Technical_Evaluation_Safety_Valves_Contract_2013.doc
DOC document 33 KB Posted
- Attached to
- Safety Valve Inspection/Repair Services
- Solicitation number
- FA8601-13-T-0222
About this file
Describes to Contractor how Civil Engineering will be evaluating the Technical aspects of their proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8601-13-T-0222_Safety_Valve_Model_Contract_Final.pdf | ||
| SITE_VISIT_BRIEFING.docx | DOCX document | |
| Wage_Determination.pdf | ||
| Bid_Schedule_For_Safety_Valves.xlsx | XLSX spreadsheet | |
| FA8601-13-T-0222_Safety_Valves_Model_Contract.pdf | ||
| PWS_SAFETY_VALVES_16_Final_Draft.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Evaluation Checklist
REMOVE, REPAIR/OVERHAUL, SET, TEST, AND REINSTALL SAFETY VALVES FOR BOILERS LOCATED IN AREA A AT BUILDINGS 31240 & 34019, AND AREA B AT BUILDINGS 20770 & 20080
Evaluator: _______________________________
Offeror: _________________________________
RATING CHOICES: (A) Acceptable; (B) Reasonable susceptible of being made acceptable (Marginal); -or- (C) Unacceptable.
NOTE: Any element receiving a rating of (B) or (C) will require a detailed explanation. The detailed explanation will be required to bring it up to an acceptable rating -or- why the element was unacceptable.
TECHNICAL RATING COMMENTS
Factor T-1 "VR" STAMP PROGRAM CERTIFICATION A B C
· The contractor performing valve repair shall have a valid Certificate of Authorization in the National Board Valve Repair (“VR” Stamp) Program.
https://www.nationalboard.org/default.aspx Verification can be found on website.
Factor T-2 Scheduling Methodology
- Includes a realistic work schedule and exhibits an understanding A B C of the work by addressing all requirements listed in the PWS, which also includes the Work Load Data?
Factor T-3: UNDERSTANDING OF REQUIREMENTS A B C
- Did the proposal demonstrate an understanding of the requirements as stated in the Performance Work Statement and the Solicitation?
File details come from the government source that posted it. Updated .