Request for Proposal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA853308R10864______0002.doc | DOC document | |
| Questions Answers 5 Nov 2008.doc | DOC document | |
| Amendment 01 to PD05WRLEEG11.doc | DOC document | |
| Questions Answers 2nd Set 31 Oct 2008.doc | DOC document | |
| Questions Answers 31 Oct 08.doc | DOC document | |
| FA853308R10864______0001 | — | |
| Questions Answers-17 Oct 08.doc | DOC document | |
| BPU PD - 14 Aug 08.doc | DOC document | |
| GOST 10227-86.pdf | ||
| C-17 appendix.pdf | ||
| Attachment4 | — | |
| Attachment5 | — | |
| Attachment1(FACTS Sheet)_10864.doc | DOC document | |
| Attachment7 | — | |
| BPU SOW - 03 Mar 08.doc | DOC document | |
| Attachment6 | — | |
| Packaging Requirements.pdf | ||
| CDRL ELIN A001-A012.pdf | ||
| CDRL ELIN F001-F003.pdf | ||
| CDRL ELIN C001.pdf | ||
| CDRL ELIN B001-B003.pdf | ||
| CDRL ELIN D001-D002.pdf | ||
| Attachment3 | — | |
| Attachment8(Schedule Structure for Qty Ranges)_10864.doc | DOC document | |
| CDRL ELIN E001.pdf | ||
| Attachment2 | — |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE SCHEDULE
(a) The contractor shall provide the BEAR Power Unit (BPU) in accordance with the Purchase Description (PD) PD05WRLEEG11, dated 14 August 2008 and Statement of Work (SOW), dated 03 Mar 2008. This RFP will result in a requirements-type contract as defined in FAR 16.5.
(b) See the RFP clause “Preproduction Unit Testing” for information relative to preproduction testing of the BPU. See the RFP Clause “Delivery Requirements” for pertinent information relative to the Government’s required delivery for the BPU preproduction units and production units.
(c) The Government will not accept Not Separately Priced (NSP), No Charge (N/C), $0.00, etc., on any line item other than those already designated as “NSP” in the Schedule. Offerors are advised to review all data items and ensure that they are proposing to the specific data requirements and level of effort.
(d) For Contract Line Item Number (CLIN) 007, offerors may either (1) propose only to the BEQ, or, (2) if more advantageous to the Government and/or Offeror, establish quantity/price ranges within the BEQ. If the offeror proposes quantity/price ranges within the BEQ, the information shall be identified on a separate attached page. Proposed ranges shall cover all quantities from 1 ea through the BEQ; however, proposed quantities shall not exceed the BEQ. Any single order for a quantity in excess of the BEQ shall be priced at the unit price proposed for the BEQ.
(e) The Economic Price Adjustment (EPA) clause applies to the following Contract Line Item Numbers (CLIN): 1001, 2001, 3001, 4001, 5001, 6001, and 7001.
(f) The quantities reflected in the Schedule represent the Government’s Best Estimated Quantities (BEQs) and do not represent a minimum or a maximum quantity. Failure of the Government to order the BEQ quantity shall not entitle the contractor to an equitable adjustment in price under the contract.
(g) The NSN shown in the Schedule is assigned for authorization and procurement purposes only. No assets will be shipped under this NSN. Each offeror shall identify the part number that it intends to assign to the end items produced under the resulting contract.
Offeror’s proposed part number for the BEAR Power Unit (BPU) :_______________________.
Offeror’s proposed part number for the Mission Readiness Spares Package (MRSP): _____________________.
BASIC CONTRACT PERIOD. (The prices in the Basic Contract Period shall be in effect from the effective date of the contract for a period of 36 months). Specific dates will be established upon award of the contract.
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
Amount
| 8 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
BPU Preproduction Units
In accordance with Purchase Description PD05WRLEEG11 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Acceptance: Origin
Inspection/Acceptance Report: Wide Area Work Flow
Quality Assurance: Higher Level Contract Quality Requirements
The Contractor shall comply with the standard(s) listed below.
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
Trade Agreement Act
FORMCHECKBOX
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE
F.O.B.
