CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY

TDP X TM OTHER

D. SYSTEM / ITEM

F-15 TISS

E. CONTRACT / PR NO.

FD20601700203

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

IUID Marking Activity, Validation and Verification Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-81804A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para: 3.1.3

6. REQUIRING OFFICE

410 SCMS/GULA

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Pham, Phong DNAME: 07 DEC 2016DATE:

Blk 4: Contractor format is acceptable.

Blks 10, 11, 12, and 13: The Contractor shall deliver an IUID Marking Activity and Verification Report. The report shall contain a brief narrative of accomplishments, NSNs marked, and registry status. The Contractor shall deliver a IUID Marking Activity and Verification Report 90 days after the first NSN has been marked and quarterly thereafter.

The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected, the Contractor shall have 10 business days to correct any errors and return a corrected IUID Marking Activity and Verification Report to the Government for review.

Blk 14: Document submission shall be made electronically via MS Office (Power Point, Excel, or Word) 2010 format.

Final submittal both via Email addresses and in Wide Area Work Flow (WAWF). Submittal in WAWF will be accepted/approved by Government personnel. When information is submitted in WAWF the contractor shall provide email notification to email addresses below:

Program Manager adam.wiley.1@us.af.mil

Program Engineer phong.pham@us.af.mil

Program Equip Specialist elbert.scarborough@us.af.mil

COORDINATORS:

Program Engineer, Attn: Phong Pham

410 SCMS/GUEA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

Program Equipment Specialist, Attn: Elbert Scarborough

410 SCMS/GULA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

Program Manager, Attn: Adam Wiley

410 SCMS/GULA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

3 3 015. TOTAL

G. PREPARED BY

Sanders, Audrey K

410 SCMS / GULA

478-222-2226

H. DATE

16 DEC 2016

I. APPROVED BY

//DIGITALLY SIGNED//

HEADLAND.PAUL.D.1246894490

410 SCMS / GUEA 478-327-3038 / 497-3038

J. DATE

15 DEC 2016