This document is an Amendment of Solicitation (Amendment 0001) for a federal contract opportunity to support Halvorsen 25K Cargo Loaders for the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The contract is a Fixed Price Incentive Firm Target (FPIF)/Firm Fixed Price (FFP) Indefinite Delivery Requirements type, with a five-year period of performance consisting of a one-year basic contract period and four one-year option periods. The primary services include Vehicle Depot Overhaul and Unscheduled Depot Level Maintenance for the Halvorsen Aircraft Cargo Loader, which is a self-propelled 25,000-pound capacity aircraft cargo transporter used to transfer loads to and from warehouses and cargo aircraft.
The amendment implements two specific Class Deviations (2025O0003 and 2025O0004) which remove certain clauses related to sustainability and equal opportunity. The contract anticipates a best estimated quantity of 30 vehicle depot overhauls per year, with pricing structured to include target cost, target profit, and a ceiling price set at 120% of total target cost. The government intends to award this contract sole source to Leonardo DRS, with the formal solicitation anticipated to be available around August 16, 2024. Foreign participation is not permitted under this contract, and potential contractors are advised to review the full solicitation details carefully.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JL
2. AMENDMENT/MODIFICATION NO.
FA8534-24-R-0007-0001
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD2060-24-31666
5. PROJECT NO (If applicable) N/A
6. ISSUED BY CODE
AGILE AIRBASE, AFLCMC/ROKC
235 BYRON ST BLDG 300 STE 19A
ROBINS AFB GA 31098-1670
BUYER: Tiffany R. Davis-Patterson/ROKC tiffany.davis-patterson@us.af.mil
7. ADMINISTERED BY (If other than item 6) CODEFA8534
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA853424R0007
9B. DATED (SEE ITEM 11)
30-SEP-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8534-24-R-0007-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to implement Class Deviations 2025O0003, Restoring MeritBased Opportunity in Federal Contracts and 2025O0004, Revocation of Executive Order on Sustainability which incorporate removal and/or changes of the clauses as denoted below:
A. The following clauses are hereby removed and are no longer applicable:
52.22221, PROHIBITION ON SEGREGATED FACILITIES
52.22226, EQUAL OPPORTUNITY
52.22322, PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION
GOALS REPRESENTATION
B. All other terms and conditions remain unchanged
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
(A) GENERAL:
This is a Fixed Price Incentive (Firm) Target (FP(I)F)/Firm Fixed Price (FFP) Indefinite Delivery Requirements Type contract for the issuance of orders in support of the Halvorsen 25K Cargo Loaders.
The contractor shall provide all parts, tools, labor, and materials necessary for this effort. Work accomplished in support of Aircraft Cargo Loaders shall be accomplished in accordance with the Performance Based Work Statement (PWS) attached hereto.
(B) BEST ESTIMATED QUANTITIES/COSTS (BEQ/BEC):
The required quantity is not known at this time. The quantities identified are Best estimated Quantities (BEQs) and Best Estimated Costs (BECs) based on the actual history and projected requirements. Any single order may be issued for quantities in excess of or less than the BEQ. The failure of the Government to order the BEQ/BEC will not entitle the contractor to an equitable adjustment in price under the contract.
(C) OPTIONS:
Each option may be exercised on or before the last day of the previous basic contract period or option period. An option is considered to have been exercised at the time the Government provides contract modification to the contractor via email.
(D) PERIOD OF PERFORMANCE:
The period of performance for this effort is five (5) years, consisting of a 1year Basic Contract Period and four (4) 1year annual options.
*Should an effort ordered under this contract cross contract years, the CLIN cited on the order shall reflect the contract year in which the order was originally awarded.
(E) CEILING PRICE:
As noted in Schedule B, the ceiling price shall be 120% of Total Target Cost.
(F) RIGHT TO CANCEL:
The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels the solicitation, the Government has no obligation to reimburse the offeror for any costs.
Vehicle Depot Overhaul
Item No.
Vehicle Depot Overhaul
Incentive Firm Target Best Estimated Qty
U/I Target Cost Target Profit Total Target Price
30 EA
Vehicle Depot Overhaul In accordance with the Halvorsen Overhaul Performance Based Work Statement (PWS):
Ceiling Price = 120% of Target Cost = $____________.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
HALVORSEN SHIPMENT/PACKAGING PREPARATION: After loader overhaul completion, each loader must be prepared for shipment in accordance with the Operator and Maintenance Instructions (TO 36M23452) to preclude damage during transport and damage that may occur when traversing loading/unloading ramps of tractor trailers, cargo aircraft, or ships.