IN PLACE
ORIGIN
TBD
| Type / Ship To |
| PACRN |
| Mark For |
IN PLACE
TBD
PAA
PAA
TBD
TBD
| Type / Ship To |
| Quantity (U/I) |
| *ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
Required Delivery
| IN PLACE |
| 1 EA |
TBD
| TBD |
| 7 EA |
TBD
Proposed Delivery
| IN PLACE |
| 1 EA |
| TBD |
| 7 EA |
NOTE TO CONTRACTOR:
(a) The following must be accomplished before acceptance of preproduction units after approval of the test report:
Requirement
Reference Approved Test Plan/Procedures
CLIN 0003AA
Approved Contractor Test Report
CLIN 0003AB
Approved System Safety Program Plan
CLIN 0003AG
Approved Safety Hazard Analysis
CLIN 0003AH
Approved Corrosion Prevention and Control Plan
CLIN 0003AJ
100% Training Materials
CLIN 0003AL*
Approved Computer Software Product End Items
CLIN 0004AC
(Executable Code)
Approved 75% Technical Manuals
CLIN 0005*
90 Day Operational Test and Evaluation (OT&E)
Statement of Work (SOW), paragraph 4.2.
*Will be provided by the contractor for the 90-day OT&E.
(b) Government approval/acceptance of any requirement, plan/procedure, test plan/procedure, report, test report, inspection, inspection report, analysis, package, data package, technical package, manual, end items of whatever nature, preproduction units, production units, software, in short, of any deliverable under this contract of whatever nature, does not relieve the contractor of its obligations under the contract, does not constitute Government responsibility for defects in any of the aforesaid items, nor Government responsibility for any items' design, or constitute actual or constructive notice to the Government of defects, including latent defects. Any re-testing, re-drafting, re-writing, and/or additional efforts of whatever nature caused as a result of Government disapproval of any of the aforesaid items shall be at the sole cost of the contractor.
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 4 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Preproduction BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
Trade Agreement Act
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 4 EA |
TBD
Proposed Delivery
| TBD |
| 4 EA |
Item No.
DATA (ELINS A001 - A012)
IAW DD FORM 1423s attached hereto
Exhibit: A
FOB: Destination
Purchase Request: *
PR Line Item(s): *
ACRN: *
Item No.
0003AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A001 - Test Plan/Procedures (Preproduction Test Procedures)
Inspection: Destination
Acceptance: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: See Preproduction Unit Testing Clause
Note: Government notice of approval/disapproval within 45 days subsequent to receipt.
Item No.
0003AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A002 - Test/Inspection Report (Preproduction Test Report)
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: See Preproduction Unit Testing Clause
Note: Government notice of approval/disapproval within 45 days subsequent to receipt.
Item No.
0003AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A003 - Design Review Data Package (PDR and CDR Design Review Data Package)
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: See Preproduction Unit Testing Clause
Note: Government notice of approval/disapproval within 45 days after each design review.
Item No.
0003AD
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN A004 - Conference Agenda
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AE
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN A005 - Conference Minutes
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AF
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A006 - Technical Report/Study Services (Design Analysis)
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423 NOTE: Government approval/disapproval within 30 days after submission.
Item No.
0003AG
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A007 - System Safety Program Plan
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AH
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A008 - System Safety Hazard Analysis
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AJ
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A009 - Corrosion Prevention and Control Plan
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AK
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN A010 - Product Base Line Index (Configuration Management and Control)
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AL
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN A011 - Training Materials (O&M Familiarization Material)
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0003AM
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN A012 - Contractor's Progress, Status, and Management Report
Inspection: Destination
Exhibit: A
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423 NOTE: Requirement shall remain in effect until the acceptance of the last deliverable item on the contract.
Item No.
DATA (ELINS B001 - B003)
IAW DD FORM 1423s attached hereto
Exhibit: B
FOB: Destination
Purchase Request: *
PR Line Item(s): *
ACRN: *
Item No.
0004AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN B001 - Automated Computer Program ID Number (ACPIN)
Inspection: Destination
Exhibit: B
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0004AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN B002 - Software Version Description
Inspection: Destination
Exhibit: B
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0004AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN B003 - Computer Software Product End Items (Executable Code)
Inspection: Destination
Exhibit: B
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN C001 - Technical Manual Contract Requirements (TMCR) Set of Review Manuals
Inspection: Destination
FOB: Destination
Exhibit: C
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
NOTES:
1) Excluding the Preproduction BPU units, no delivery acceptance will occur without completed and Government accepted technical manuals.
2) All required in-process reviews will be coordinated through the PCO. Final delivery and acceptance of the technical data must be accomplished 90 days prior to shipment of the preproduction BPU units hereunder.
Item No.
DATA (ELINS D001 -D002)
Provisioning Technical Documentation (PTD) IAW DD FORM 1423s attached hereto
Exhibit: D
FOB: Destination
Purchase Request: *
PR Line Item(s): *
ACRN: *
NOTE: Provisioning Guidance Conference must be accomplished within 45 days after contract award.
