Technical_Evaluation_Safety_Valves_Contract_2013.doc

DOC document 33 KB Posted

Attached to
Safety Valve Inspection/Repair Services
Solicitation number
FA8601-13-T-0222
Issued by

About this file

Describes to Contractor how Civil Engineering will be evaluating the Technical aspects of their proposal.

View the file

Other files

File Type Posted
FA8601-13-T-0222_Safety_Valve_Model_Contract_Final.pdf PDF
SITE_VISIT_BRIEFING.docx DOCX document
Wage_Determination.pdf PDF
Bid_Schedule_For_Safety_Valves.xlsx XLSX spreadsheet
FA8601-13-T-0222_Safety_Valves_Model_Contract.pdf PDF
PWS_SAFETY_VALVES_16_Final_Draft.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Evaluation Checklist

REMOVE, REPAIR/OVERHAUL, SET, TEST, AND REINSTALL SAFETY VALVES FOR BOILERS LOCATED IN AREA A AT BUILDINGS 31240 & 34019, AND AREA B AT BUILDINGS 20770 & 20080

Evaluator: _______________________________

Offeror: _________________________________

RATING CHOICES: (A) Acceptable; (B) Reasonable susceptible of being made acceptable (Marginal); -or- (C) Unacceptable.

NOTE: Any element receiving a rating of (B) or (C) will require a detailed explanation. The detailed explanation will be required to bring it up to an acceptable rating -or- why the element was unacceptable.

TECHNICAL RATING COMMENTS

Factor T-1 "VR" STAMP PROGRAM CERTIFICATION A B C

· The contractor performing valve repair shall have a valid Certificate of Authorization in the National Board Valve Repair (“VR” Stamp) Program.

https://www.nationalboard.org/default.aspx Verification can be found on website.

Factor T-2 Scheduling Methodology

- Includes a realistic work schedule and exhibits an understanding A B C of the work by addressing all requirements listed in the PWS, which also includes the Work Load Data?

Factor T-3: UNDERSTANDING OF REQUIREMENTS A B C

- Did the proposal demonstrate an understanding of the requirements as stated in the Performance Work Statement and the Solicitation?

File details come from the government source that posted it. Updated .