NOTE FOR CLIN 0002:
The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.
UDLMs to be negotiated as FFP.
Loaded labor rates and material burden rates shall be proposed for CLIN 0002.
Unscheduled Depot Level Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unscheduled Depot Level Maintenance In accordance with the unique PWS to be provided with each individual Task/Delivery Order.
This contract line item is to be negotiated as FirmFixedPrice (or as otherwise deemed appropriate).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
12 MO NSP
Data In accordance with attached DD Forms 1423
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Vehicle Depot Overhaul
Item No.
Incentive Firm Target Best Estimated Qty
U/I Target Cost Target Profit Total Target Price
30 EA
Vehicle Depot Overhaul In accordance with the Halvorsen Overhaul Performance Based Work Statement (PWS):
Ceiling Price = 120% of Target Cost = $_____________.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
Vehicle Depot Overhaul
NONE
HALVORSEN SHIPMENT/PACKAGING PREPARATION: After loader overhaul completion, each loader must be prepared for shipment in accordance with the Operator and Maintenance Instructions (TO 36M23452) to preclude damage during transport and damage that may occur when traversing loading/unloading ramps of tractor trailers, cargo aircraft, or ships.
NOTE FOR CLIN 1002:
The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.
UDLMs to be negotiated as FFP.
Loaded labor rates and material burden rates shall be proposed for CLIN 1002.
Unscheduled Depot Level Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unscheduled Depot Level Maintenance In accordance with the unique PWS to be provided with each individual Task/Delivery Order.
This contract line item is to be negotiated as FirmFixedPrice (or as otherwise deemed appropriate).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
Data
12 MO NSP
Data In accordance with attached DD Forms 1423
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Vehicle Depot Overhaul
Item No.
Incentive Firm Target Best Estimated Qty
U/I Target Cost Target Profit Total Target Price
30 EA
Vehicle Depot Overhaul In accordance with the Halvorsen Overhaul Performance Based Work Statement (PWS):
Ceiling Price = 120% of Target Cost = $______________.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
HALVORSEN SHIPMENT/PACKAGING PREPARATION: After loader overhaul completion, each loader must be prepared for shipment in accordance with the Operator and Maintenance Instructions (TO 36M23452) to preclude damage during transport and damage that may occur when traversing loading/unloading ramps of tractor trailers, cargo aircraft, or ships.
NOTE FOR CLIN 2002:
The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.
UDLMs to be negotiated as FFP.
Loaded labor rates and material burden rates shall be proposed for CLIN 2002.
Unscheduled Depot Level Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unscheduled Depot Level Maintenance In accordance with the unique PWS to be provided with each individual Task/Delivery Order.
This contract line item is to be negotiated as FirmFixedPrice (or as otherwise deemed appropriate).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
12 MO NSP
Data In accordance with attached DD Forms 1423
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Vehicle Depot Overhaul
Item No.
Incentive Firm Target Best Estimated Qty
U/I Target Cost Target Profit Total Target Price
30 EA
Vehicle Depot Overhaul In accordance with the Halvorsen Overhaul Performance Based Work Statement (PWS):
Ceiling Price = 120% of Target Cost = $______________.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
HALVORSEN SHIPMENT/PACKAGING PREPARATION: After loader overhaul completion, each loader must be prepared for shipment in accordance with the Operator and Maintenance Instructions (TO 36M23452) to preclude damage during transport and damage that may occur when traversing loading/unloading ramps of tractor trailers, cargo aircraft, or ships.
NOTE FOR CLIN 3002:
The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.
UDLMs to be negotiated as FFP.
Loaded labor rates and material burden rates shall be proposed for CLIN 3002.
Unscheduled Depot Level Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unscheduled Depot Level Maintenance In accordance with the unique PWS to be provided with each individual Task/Delivery Order.
Unscheduled Depot Level Maintenance
This contract line item is to be negotiated as FirmFixedPrice (or as otherwise deemed appropriate).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
12 MO NSP
Data In accordance with attached DD Forms 1423
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Vehicle Depot Overhaul
Item No.