Item No.
0006AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN D001 - Logistics Management Information (LMI) Data Products
Inspection: Destination
Exhibit: D
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0006AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| $ |
ELIN D002 - Supplemental Data for Provisioning (SDFP)
Inspection: Destination
Exhibit: D
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
For Contract Line Item Number (CLIN) 0007, the offeror may either (1) propose only to the BEQ, or, (2) if more advantageous to the Government and/or Offeror, establish quantity/price ranges within the BEQ. Proposed ranges shall cover all quantities from 1 ea through the BEQ; however, proposed quantities shall not exceed the BEQ. Any single order for a quantity in excess of the BEQ shall be priced at the unit price proposed for the BEQ.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 45 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008 A copy of the contractor’s commercial warranty and a copy of the pack-up manual shall be shipped with each BPU.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
Trade Agreement Act
FORMCHECKBOX
TYPE / SHIP TO CODE
TBD ORIGIN
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
NOTES: Each unit will have the following pack up data for each BPU:
1) 1 each technical manual IAW CLIN 0009
2) 1 each production acceptance test report IAW CLIN 0010
3) 1 each warranty
Please note that for Contract Line Item Number (CLIN) 0008, offerors shall propose to the BEQ only. The total price for CLIN 0008 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 22 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
Trade Agreement Act
FORMCHECKBOX
TYPE / SHIP TO CODE
TBD
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 22 EA |
TBD
Proposed Delivery
| TBD |
| 22 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirements (Pack-Up Data) One pack-up manual shall be included with each BPU ordered under this contract.
| Purchase Request(s) |
| PR Line Item(s) |
| * |
| * |
Inspection: Origin
FOB: Origin
Exhibit: C
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 – Test/Inspection Report (Production Acceptance Test Report) One production acceptance test report shall be included with each BPU ordered under this contract.
| Purchase Request(s) |
| PR Line Item(s) |
| * |
| * |
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
NOTES:
1) Government approval/disapproval within 20 days subsequent to receipt.
2) Requirement shall remain in effect until the acceptance of the last deliverable item on contract.
Item No.
DATA (ELINS F001 – F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
0011AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0011AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
0011AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option I. (The prices in Option I shall be applicable for the 12 month period immediately following the effective dates set forth for the Basic contract period. Option I may be exercised on or before the last day of the Basic Contract Period.) Specific dates will be established upon award of contract.
Option I
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
Amount
| 45 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 45 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 1001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
NOTE 2: Include all remaining unit costs and profit not proposed under the PSA.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
NOTES: Each unit will have the following pack up data fro each BPU:
1) 1 each pack up manual IAW CLIN 1003.
2) 1 each production unit acceptance test report IAW CLIN 1004.
Please note that for Contract Line Item Number (CLIN) 1002, offerors shall propose to the BEQ only. The total price for CLIN 1002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 22 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 22 EA |
TBD
Proposed Delivery
| TBD |
| 22 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
1005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
1005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
1005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option II. (The prices in Option II shall be applicable for the 12 month period immediately following the effective dates set forth for Option I. Option II may be exercised on or before the last day of Option I.) Specific dates will be established upon award of contract.
Option II
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 45 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Unit
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 45 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 2001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
1) 1 each pack up manual IAW CLIN 2003.
2) 1 each production unit acceptance test report IAW CLIN 2004.
Please note that for Contract Line Item Number (CLIN) 2002, offerors shall propose to the BEQ only. The total price for CLIN 2002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 22 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 22 EA |
TBD
Proposed Delivery
| TBD |
| 22 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
2005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
2005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
2005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option III. (The prices in Option III shall be applicable for the 12 month period immediately following the effective dates set forth for Option II. Option III may be exercised on or before the last day of Option II.) Specific dates will be established upon award of contract.
Option III
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 45 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Unit
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 45 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 3001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
Type / Ship To
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
1) 1 each pack up manual IAW CLIN 3003.
2) 1 each production unit acceptance test report IAW CLIN 3004.
Please note that for Contract Line Item Number (CLIN) 3002, offerors shall propose to the BEQ only. The total price for CLIN 3002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 23 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 22 EA |
TBD
Proposed Delivery
| TBD |
| 22 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
3005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
3005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
3005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option IV. (The prices in Option IV shall be applicable for the 12 month period immediately following the effective dates set forth for Option III. Option IV may be exercised on or before the last day of Option III.) Specific dates will be established upon award of contract.
Option IV
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 45 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 45 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 4001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
1) 1 each pack up manual IAW CLIN 4003.
2) 1 each production unit acceptance test report IAW CLIN 4004.
Please note that for Contract Line Item Number (CLIN) 4002, offerors shall propose to the BEQ only. The total price for CLIN 4002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 23 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 22 EA |
TBD
Proposed Delivery
| TBD |
| 22 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
4005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
4005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
4005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option V. (The prices in Option V shall be applicable for the 12 month period immediately following the effective dates set forth for Option IV. Option V may be exercised on or before the last day of Option IV.) Specific dates will be established upon award of contract.
Option V
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 45 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 45 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 5001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
| Type / Ship To |
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
1) 1 each pack up manual IAW CLIN 5003.
2) 1 each production unit acceptance test report IAW CLIN 5004.
Please note that for Contract Line Item Number (CLIN) 5002, offerors shall propose to the BEQ only. The total price for CLIN 5002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 23 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 23 EA |
TBD
Proposed Delivery
| TBD |
| 23 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
5005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
5005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
5005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option VI. (The prices in Option VI shall be applicable for the 12 month period immediately following the effective dates set forth for Option V. Option VI may be exercised on or before the last day of Option V.) Specific dates will be established upon award of contract.
Option VI
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 46 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 46 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 6001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
Type / Ship To
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 46 EA |
TBD
Proposed Delivery
| TBD |
| 46 EA |
1) 1 each pack up manual IAW CLIN 6003.
2) 1 each production unit acceptance test report IAW CLIN 6004.
Please note that for Contract Line Item Number (CLIN) 6002, offerors shall propose to the BEQ only. The total price for CLIN 6002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 23 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 23 EA |
TBD
Proposed Delivery
| TBD |
| 23 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
6005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
6005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
6005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Option VII. (The prices in Option VII shall be applicable for the 12 month period immediately following the effective dates set forth for Option VI. Option VII may be exercised on or before the last day of Option VI.) Specific dates will be established upon award of contract.
Option VII
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 46 |
| EA |
See Schedule Below
NSN: 6115-01-536-4373 EJ
BEAR Power Unit (BPU) Production Units
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
Please note that the BEQ for this item is 46 each; however, orders may be issued for quantities in excess of or less than the BEQ. Therefore, the Schedule below provides for a proposed unit price, applicable to any quantity ordered for this CLIN. Offerors are not permitted to propose a breakdown of quantity ranges and unit prices. The Price Subject to Adjustment is for direct material costs of Steel, Aluminum, and/or Copper structural products only. Offeror shall propose the quantity (in pounds) required for the manufacture of the stand(s), expressed at the unit level, and the material price(s)/unit subject to adjustment. The unit’s "Price Subject to Adjustment" plus the unit’s "Price Not Subject to Adjustment" equals the "Total Unit Price". The total price for CLIN 7001 shall be determined by multiplying the BEQ by the unit price as proposed below.
* Refer to the clause titled “Economic Price Adjustment (EPA) Determination” for additional information on EPA adjustments for all delivery orders.
| U/I |
| Price Subject to Adjustment (PSA) |
(Note 1) Price Not Subject to Adjustment
(Note 2) Total Unit Price
Structural Product
Material (Identified Below)
| QTY (lbs) |
| Price |
| Total |
| Steel |
| Pounds |
| Aluminum |
| Pounds |
| Copper |
| Pounds |
| Unit Price |
| EA |
NOTE 1: Per FAR 16.203-4(c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
Type / Ship To
| PACRN |
| Mark For |
| TBD |
| PAA |
| TBD |
| Required Delivery |
| Type / Ship To |
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 45 EA |
TBD
Proposed Delivery
| TBD |
| 45 EA |
1) 1 each pack up manual IAW CLIN 7003.
2) 1 each production unit acceptance test report IAW CLIN 7004.
Please note that for Contract Line Item Number (CLIN) 7002, offerors shall propose to the BEQ only. The total price for CLIN 7002 shall be determined by multiplying the proposed unit price by the corresponding best estimated quantity.
Item No.
Firm Fixed Price
| Best Estimated Qty |
| U/I |
| Unit Price |
| 23 |
| EA |
| $ |
NSN: 6115-01-536-4373 EJ
Mission Readiness Spares Package (MRSP) to support Production BPU
In accordance with Purchase Description PD05WRLEEG11 dated 14 August 2008 and Statement of Work dated 03 Mar 2008
| Purchase Request(s) |
| PR Line Item(s) |
| ACRN |
| * |
| * |
| * |
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements
| Title |
| Number |
| Date |
| Tailoring |
| ISO |
| 9001-2000 |
| 2000 |
FORMCHECKBOX
TYPE / SHIP TO CODE
F.O.B.
TBD ORIGIN
Type / Ship To PACRN Mark For
TBD PAA TBD
| Required Delivery |
| TBD |
ORIGIN
| Quantity (U/I) |
| **ARO IAW Delivery Schedule Requirements Clause |
| _ |
| Req No / Pri |
| TBD |
| 23 EA |
TBD
Proposed Delivery
| TBD |
| 23 EA |
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN C001 – Technical Manual Contract Requirement (Pack-up data)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN E001 - Test/Inspection Report (Production Acceptance Test Report)
Inspection: Origin
Exhibit: E
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
DATA (ELINS F001 - F003)
IAW DD FORM 1423s attached hereto
Exhibit: F
FOB: Destination
Purchase Request: *
PR Line Item(s): *
Item No.
7005AA
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F001 - Request for Deviation
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
7005AB
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F002 - Notice of Revision
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
Item No.
7005AC
Firm Fixed Price
| Quantity |
| U/I |
| Unit Price |
| 1 |
| LO |
| Not Separately Priced |
ELIN F003 - Engineering Change Proposals
Inspection: Destination
Exhibit: F
Quality Assurance: IAW DD1423
Government’s Required Delivery Schedule: IAW DD1423
NOTES APPLICABLE TO SCHEDULE:
1. * Denotes “To Be Cited” in each individual delivery order issued hereafter.
2. **ARO (After Receipt of Order) and DAC (Days after Contract) deliveries will be converted to firm delivery dates upon award of the first delivery order issued hereafter.
3. Applicable Ship To, Mark For, and Requisition Number will be identified on each individual delivery order issued hereafter.
4. A commercial warranty will be provided with each BPU. In keeping with commercial terms found to be common in the commercial marketplace, the price of the warranty is included in the price of each BPU and is not separately priced.
5. See the clause, “Delivery Schedule Requirements” for pertinent information relative to Government’s required delivery for the BPU preproduction and production units.
Accounting and Appropriation Chargeable
ACRN Funds Citation Amount Chargeable
| * TO BE CITED IN EACH INDIVIDUAL ORDER ISSUED HEREUNDER |
| $ |
FIRST DESTINATION TRANSPORTATION APPROPRIATION CHARGEABLE - FOB ORIGIN (FEB 2006)
The Accounting Classification that funds the acquisition of a Contract Line Item (CLIN) must be used to pay for its transportation on the CLINs listed in the table below.
Once the ACRN is determined, the Long Line of Accounting (LOA) and the MORD (SDN) Number associated with that ACRN shall be entered into PowerTrack to fund the transportation charges needed to transport the item.
| CLIN |
| Long Line of Accounting (LOA) |
| MORD Number(SDN)/ |
MORD ACRN
| * |
| * |
| * |
* To Be Cited in Each Delivery Order Issued Hereunder
Offeror’s Remittance Address: ___________________________________
(Offeror To Complete) 9952.232-9002
TRANSPORTATION APPROPRIATION CHARGEABLE (JALC) (MAR 2003)
(IAW JALC 9932.705(90))
The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".
Insert 3 if movement via surface mode or 2 if movement via airlift in place of any "#" shown.
Insert last digit of current fiscal year in place of any asterisk "*" shown when material is shipped.
| TAI |
| ATAC |
| NOTE |
| * |
| * |
| * |
* To Be Cited in Each Delivery Order Issued Hereunder
PREPRODUCTION TESTING
(Feb 2008)
(a) Preproduction unit testing is a requirement of this contract. Performance or other characteristics, which the preproduction unit must meet, and detailed technical data requirements for examinations, tests, and analyses of the preproduction unit (including necessary data to be submitted) are as set forth in this solicitation and attachments. After preproduction unit acceptance, the contractor shall establish and maintain configuration control. One (1) accepted preproduction unit shall serve as the manufacturing standard. All further units shall be produced to the same design and using the same parts as the preproduction unit.
(b) Test Plan/Procedures: The Contractor shall submit preproduction unit test procedures as required by CLIN 0003AA within 240 days after the effective date of the first funded delivery order. Within 45 calendar days after the Government receives the preproduction unit test procedures, marked ELIN A001, Test Plan/Procedures, the Contracting Officer will notify the Contractor, in…