of such a specialized naturethat without substantial modification or alternation their use is limivelopment, repair, or test of a specific component.
Support Equipment (SE) - Powered and non-powered aerospace ground equipment (AGE);
Propulsion Support Equipment (PSE); Depot Industrial Plant Equipment (DIPE); Test, Measurement, and Diagnostic Equipment (TMDE); nuclear, conventional, and chemical munitions handling and test equipment; ground photographic equipment; trainers; and special tools and hand tools developed by the OEM requiring scheduled inspections
Tooling - Refers to common, off-the-shelf tools used in the maintenance process.