Incentive Firm Target Best Estimated Qty
U/I Target Cost Target Profit Total Target Price
30 EA
Vehicle Depot Overhaul In accordance with the Halvorsen Overhaul Performance Based Work Statement (PWS):
Ceiling Price = 120% of Target Cost = $______________.
Limitations of Liability: Other Than High Value Item
Vehicle Depot Overhaul
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
Class I ODS Substance Application/Use Quantity
NONE
HALVORSEN SHIPMENT/PACKAGING PREPARATION: After loader overhaul completion, each loader must be prepared for shipment in accordance with the Operator and Maintenance Instructions (TO 36M23452) to preclude damage during transport and damage that may occur when traversing loading/unloading ramps of tractor trailers, cargo aircraft, or ships.
NOTE FOR CLIN 4002:
The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.
UDLMs to be negotiated as FFP.
Loaded labor rates and material burden rates shall be proposed for CLIN 4002.
Unscheduled Depot Level Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unscheduled Depot Level Maintenance In accordance with the unique PWS to be provided with each individual Task/Delivery Order.
This contract line item is to be negotiated as FirmFixedPrice (or as otherwise deemed appropriate).
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Class I ODS Substance Application/Use Quantity
NONE
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
12 MO NSP
Data In accordance with attached DD Forms 1423
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012015 31DEC2015
DATA
Item No.
A001
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Work Breakdown Structure (CWBS)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A002
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Integrated Program Management Data and AnalysisReport (IPMDAR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A003
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Funds Status Report (CFSR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
DATA
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A004
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Conference Minutes
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A005
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Associated with LI: 0006
DATA
Configuration Audit Summary Report (CASR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A006
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Test/Inspection Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
+ IAW1423 1 LO
DATA
Item No.
A007
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Evaluation of COTS Manuals
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A008
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
IUID Marking Plan
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
A009
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Accident/Incident Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
A010
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Quality Assurance Program Plan (QAPP)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B001
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Work Breakdown Structure (CWBS)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 9001:2015 31DEC2015
DATA
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B002
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Integrated Program Management Data and AnalysisReport (IPMDAR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B003
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Associated with LI: 0006
DATA
DATA
Contract Funds Status Report (CFSR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B004
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Conference Minutes
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
DATA
+ IAW1423 1 LO
DATA
Item No.
B005
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Configuration Audit Summary Report (CASR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B006
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Test/Inspection Report
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B007
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Evaluation of COTS Manuals
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
B008
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
IUID Marking Plan
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B009
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Accident/Incident Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
DATA
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
B010
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Quality Assurance Program Plan (QAPP)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C001
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Contract Work Breakdown Structure (CWBS)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C002
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Integrated Program Management Data and AnalysisReport (IPMDAR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
DATA
+ IAW1423 1 LO
DATA
Item No.
C003
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Funds Status Report (CFSR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C004
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Conference Minutes
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C005
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Configuration Audit Summary Report (CASR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
C006
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Test/Inspection Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C007
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Evaluation of COTS Manuals
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
DATA
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C008
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
IUID Marking Plan
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C009
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Accident/Incident Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
C010
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Quality Assurance Program Plan (QAPP)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
DATA
+ IAW1423 1 LO
DATA
Item No.
D001
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Work Breakdown Structure (CWBS)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D002
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Integrated Program Management Data and AnalysisReport (IPMDAR)
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D003
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Funds Status Report (CFSR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
D004
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Conference Minutes
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D005
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Configuration Audit Summary Report (CASR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
DATA
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D006
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Test/Inspection Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D007
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Evaluation of COTS Manuals
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D008
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
IUID Marking Plan
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
DATA
+ IAW1423 1 LO
DATA
Item No.
D009
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Accident/Incident Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
D010
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Quality Assurance Program Plan (QAPP)
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E001
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Work Breakdown Structure (CWBS)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
E002
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Integrated Program Management Data and AnalysisReport (IPMDAR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E003
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Contract Funds Status Report (CFSR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
DATA
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E004
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Conference Minutes
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E005
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Configuration Audit Summary Report (CASR)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E006
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Test/Inspection Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
DATA
+ IAW1423 1 LO
DATA
Item No.
E007
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Evaluation of COTS Manuals
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E008
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
IUID Marking Plan
DATA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
DATA
Item No.
E009
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Accident/Incident Report
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed
DATA
Item No.
E010
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0006
DATA
Quality Assurance Program Plan (QAPP)
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2015 31DEC2015
Type / Ship To Quantity (U/I)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .